HomeMy WebLinkAboutWWP2701432.10CONTRIBUTOKY SY�AM
C•
a0 00
a
a ^�oQgo0. 0 2-45" CULVERTS -LE►.1GTN
EAr-"
I �\ Oo PROVIDE 60 G.Y. SCOUR
° PROTEC1101IJ ROCK- 11,1CLUDE
11J LUMP SUN& BID ITEM
C'
HONEY CREEK
o �
e7
o
END OF GRAVEL
ACCESS ROAD
\ 8
I' MIN. COVER
oQo
u o
o Q Q a 0 o
PROVILE
r— STREAM PROFILE
CULVERT INSTALLATION STA. 68 + 50
N.-r' S.
LUMP - 5UM BID ITEM
-re, ry
G o ry ae/H
1
/r�'d 79.0
4e'r ! 7AW
L OAs "
Dit7X�Q�r+eC �S Ae 4i
N i PS" 4) .
A su"<
:?It�INi
�ST�C/.ck+CRS NoTT.Ww,�
au
I
1
!
NOTE-'- AL7Et2,NATt 6P IH)6E TO SIJQ�TITUTE FOR LoCa 6RI061E
PROVIDC ALL_ NAILIICU CONNECTION DETAILS
PROPOSED FOR ENC�R, AP1129OVAL.
ww,o-27-
FERG(J" a SONS ANC 81518
PIPELINE MATERIALS SCHEDULE
Material Alternate 1/
Schedule Materials -
I ACP
PVC (Pressure)
CIP or DIP
II CIP or DIP
III VCP
PVC (Sewer)
CIP or DIP
IV CIP or DIP
SP
po I
Y ON LCf ♦iCTIX/Z
cAa _ r o . Hilt..
WATER
PERPENDICULAR CONSTRUCTION
Zone Gravity Sewer 2/
A Material Schedule III with approved
mechanical compression joints.
4.
6 Material Schedule II with no joints
in zone or Material Schedule I in
steel casing.
C Material Schedule I encased in
concrete or same as Zone B.
D Do not locate sewer in this area.
E Same as Zone A.
1/ Pipe !Material Abbreviations:
ACP - Asbestos cement pipe
PVC - Polyvinyl chloride pipe
CIP - Gray cast iron pipe
DIP - Ductile iron pipe
VCP - Vitrified clay pipe
SP - Steel pipe - ASTM A-120-SCH 40
PARALLEL CONSTRUCTION
If a sanitary sewer is to be located within
10 feet of a pressure water main within any
of the above indicated zones, special con-
struction will required as shown below.
Pressure Sewer
Do not locate sewer in this
area.
Same as Zone A.
Material Schedule II with no
joints in zone or Material
Schedule I in steel casing.
Same as Zone A.
Same as Zone C.
2/ Mechanical joints are bolted joints
or reinforced concrete collars.
Compression joints are rubber ring
or gasket joints.
Steel casing are 1/4" thick with
all voids pressure grouted with
sand -cement grout.
WATER/SEWER CLEARANCE A MATERIAL RFAl11Rl-ucuTe
n�n�r
r libR/ �F-A GL ** "./!a r
'��8 TI-IIC�w4'�.JIDE_
57L PLATE /oX/0 •u »:
o t �cr�s
E'II
�1
� NAY•
79TD
l✓iea /G. �N 1>va)
in
M ARKEK POST
\ � s
I TTT
_t
ANGLED FITTING I
AS 5PECIFI ED
ow SHEET '7 —_1
b" O.I. PIPE
WYL (FLa FLxP
5LIMD FL.A1QGE
---COMC. SLAB -3'-O"x
3'-0" x e)" THICK
EXIST. GRADE
S" D.I. PIPE
CLEANOUT W/ VERTICAL BEND
NJ T. S.
INTERCEPTOR LATERAL TO WE 17TH PL.
;, '/ J RECORD CONSTRUCTION DRAWING
HAMMOND, COLLIER & WADE- LIVINGSTONE %.�, y I DRW(MODIFIE.cToREELECT
ASSOCIATES, INC. �.'� �'�, NCLusivla OF CONST
CONSULTING ENGINEERS +�,►� WA9t OgSER�/�.-ri
CAN I�tCOR�S 0010 STONE WAY N $EAT TLE WA SMINGTON 98 103 tMN, 1,N iYMiN
� (206) 632-2660
NO. REVISION
RICK G�.
cv0 a WASti,
t
`,�k.
ss/OhAL E*4\
Fill I F A
BY IAPPR.
1
1 14 32mf V
N
C_Jet
CITY OF RENTON
�.. DEPARTMENT OF PUBLIC WORKS
HONEY CREEK - PHASE 2
DETAILS
3- 20 - S& DESIGNED F' G' K- DATE 4 . 6 S FILE NO. 2650
DRAWN M , K
CHECKED
FG K SCALE 'AJ0 l EQ FI[LD NOOK-1-IJ-PAGE
DATE APPROVED SHEET IO OF 10