HomeMy WebLinkAboutWTR2701429.2GENERAL NOTES
L All work shall, be in accor dace with the City of 0-nfnn
Standard Specifications and these plans.
2. The locations of features shown are approximate and
shall be verified in the field by the contractor as
necessary.
3. Install all street lighting materials shown on the
plans, except as noted. All materials shall be new and
of the best available grade or quality, except as noted.
4. The contractor shall submit a request to the City of
Renton for materials approval at the earliest possible
date.
5. All work shall be consistent with utility agency
requirements. The contractor shall contact all
pertinent utility agencies 48 hours before commencing
work, and shall coordinate the work with the utilities
throughout the project.
6. The contractor shall be responsible for any damage to
existing utilities. The contractor shall notify the
affected utility company and the City immediately upon
damage.
7. The contractor shall notify the City of Renton Traffic
Engineering Division (235-2620} for inspection purposes,
24 hours before comsencing work. No work shall be
covered until it has been examined by the engineer.
3
5404.46
NEW CONTACTOR
CABINET —�
4
Ld
Z:
O
IRA-
e
1/ . 3544E
I2+40.89
a
41
25' 2
.i
O
CO �-
00 -�
J
� d
45E LQ
LC)
rJ • � ' 2
O
NE, 7,3 th . S TREE
� fir` •—.. =- . �T ��� ' �,.; • .-
3543E
N
STORM
9 °33'00" W 725.964'
vi
vi
ci
O
/2
■
h
•I• I
..,13
Q
I. v
1•
CONSTRUCTION, NOTES
CONTRACTOR SHALL INSTALL LUM/NAIRE
NUMBERS 3543B, 3544B. AND 3545B WITH
ALL APPURTANCE^ "^ ^"^'•'•'
JUNCTION BOX TYPIC
SEE DETAIL SHEET C
8.50
FH STANDARD DAVIT POLE, IZE AS REQUIRED
SEE DETAIL SHEET C7OF C 7
7
WIRING SCHEDULE
R€III
CONDUCTORS
CONDUIT
znl�
2 NO. 8, USE-XLP
l 112 PVC SCH 40
2 NO.8 USE-XLP
2
/ NO.8 BARE,STRANOED
/ 112 PVC SCH 40
[ZI
2 NO.8 USE-XLP
/ 112 PVC SCH 80
LEGEND
LUMINA/RE 100 WATT
SODIUM VAPOR FLAT LENS, NEW
EXISTING LUM/NAIRE
CONDUIT PVC SCHEDULE40. ALL STREET
CROSSINGS PVC SCHEDULE
80 1 I/2" ,SIZE MIN.
EXISTING CONDUIT
✓=11 JUNCTION BOX, TYPE I
EXISTING CONTACTOR CABINET
r �r'NDED
FOUR A MIROVAL
ri
!STING CONTRACTOR CABINET
A 2+50
L UMI NA I RE SHEDUL E
3+98, 23' RT
3543E
dBLA/NE
NE. /3tn S'
r1
25•
- °
1001240
NEW
1/+98, 5/' RT.
35448
AVE NE.
A.-1
25,
1001240
NEW
/ O+ 78, 23' RT.
3545E
Ri_A /NE AVE. NE.,
A-1
25,
w '
1001240 1
NEW
CONTRACTOR CABINET 1EX/STINGI
TYPE III 1201240 GROUNDED NEUTRAL SERVICE
CIRCUIT MAIN BRKR. BRANCH BRKR. CONTRACTOR
AMPS AMPS AMPS
M I } GOA — —
A - t 15AI240 30A
ONTROL 15AII20
rR 20A/120
SCALE 1*"' = 20'
1429 s
"AS BOIL T" PREPARED FROM FIELD SURVEY y'*
„ ;
BY T O LIMA ENGINEERS` 4
4
8
\� H. j, �y
® ®•��of M1.1s,� •
.
TR o
I
APPROYED BY S q ,, e d �� 1.4 ie. f ®� °®••tea � F ���
f
� iceu�s¢cy �a odd cho��ye
bz �.
NO. REVISION
Olt,
BY JAPPR.1 DA TE
40
�c
Cl TY OF REN TON
DEPARTMENT OF PUBLIC WORKS
SWAN MEADOWS 2
STREET LIGHT PLAN
BLAINE AVE. NE. & NE. 13th STREET
DESIGNED MT FEBRUARY r989
DATE FILE N0.589-002-881
DRA WN MT
CHECKED MT SCALE r" a 20' FIELD BOOK
APPROVED C(. SHEET C s -)F_C7_