Loading...
HomeMy WebLinkAboutWWP2701432.2LEGEND / UABION WALL -SEE. DETL\IL I'S TYPICAL CUT SLOPE :1 MAX. STEEPNESS SLOPE. ROCKI►.IG- SEE DETAIL 15� �1N C 6 11ERM4,KILK\7 ACCESS ROAD S ... (n" OR 8" SERVICE. LATERAL SEE e 8 -- T`(PICAL FILL SLOPE - TOE NOi BEYOND FLOWING 8 - STRLAM$ANK EXCEPT VJHERE AUTHORIZED N SFRI►�IC3HEA. St EPAGL CONTROL -SEE DE1A11_ I(D 9 IV C.M.P. CULVERT SEEPAGE CONTROL DITCH WITH SUBDRAI — -- _ --�— � OU T LE'T - SEE D E T I►1 L 5 A CAT Y - COUNTY 6OUNDA. RY < < 1Wc_,'TRCAtvl ROCKING � GRAVELING SEE DL7NIL Z GENERAL NOTES 1. An 8 foot wide permanent access road with bridge structures is to be constructed from the pump station to a turnaround at Station 68+40±. Interceptor sewer pipe is to be located within the access roadbed except at locations where stream crossings are required. Upstream from Station 68+40 the pipe is to be aligned in the existing stream bed. 2. In addition to Standard Washington State Department of Ecology requirements for construction, design criteria is governed by State Department of Fisheries permit requirements. The 1984 permit (for which a supplement must be issued by the Fisheries Department, prior to start of construction) is bound with these documents. 3. The design edge of the permanent access road scour protection rock shall not be constructed beyond the edge of the flowing stream bank except at specific stream crossing locations designated. 4. Any variance to design location must be approved by the owner in cooperation with the Washington State Department of Fisheries. 5. Typical roadway excavated uphill slopes shall not be constructed steeper than 1:1. Where steeper excavated slopes are required, gabion basket stacking may be used when authorized. Gabion baskets are to be laid on the slope or stacked in specific locations when authorized. 6. Procedures for "healing" existing slough scarps and protecting newly excavated slopes have been reviewed with geotechnical engineers who will be retained by the owner's engineer to provide technical advice during construction. 7. The contractor will be required to "pioneer" a roadway along the desired alinement for purposes of evaluating slopes and selecting specific methods of slope erosion slabilization. 8. Seepage within slopes to be excavated and in existing slough scarps is to be relieved and surface stabilized by one of several means detailed in these documents. 9. Slope erosion protection measures other than jutemat are bid by the unit to permit selection of the most suitable method for given locations. 10. All excavated slopes are to be jute matted and planted by hydroseeding. w_w,o_-17 -143pt FERGUSON 8 SONS INC 81518 L 2 - 2 a C^ n I A EXfSTING PUMP I--d% OAIDER PHASE I rXI ST, /2" CULy /E. /fi, / EXIST l00" C L v. 7 To .9'S�ILT, VIA 5. �9 ray°Y J Jam• �. �� t Pfl � E. 1_p IS �031 1� v Ili a I� llG J2 C_MPr, CULv. ' �,EFER 'r0 pNgSE I � CONST�UC.TIU�! R1ECOa,� o� 1)P,AWINc-�15 FUR PUMP STATI a 1v LAYOUT 4 CREEK SPILLiAA,-( CITY 1-111175 PENL7IN /'�N[V EXAT"I.��N AZ f 0 .�3 ROAD F?) L1/ ET Hi ' L E N 1_� ---- 121, C r1 P CU LV. �` r a E I,J DE TA SHI,�TA — 7UMCE{�Gt REP SAM °"TRUCKINU CLEAN UL1T :&1 -- 12' CMIP CULL/.