HomeMy WebLinkAboutWTR2701428.20GENERAL NOTES
9 Paf7`<,-17 To
MGtch Ex%s1io9
,,-/1/eur 41o/7erel`e !vo/*
E,risfii7y �`
Z_r/ e,-75%o/7 _/Oh
ConCIcle ` alAr e01751/-LICAion De1o1/
GENERAL NOTES:
- Forms shall be either wood or steel and shall meet all APWA
specifications.
- Concrete shall be Class 5 (1z) or 50/4).
- Procedures for installation shall be in accordance with APWA
specifications.
- Concrete walks shall be removed to nearest construction joint. If
distance to construction from edge of proposed excavation is greater
than 10' the walk may be saw cut and new construction joint installed.
- Concrete walks shall meet all requirements as outlined by A.P.W.A.
standard plan No. 14 1981 Edition and the City of Renton standards.
SITE WORK GENERAL NOTES:
1. ALL PIPE SHALL BE LAID ON PROPERLY PREPARED FOUNDATION ACCORDING TO
WASHINGTON STATE SPEC. 7-17 1985 EDITION. THIS SHALL INCLUDE NECESSARY
LEVELING OF THE TRENCH BOTTOM OF THE TOP OF THE FOUNDATION MATERIAL
AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO
UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED
ON A UNIFORMLY DENSE UNYIELDING BASE. IF THE NATIVE MATERIAL IN THE
BOTTOM OF THE TRENCH MEETS THE REQUIREMENTS FOR "GRAVEL BACKFILL FOR
PIPE BEDDING" THE FIRST LIFT OF PIPE BEDDING MAY BE OMITTED PROVIDED
THE MATERIAL IN THE BOTTOM OF THE TRENCH IS LOOSENED, REGRADED, AND
COMPACTED TO FORM A DENSE UNYIELDING BASE.
2. ROOF DRAIN LINES SHALL BE P.V.C. SCHEDULE 80 OR CONCRETE ASTM C-14
CLASS 3.
3. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ONE OR MORE, OF THE
FOLLOWING SPECIFICATIONS:
A. AMERICAN PUBLIC WORKS - APWA STANDARD SPECIFICATIONS FOR MUNICIPAL
PUBLIC WORKS CONSTRUCTION - 1981 EDITION.
B. CITY OF RENTON STANDARDS.
4. PROVIDE CLEANOUTS IN BUILDING DRAINS AT ENDS, BENDS (45' MAX. PER
BEND) AND AT 100-FOOT INTERVALS.
TIE ROD SELECTION TABLE
���ssoosm
minim
lit Doti
STAR SUMT tDUORATIOM OR tQUAt
rl
CAST ON LUGS TIE BOLT
FIRE HYDRANT AND GATE VALVE
NOTES:
1. STEEL FOR TIE RODS SHALL HAVE AN ULTIMATE STRENGTH OF 40,000
PSI OR MORE.
2. TIE SHALL HAVE NATIONAL COURSE THREADS WITH AT LEAST TWO NUTS
AT THE END OR ONE SELF-LOCKING NUT.
3. STRENGTH OF SPECIAL DEVICES USED FOR TIE RODS ATTACHMENT
SHALL BE SUFFICIENT TO TRANSMIT THE FORCE TO THE PIPE.
4. TIE RODS SHALL BE GALVANIZED AND COATED WITH 2 COATS OF
KOPPERS COMPANY, INC. BITUMASTIC 300-M. (16 MIL MINIMUM DRY
THICKNESS)
5. STEEL ROD COUPLINGS SHALL NOT BE USED TO CONNECT TWO TIE RODS
IN ORDER TO GET ADDITIONAL LENGTH.
Tein�o�v�y c4P�, tll �d
WI Ternoor4ry B/ow-
nn " Of/' Ass - -
, eolp'in4i! 6117e.11
/2
Le.7, fIhS ,4s 1,FeQ'. /
Depth Of
Through Joint
10•• -�
2,f2 , I " 5.. 11, 2'1z �f
r+
io
93 Deformed Burs --
AS%Aof Ocsiy. A -/S
Al 77S.
I
1
I
I /
Exisr /Z��GYO�Cr ,y0/�1
TEST C0A:A/EC7701V
Al. T. S.
(Ty o, Bo ffi CC 7necti ons)
M
Z
1. All work materials shall be in conformance with the standards and specifications of the
City of Renton Utility Department and the latest edition of the WSDOT/APWA Standards and
Specifications. A set of approved plans shall be kept on site at all times during
construction.
2. The hours of work in the street right-of-way shall be limited to 8:30 AM to 3:30 PM on
weekdays unless otherwise approved in writing by the Department of Public Works at 235-
2635. All street closures, partial or full, shall be approved by the Department of
Public Works 24 hours in advance. The Police Department, Fire Department, and 911 shall
be notified 24 hours in advance.
3. All locations of existing utilities shown are approximate and it shall be the
contractor's responsibility to verify the true and correct location so as to avoid damage
or disturbance. For utility locate call 48-Hour Locators, 1-800-424-5555.
4. All water main pipe to be cement lined ductile iron pipe conforming to AWWA C110 and
C111 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall
conform to AWWA C104 or latest revision. Pipe joints to be push -on or mechanical joint.
Bedding to be class C. All ductile iron pipe installed South of Sunset Blvd. (Empire
Way, SR 900) and West of SR 167 (East Valley Freeway) or in soils of high resistivity
shall be polyethylene wrapped per ANSI/AWWA C105-77 Standards.
5. Cast iron and ductile iron fittings shall be cement lined, pressure rated as noted on
plans, and in accordance with ANSI/AWWA C110/A21.10-82. Cement lining shall -be in
accordance with ANSI/AWWA C104/A21.4-85. If fittings are 3 inches to 12 inches in
diameter and have mechanical joints, the fittings shall be in accordance with either
ANSI/AWWA C110/A21.10-82 or ANSI/AWWA C153/A21.53-84. 3-inch to 12-inch diameter
fittings which have mechanical joints and/or flanged joints shall be in accordance with
ANSI/AWWA C110/A21.10.82 or a combination of ANSI/AWWA C110/A21.10.82 and ANSI/AWWA
C153/A21.53-84 such that the portion of the fitting with a mechanical joint(s), may be in
accordance with ANSI/AWWA C153/A21.53-84 and that portion of the fitting with flanged
joint(s) shall be in accordance with ANSI/AWWA C110/A21.10-82. Acceptance testing in
accordance with section 53-5.3 of ANSI/AWWA C153/A21.53-84 or with section 10-4.3 of
ANSI/AWWA C110/A21.10-82 shall be obtained by the contractor and transmitted to the
owner.
6. Gate valves shall conform to AWWA C500 and shall be iron body, bronzed -mounted, double
disc with bronze wedging device and 0-ring stuffing box. Valves shall be designed for a
minimum water operating pressure of 200 PSI. Gate valves shall be Clow List 14, Mueller
Company NO. A2380, or M&H. All valves 12" in diameter and larger, shall be installed in
a vault. See water standard detail for 12" Gate Valve Assembly Vault and 1" Bypass
Installation.
7. Fire hydrants shall be Corey type (opening with the pressure) conforming to AWWA C-504-80
with a 6 inch inlet and a M.V.O. of 5 inches, two 2 1/2 inch hose nozzles with national
standard 7 inch, 60 degrees V. threads, O.D. thread 4.875 and root diameter 4-6263, 1-
3/4 Sh4c/s/e 1/4" pentagon operating nut opened by turning counter clockwise (left).
Rods
8. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below
finish grade. All water main 12 inches and larger shall be at a minimum of 48 inches
Z below finish grade. Where utility conflicts occur, water mains are to be lowered to
clear.
Sec tlon
_D
Ur�diS furbea�
N � -
�'
Earth
- -
/Z"D.I.
/2"
o
Lc�gfhs .4s freQ o�
Alalel",9i,7(�0 . 111b/7 Ae�,ove�
I; ;
U.,o% ��oPosco/B/o/9- shall
Ocoa/rron B/oc,�r To
f�einoi�.In P/oce
f�errfo� i%ty Yo�o!J
shacl-Oe 1:?0,5'
)
;?1-0 J0/r2t
AL
\_
r
---
__
3/4'Sl/ Tie f>'ods 20 Be Er '�ded
i9em011t CoP ;�/ci9
i �/ T New /Z" JO' Bono! TyPico/
Aadl�s�o///Z"
i I Af Eoch P/occ Sho�cn-
C I So/io/ S/CC ✓e
Unca'i�7`urbed
1,5 i
1.�'oo'mor, B/oc,<r To
1-Te17A7i17 In 1'0/occ
v
I
Exist /2'lij/a�e r /L/Q//7
�
P/an
FINAL CO/VNECr/ON
Al T• S.
(TyP Both CO, 2rJeC74io/7.5)
DEADMAN &0CKIN4 DETAIL
41. T, .S.
4 -9 ,P • . O
Note: A// Cor�crefe
B/ocfsir�qq 5174// be
Per 41:1W { 5ec741or2
74 - 2,14.
3/4 Bo/f Iil/crsher
Embedded 5'' /r/ Cow ,
DEEAOMAN OGOCK/NU DEr,�4/L
Al, T. 5,
mD�
9. All water mains shall be pressure tested and disinfected in accordance with the
specifications of the City of Renton and the Washington State Health Department. All
pressure testing shall be done in the presence of a representative of the City of Renton.
10. A preconstruction conference is required prior to any construction. A minimum of 3
(three) working days notice is required for scheduling. Prior to scheduling the precon a
permit information sheet must be supplied to the Utility Engineer's Office. Twenty-four
hour notice will be required prior to starting new construction.
11. It shall be the contractor's responsibility to secure all necessary permits prior to
starting construction.
12. Installation of corporate stops, water services, lines and meters shall not be done until
all service agreements, meter applications, construction permits, and payment of fees
have been made to the City of Renton.
13. All connection to existing mains to be accomplished by the City of Renton, except wet
taps which may be made by approved wet tap contractors with prior approval of from the
Department of Public Works. All necessary excavation and materials to be supplied by the
contractor and be on -site prior to City notifications.
14. Inspection will be accomplished by a representative of the City of Renton. It shall be
the contractor's responsibility to notify the Utility Department 24 hours in advance of
backfilling all construction. The contractor as well as the Engineers shall keep as -
built drawings.
15. Contractor to provide plugs and temporary blow -off assemblies for testing and purity
acceptance prior to final tie-in.
16. All joint restraint systems (shackle rods, nuts, bolts, etc.) shall be as manufactured by
the Star Manufacturing Company of Columbus Ohio or equal approved in writing by the
Department of Public Works.
17. Asphalt and concrete street paving shall be sawcut to a minimum depth of two inches. Oil
mat streets may be spade cut. All surface concrete, pavement, sidewalks, curb, gutters,
and driveway approaches shall be sawcut to a minimum depth of two inches or removed to an
existing expansion joint.
18. A temporary cold mix asphalt patch shall be placed on the day of initial excavation with
a permanent, sealed patch to be placed, to City of Renton policy, within ten days. Call
for subgrade inspection prior to placement of final patch. Trenches will not be left
open over night without prior written approval of the Inspector.
19. For City projects such as telemetry conduit, the PVC pipe used shall be schedule 40 in
unimproved areas and schedule 80 under improved areas. All chemical process lines shall
be schedule 80 PVC pipe.
20. Concrete thrust blocking shall be provided at all bends, tees, valves,
or other appurtenances where internal forces require restraint.
Blocking shall be in accordance with the City of Renton Utility
Department Standards.
21. The callout on plans of the degree of bends in the water line is based
on plan information and the assumption that the difference in the
bend and actual angle can be accomplished by joint deflection. If
construction methods dictate different or additional bends, these
will be installed by the Contractor at his expense. If field conditions
dictate different or additional bends, these will be installed at
the contract price.
22. All disturbed areas shall be seeded and mulched or otherwise stabilized
to the satisfaction of the Utility Department for the prevention of
on -site erosion after the completion of construction.
WATER MAIN RELOCATION,
ROOF DRAIN LINE AND
FOOTING DRAIN LINE PLAN
it
T
.�
O;
N
L
J
t/1
-a
N
N
^�
co
c
ro
N
v
Z
N
.�
C
C
c
C:
W
o0
N
<
C
z
Al
Q
5
C:
<
J
oYc
Y
1r
O
S
Z
Z
O
iy
1-4
0
94
I
<
Q
y
a
W
Z
a
a
o
Z
w
r�C
0
b
Q
•o
b
O
C
�
a
O
V
0.
bq,
O
a
Q
m
�
�
0
N
Drawn
W.lk1ol_is
Designed
!�/ d4o��is
Checked
Date
Scale As /vo%d
SHEET NO.
C6
SUN
JOB NO
5799.01