Loading...
HomeMy WebLinkAboutWWP2701453.45 P 4"0 F'VC FM - p: '.p a 3662" '? I 8"0 PVC 4. ' .• a� y 6, 359•00 _._ p I 1 •a o_ o. .0 . . �. �S S See Sheet ` \: /4 � 0 ?2"0 SEWER MANHOLE 359.0o HL- ON ALARM ON IF NO PUMP ON 358.50 LL ON 357.25 LL OFF -- -- 356.75 UL OFF € ALARM ON IF NO PUMP OFF LEFT SiTf-T10 New Side Sewers Date ' To Be Laid In 4dr84! % (a 109 Common Trenches - 5ia GZt80 " "%� 4 ?' sta 114— 24 Separation Wherever b ._,2 S „ zo'Zr Possible (Typical) piSee cal) _ hee„4 i6 -' %�-- 108 97 b \ / I. SANITAF.Y SEWER PUMP STATION SHALL BE SMITH LOVELESS WET WELL MOUNTED LIFT STATION WITH 47 DUFLEX SEWAGE PUMPS. 2. PUMPS SHALL BE SMITH LOVELESS 10 HP 4132B SEWAGE PUMPS, 1760 RPM WITH 10 1/8" S4122 48 -MPELLER OR APPROVED EQUAL. 3. AUXILIARY POWER CONNECTION REQUIRED ON LIFT STATION. TYPE OF HOOKUP SHALL MATCH CITY OF RENTON EMERGENCY GENERATOR CONNECTION. New Side Sewers To Be Laid I In \ Common Trenches - 24" Separation Wherever Possible (Typical) ADDED 6" PVC SIDE SEWERS Station Length (Lt./Rt.) 12+85 28' Rt. 13+20 15' Lt. 13+45 35Rt. 1 3+ 95 25' Lt. 14+30 25' Lt. 14+90 14' Lt. 14+95 40' Rt. 15+25 14' Lt. 15,50 40' Rt. 16-05 15' Lt. 16+30 35' Rt. 16+45 17' Lt. 16-70 32' Rt. 17,35 32' Rt. 17+55 15' Lt. 18-55 22' Rt. 19+20 22' Rt. 1 9- 25 28' Lt. 1 9+ 55 30' Lt. 19+60 20' Rt. 20435 32' Lt. 20,40 15' Rt. MH 015 42' Lt. v These Plans Were Revised By 1A/A\L L O C4 T /® N 7F Barghausen Consulting Engineers, Inc., r�2/ vEG1iq Y S In August Of 1984 To Reflect The t�ETE.PMr.1l Goa' �Y C3G/ � . Addition Of Side Sewers And Water,, � �w✓ ��'; 3