Loading...
HomeMy WebLinkAboutWWP2701428.26" its Re ui/'ed 40,- Plo e /ns lallo74 o/n Undisturbe �� JI Eo�fh - 1 1 1 Pipe Beddin ,oe� _ S C//7 / fa%' y c0 Sewer 2 /ne c v 32" PAVEMENT PATCHING DETAIL CRA TL GRA VEL 4 1'-2' SUAIP AROUND CATCH BASIN CATCH B4SIN No Stole At i TOP VIEW SLAP AROC#40 CATC f BA57d FL TER FAiIRPC L#CICR GRATE COr'.C. SL OOr Ma tch E X. As101 �1_ f Thieis -less FRAME 8c LADDER OQ STEPS tz EX. /�Gl/e/ne/77` OFFSET'. SEE NOTE 5. FRAME COVER ELEVATION 48.2 6 "Min.// Corr/oacfed Zlwshed s1e /`M/nU_5 3'i�4 /M/nU5) OVEQFLOW ELEV.TO PROVIDE DETEf mow a OIL SEPARATION 95% Corn/oacted Qa,,,7/k/-?//n PE2 PLANS ��- FILTER FABRIC GRAVEL UNDER GRATE GRATE pk, r/- { ' '• DO'TH BELOW ' �• / Top OF BLOCK CONC. BLOCK SIDE VIEW TEMPORARY SEDIMENT TRAP FOR CATCH BASIN NTS Z V -DITCH DETAIL N TS 3� DITCH (TESCP) WITH CHECK DAM NO SCALE RECOMMENDED FOR APPROVAL BY DATE M141 FZEEBG6 eP O.F PIPE SUPPOP-T(S): +� 3" X .090 GAG E F BOLTED OR IMBEDDED 2" IN WALL AT -MAX. 3' SPACIWG. MIN ONE 5UPPORT. ROUND SOLID COVER MARKED "DRAIN"' WITH LOCKINCt BOLTS. SEE OWG:S, No 49 &50 KC_ ZS. STAN DARD GALVAN IZ E D STEEL LAE)[) STEPS. SEE DWG. No 35-CCRS. MAX' 4 S. CLEA.NOUT GAM : SHEAP, r (SAT-E. SEE Owl;. Na 53 KCPs11 / SEE NOTG INLET PIPE OR PIPES :�.'. INVERT ELEV i PER PLAN . AV 7 . _0 ; RESTRICTOR PLATE N REMOVABLE WATER- W IT ti 2 " 0 4e/F/CE • , TIGHT COUPLING - o Z 0 -N PLATE WIT 0° 36 EE, 32 .30 NOTES: 1 . SEE C�/A/L C!J[1.U7 y !+/�I7�e /�kfMr O/✓. B[/LL &-PA/ "Md[F/ilE OeifilES' e^ _SE,rT. 2. PIPE SIZES AND SLOPES: PER PLANS. J. OUTLET CAPACITY: NOT LESS THAN COMBINED INLETS. 4. METAL PARTS: CORROSION RESISTANT. GALVANIZED PIPE PARTS TO HAVE ASPHALT TREATMENT 1. S. FRAME 8 LADDER OR STEPS OFFSET SO A. CLEANOUT GATE IS VISIBLE FROM TOP. B. CLIMB -DOWN SPACE IS CLEAR OF RISER AND CLEANOUT GATE. C. FRAME IS CLEAR OF CURB. 6. IF METAL OUTLET PIPE CONNECTS TO CEMENT CONCRETE PIPE: OUTLET PIPE TO HAVE SMOOTH O.D. EQUAL TO CONCRETE PIPE I.D. LESS 1/4". 7. MULTI -ORIFICE ELBOWS MAY BE LOCATED AS SHOWN OR ALL ON ONE SIDE OF RISER TO ASSURE LADDER CLEARANCE. N ELBOW DETAI :.� .• .: O IFICE AS R SPEC. CATCH BA51N -TYPE 2 Dw rl'law Elav - 7b be F/e/d Adiustid 1• 'i � I • 1 \ � . • ,. hbshcd brow/ /O' GNP Arry A/ot z 4 ` 4CMP �/Y' PipG • ' (� �I w.•� ' • 1 • .�• I • • • • . I f • • C.., l ( • 1 . t • Irrr I ' to 1 ' { /O' GMP Discho�9� PiPin Top 33. 96 lnv. 29.3/ /2" S 29.21 12" N 29. 2/ 6 "E i Top 36. 50 /n ✓. 29.56 SANITARY SEWER PROFILE Scale : / "= 20 ' Al /" - 2, V PROJECT DATUM: FOR PROJECT DATUM SEE TOWNSEND-CHASTAIN 6 ASSOCIATES "VALLEY MEDICAL CENTER SITE TOPO" JOB NO. 86043. TOWNSEND-CHASTAIN VERIFIED PROJECT DATUM, 8/25/87 WITH THE FOLLOWING CITY OF RENTON BENCH MARK: CHISELED SQUARE AT N.W. CORNER CONCRETE WATER VAULT, WHOSE LOCATION IS 50' NORTH OF CENTER LINE OF S.W. 43RD + 50' EAST OF EASTERLY RIGHT OF WAY LINE. ELEV=85.22. FOUND ACTUAL 3RD FLOOR ELEVATION OF HOSPITAL TO BE 89.90. TOWNSEND-CHASTAIN TOPO SHOWS 89.98. TO ACQUIRE CITY OF RENTON DATUM 0.08 SHALL BE SUBTRACTED FROM DESIGN ELEVATIONS. PIPE SCHEDULE PVC SDR 35, GASKET JOINT - ALL SIZES BEDDING, CLASS B, TYPE I OR II CMP APWA TREATMENT I REQUIRED ON ALL GALVANIZED STEEL PIPE. ALL SIZES OF GALVANIZED STEEL BEDDING CLASS B TYPE I. 8" 16 GA. AL. OR GALV. STEEL 12" 14 GA. AL. OR GALV. STEEL 18" 12 GA. AL. OR GALV. STEEL 21",24" 12 GA. AL. OR 14 GA. GALV. STEEL 30" 12 GA. AL. OR 14 GA. GALV. STEEL 36" 12 GA. AL. OR 14 GA. GALV. STEEL EROSION CONTROL GENERAL NOTES: 1. All construction shall be in accordance with the City of Renton's Development Standards, Renton City Code, Permit Conditions, and all other applicable codes, ordinances, and policies. 2. All limits of clearing and areas of vegetation preservation as prescribed on the plan shall be clearly flagged in the field and observed during construction. 3. Where possible, maintain natural vegetation for silt control. 4. All required sedimentation/erosion control facilities must be constructed and in operation prior to land clearing and/or other construction to insure that sediment laden water does not enter the natural drainage system. All erosion and sediment facilities shall be maintained in a satisfactory s a c[or condition un til such h time that clearing a to 8 and/or construction is completed and potential for onsite erosion has passed. The implementation, maintenance, replacement and additions to erosion/sedimentation control systems shall be the responsibility of the permittee. 5. The erosion and sedimentation control systems depicted on this drawing are intended to be minimum requirements to meet anticipated site conditions. As the construction progresses and unexpected or seasonal conditions dictate, the permittee should anticipate that more erosion and sedimentation control facilities will be necessary to insure complete siltation control on the proposed site. During the course of construction, it shall be the obligation and responsibility of the permittee to address any new conditions that may be created by his activities and to provide additional facilities, over and above minimum requirements, as may be needed to protect adjacent properties and water quality of the receiving drainage system. 6. Any disturbed area which has been stripped of vegetation and where no further work is anticipated for a period of 30 days or more must be immediately stabilized with mulching, grass planting or other approved erosion control treatment applicable to the time of year in question. Grass seeding alone will be acceptable only durng months of April through September inclusive. Seeding may proceed outside the specified time period whenever it is in the interest of the permittee, but must be augmented with mulching, netting, or other treatment approved by the Department. 7. All erosion/sedimentation control ponds with a dead storage depth exceeding 6 inches must have a fence with a minimum height of 3 feet. 8. Prior to occupancy of the building, the permanent storm drainage system shall be cleaned by pumping (not into the storm drainage system) or other method as approved by the Storm and Surface Water Utility. All downstream catch basins shall be checked for sedimentation build up GENERAL NOTES 1. All workmanship and materials shall be in conformance with.the standards and specifications of the City of Renton, Public Works Department, and/or King County and APWA Standards and Specifications, latest Edition. 2. All locations of existing utilities shown are approximate and it shall be the Contractor's responsibility to verify the true and correct locations so as to avoid damage or disturbances. 3. Storm drain pipe shall be type as indicated on the plans. See pipe schedule for gauges. If steel is used, it shall be APWA Treatment 1. 4. 1.5 foot minimum cover over CMP; rubber gaskets required. 5. Offaite streets are to be kept clean at all times. 6. Boundary and Topographic information have been provided by others. 7. All existing utility elevations to be confirmed prior to construction. 8. Site plan horizontal control and dimensional data is shown on Architect's site plan. 9. Provide cleanouts in building drains at ends, bends (45' max. per bend) and at 100-foot intervals. 10. The storm drainage system shall be constructed according to the approved plans which are on file in the Department's Central Records. Any deviation from the approved plans will require written approvel from the Department. 11. A copy of these approved plans must be on the job site whenever construction is in progress. 12. Before any construction/development activity occurs, a pre -construction meeting must be held with the Department's Development Inspection Section. 13. All sediment/erosion facilities must be in operation prior to clearing and building construction, and they must be satisfactorily maintained until construction is completed and the potential for on -site erosion has passed. 14. All retention/detention facilities must be installed and in operation prior to or in conjunction with all construction activity unless that activity exceeds the capacity and intent of the erosion/sedimentation control facilities or unless otherwise approved by the Department. 15. All distrubed areas shall be seeded and mulched or otherwise stabilized to the satisfaction of the Department for the prevention of on -site erosion after the comDletion of construction. 16. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with section 7-02.30 ), 7-04.3 6 7-17.3 of the curre nt State of Washington Standard Specifications for Road and Bridge Construction. This shall include necessary leveling of the trench bottom or the top of the foundation material as well as placement and compaction of required bedding material to uniform grade so that the entire length of the pipe will be supported on a uniformly dense unyielding base. Pipe bedding shall be pea gravel 6" over and 6" under pipe. Trench backfill shall be import and shall be per APWA Section 9-30.7(3). 17. Construction of dewatering (groundwater) system shall be in accordance with the APWA Standard Specification, Section 61-3-02. (1981 Ed. APWA) 18. Galvanized steel pipe utilized as detention facilities shall have asphalt treatment #1 or better inside and outside. 19. Structures shall not be permitted within 10' of the spring line of any storm drainage pipe(s), or 15' from the top of any channel bank. 20. Due to the lack of as -built plans concerning the existing storm system, existing storm line configurations may not be as indicated on the design plans. It shall be the contractor's responsibility to verify their correct locations and if different from the locations shown, the engineer shall be notified prior to commencing construction. 21. A four inch (4") perforated pipe shall be installed within the downstream end of the detention pipe's bedding for a minimum length of twenty feet (20') and then tightlined to the nearest catch basin downstream of the control structure. 22. All catch basin grates shall be depressed 0.10 feet below pavement level. 23. All backfill shall be imported structural fill in accordance with APWA 28 , A_Q<�QA11141 .ITY OF RENTON FILING NUMBER S-485 !AL SHEET 2 OF 2e`rs/ MAHWM & NORDFOR9 Seattle, WA 98121 25,05 Third Avenue (206) 441-4151 KAPLAN McLAUGHLIN DIAZ 222 VALLEJO STREET SAN FRANCISCO CA 94111 415-398 5191 NO. 1 REVISIONS DATE DESCRIPTION SCALE DATE 8/8/88 HEET TITLE ANITARY SEWER D STORM DETAILS SHEET C 3 VVI