Loading...
HomeMy WebLinkAboutWWP2701432.94' - O" MIw 51DE SEWER PIPE �'►4 BAP,5 -� 1. +a COWC. WI►JG WALL —� Z—2." P,V.C, DRAIN PIPE ON UPHILL SIDE WITH 5 CU.FT. PL" DRAIN ROCK. KEY (. MIN. DAYLIGHT DRAIN A MINIMUM OF INTO UfJ015TUbE0 10' O" FROM TRENCH, SOIL (iTYP. OF SIDES T BOTTOM) PIPE ANCHORAGE & BLOCKING N.T.S. NOTE PIPE ANCHORS t BLOCKING SI4&LL gE INSTALLED ON 40' CENTERS FOR ALL SERVICES. INCIDE.►JTAL WORK INCLUDED IN PER LINEAR FOOT OF SERVILE. FILL SPRINGMEAD WITI.1 ROCK CONFORMING TO SCREtNE.O ORAVEL SUR►ACING SANDBAGS 4 6RAVE.L FILL INCIDENT%.L WORI(,INCWDE IN SVRwG H.AD DIOITBM \\ . ( 4.(MIN.) WASHED DEA GRAVEL ALL I � AROUND PIPE 4" NON PERF, PIPE---\ i I'-O' MIN. COVER PERF. (OLOTTED) PIPE WITH CAP 4" PIPE MINIMUM 5' PROSeCT 10 ►.I TO CRECK DID ITEM INTO SPRING BED 50LID PIPC IIJ CRUSHED ROCK BEDDING SPRING HEAD SEEPAGE CONTROL 16 N.T. S. 9 BID ITEMS ARE: o SPRING HEAD PER UNIT (INCLUDING ALL BACKFILL) o SUBDRAIN PIPE PERFORATED OR SOLID INCLUDING BEDDING OR PEA GRAVEL PER LINEAL FOOT wwp-?7-Igo' 2 W►RiABLE NOTE : IWCIDE_k4TAL WORK INCLUDED IN OTHER D.In ITC AAC S' Tc F- SLOPE ROCKING TO PREVENT EROSION .IG URISED PROVIPE HILL HOLDER45 ON ALL SIDEHILL TRENCH RESTORATION AREAS. HILL HOLDER DETAILS 12 NO SCALE. - LI WE FEE T 30" HORIZONTAL DPOV E WELL POINTS > EXTENSION DRAIN PIPE HORIZONTAL DRIVE WELL POINT m.-r. S. THE DRIVE WELL POINTS SHALL CONFORM TO THE FOLLOWING SPECIFICATION: DIAMETER: 1 1/4" LENGTH: 3011 OPENING: 60 GAUZE (0.010") ACCESSORIES: DRIVE CAP, DRIVE COUPLINGS MATERIALS: STAINLESS STEEL/CARBON STEEL SPACING: 5' TO 10' ON CENTER AND 1 TO 2 ROWS, DEPENDING ON EXTENT AND VOLUME OF SEEPAGE INSTALLATION: DRIVEN NEAR HORIZONTALLY, WITH SLOPE FOR DRAINAGE, USING 90 LB. JACK HAMMER NOTE:THE DRAINAGE DETAIL NOTED ABOVE IS TO BE USED AS A GENERAL GUIDE IN RELIEVING WATER SEEPAGE AND IMPROVING ROAD BANK STABILITY. BID ITEMS o 30" WELL POINT DRIVEN TO PROPER DEPTH PER UNIT o EXTENSION DRAIN PIPE INCLUDING COUPLINGS PER LINEAL FOOT SEvERAL hIELL hoiIJT5 WERE INSTALL1=v 5UBSEQUENIT LY DETEIRMINED TC) No-r i?E NECESSARY. . 1 �/4k, 47 6 � ' . S GABIOI.! FILLER ROCK SIEVE SILC % PASS W & /3 8 100 • •• • �• OTES END THE LACIUC• WIRE ITN AT LEAST 'S TIGHT TuaIJS G.P.OU►J0 SELVAGE WIRE / .l DOUBLE LOOP r 51►JC, LL LOOP y: �'�Q L AC NG DE.`TAIL io-XTE : ALL LACItJG TO �U�~ OE 13 GA . W IKE Q 4u I i 4151) OPTIONAL5TACKINcQ- MtTHOD FOR Q STEEPER '1 OR YP� /i lOR % 04,E SEE SECTION h\Vti FOR F I L.T E R c '9 SUBORAI/J- SEE DETAIL NO.15 5E CT 10 f 45 GABION DETAILS 13 . S. 9 NOTE ' ALL GABIONS STACKED u�t�t rtl Tm r� —�ri_-i-ti_S_�_stisi ja�sizZ_tai—__rs_r �stsi�sa-la stra•�J fAbl.rb Li «...1,.. ,. TYF✓CAC AC _J!, -- • M - -- III TVXWAL CA"A7VV _ Jt.,Ir01 oco IM J./h s)ro-cM � 65nPiMf 56 CHECK DAM TYPICAL PROFILE NO SCALE PL��I�FALL LOPING SWALE rROM SUNSET 6LVQ CKLEK HYDROXEED SURFACE. SEED N ACCORDANCE 1J/ SECTION 47- 7_0Z. OFILE OFSWALE ABOVEP SOIL LAYER TAKEN FROM OF SEWER MAIN. kil SELECT NATIVE ] MATERIAL i ' " RETRENC►{ AS REQ'D. FOR DESIRED CL.IRYILINEAR 1 ALIGNMENT TYPE ND" BEDDING I , WCORRUGATE0 ALUMINUM / PIPE IV GAUC+E. LAY PIPE IN / Ralyom Of GULL.EY, (tSITNE SLOPE MUST BE MAINT/IINED. CONI.IECT TO EX15T11JG PIPE NEAR SUNSET VARIES A-5 REQ'D. 18' CULVERT IN GULLEY ,4 FOR POSITIVE — Np SCAL9 SLOP E. E AT 5TA. (.7•00 -- LUMP SUM BID. JOINTING: COUPLING BANDS SHALL MEET REQUIREMENTS OF AASHo M l4l0 : M 197. JOINTS SHALL BE GASKETED AND BANDS SHALL CONFORM TO API.JA STANDARD' PLAN NO. 6:.26 DECLEC-rlo 15 OF PIPE AT BAND JOINTS SHALL NOT EI«EED'/2 TJE MAXI NUM SYTHE PIPE-eJOINT tAA"LIF. LUMP SUM DID ITEM CONSTRUCT AI\ICNOR BLOCK KEYED INTO NATI\/F- HARDPAN AT END OF LINE . UsE Z 1OIRIvE PIPE ANCI-}OR,S CONNECTED TO F-ACN COUPLINCt. - ��-- = •"^-� • PLANS FOR. KOAO BRIDGE CONSTRUCTION i'�14 EDIT101•t. TURAL DETAIL'S ,A. RECORD CONSTRUCTION DRAWIN-G HAMMOND, COLLIER & WADE- LIVINGSTONE ASSOCIATES, INC. �.•� �'., CONSULTING ENGINEERS j ►'� MA0_[� 4010 STONE WAY N SEATTLE WASH NGTON 00,03 fMlN�ltl ltli.11tl (206) 632-2664 arw+wu av wcraea M N YL x- r n J•' Ji r• All- Z_ -� — - .r .i w•. w ✓ rw16, ,..w SLOPL= KOC.KINGOK GA131Ot1S ON CL"A" SCREENED GRAVEL RASE COURSE ABOVE NOT SHOW►-1 ACCESS RD. �--� SEE 0ETAIL 1 / / / Tff:�l (f" %A%V.1. WA5PE0 PEA CARAVEL ALL AROUW0 PIPE A•D.S. QERF. PIPE ZO GREc►C SEEPAGE CONTROL DITCH ROCK CONFORMING TO SPECIFICATIO o FOP\ STREp.MgED SCOUFli PROTECTIO►.1 ROOF), "-Oa 0 SLOPE ROCKING 15B W.T. S. 9 $ ��_��Qll 5 NOTE: SCREENED GRAVEL SURFACING WILL BE. CON51 DLR ED INCIDENTAL AND INCLUDED IN THE UNIT PRICE PER CUBIC YARD OF SLOPE ROCKING, 10 CUBIC YARD5 OF SCOUR PROTECTION FLOCK FOR P�AMP' EMBANKME1,4T \ oo 4i HO►.IEY CREEK PROVIDE GABION BASKET TKAWSITION FROM ROAD TO PIFELINE °Boa. = - BRIDGE ABUTMENTS GEOMETRIC PLAN BANK .vv . IN. vL_J IV ry 1 r.vr ILC, TRA,N51 TI0NS SECTI o N BRIDGE GEOMETRIC DETAILS 22' L = BASIC UNIT LENGTH =-35'. SEE DETAIL 18 FOR STRUCTURAL PLANS OF BRIDGES. BRIDGE STRUCTURE (BASIC UNIT 35' LONG) BID ITEM INCLUDES 20 CUBIC YARDS OF ROCK RAMP EMBANKMENT. EXTRA BRIDGE LENGTH AND GABIONS ARE SEPARATE BID ITEMS. RICK G W*S&l CITY OF RENTON DEPARTMENT OF PUBLIC WORKS "f ST � �'� HONEY CREEK -PHASE 2 Dir C�STER SS) '�` DETAILS OMAI E�` I p(�wCn MODIFIED To 1'2,1_rL& �'IA1 FK, 3-20-8(0 DESIGNED F, G.K. DATE 4 - 85 FILE NO Z650 I1��Ci_J��JN OF CONsT DRAWN M• K, hX_5'I 57 0�3�ER',iATION RECORt7�; CHECKED FG SCALE tiOTED FI[LD wool(_ i..IAGK— NO. REVISION BY APPR. DATE ArPROVED SHEET 9 OF 10 DIRECTOR O/ PU•LIC WORKS