Loading...
HomeMy WebLinkAboutTED4001507.30� Bridge � v a 0 0 U 0 0, S)% Q3 `4 I SD I -f 9 53 , ( See Sheet 28 ) 7518" Qj U b (Povemenr Seot) l' Co"Dio. 3lackout 'C For Future Utilities, 0 (Lt 2 ' O "Dio. Hole For Wa%r Line - L fined w/ Poper Bond W Typ. (See Note A) A Breaker and Filled o iv/ Concrete V"/tiro. 0 = QX- — Thickness (Typ") #� % (Typ) 10- V)' of '*4 I I ( Typ.) N� I 2, sp/, ce i I 1,, - -- 13 #4 i4�@ / 0" _ /2, 0" 13,/e,r ---- ae 2 3 Sp o_ @ l ' O " 13 -O - - _ _ - - - ►�.. 2_-' 0' 35 j ?6 5 2 , 8 PIER I ELEVATION Looking Aheod on Stotioning and Normol to <Z Pier Slob ReinF notshotun For clor-l'ty Dr'rnenslans shown are measured of bock oFpovementseot Note A: lnstoll synthertc closed cell sponge rubber in opening between woTer l/ne and open/ng in diophrogm . Cement - Sponge rubber- to concrete -surface. � Bridge - 1 In'- ao" cc l- (o Dio. B/ockout For (Pcvement Sect) Future Utilities. Lined l' c" iv/ Paper Bond Sreokerl Q) on d Filled w/ Concrete l' 9"Hole For Wcj erLlne -- G"Min.Thickness(Typ.) rB *,,It, Typ CSee Note A ) 8 / 55 / / 8 ((5D Ltj I --- C @l'O"-l2'O"Each Side 3" "':4 I52 l7 2 EochSide (Spoced Ivith 9 53- ) DRAWN S.T Vu— B- 8-5 CHf'KED PROJ. ENGR. DIST. ADM.. — /J'O DATE DOT FORM 221-011 Revised 9/82 PIER 3 HALF ELEVATION Looking Bock on Stotioning and Normal t'o q Pier. Slob ReInF nor` ShoWn For Clarity. Detolls symmetri col obout q Brldge RENO.GIONTOTAL " STATE T FED. AID PROD. NO. SNOS EETS 10 WASH BRM-1157 (1) JOB NUMBER 86 W 002 CONTRACT NO. REVISION BY APP'D 2" Approach Slob w/ ,ka"Aspholt Overlay `4 148 (See Detail o) � \ 0 Pie r / „ I , „ 2-4 /-O =3'-O" Top Slab ReinF (See Sheet 3/ -*4 /44 \N -- I i , z or (14T ---------��� a Ln - 19v m � � I l"x Co "Pre mo/ded Joint Filler (Full ID l�4/2 I I 1 II l" Expanded Polystyrene 1 /0" lo" over entire area berween diophrogr-n and pier Iva Fu ture �t ► arer- Line liS e Aphol t #S Transv. @ /'O" N o✓erloy 77 '*S Long/1-. @ /O" IF u ! \ 1 4" C" G 4��III '�#8 Longl't @ lO" (Full Length, 'I Stroight Iv/ Std. Hook of Pavement Seat) DETAIL D Top bars sholl be epoxy - co oted ¢Pler3 Top Slob ReOF (See Sheet 3/ ) I / mil\I fA s-: - - - -� - - - - - 0V N See Detol l D i x'`5(lSI (Sp/iceC/ r✓/ L / 9"Dio. Hole ,Bolcom Slob Bors #S For Nester Ll'ne I 2 Spa. 7" C) G„ HIGHWAY DIVISION Feb. 2811986 APPROVED SECTION C `�-j SECTION A I Pier 3 I �O„ /O„ /O„ 3 Spa. 5" 4 l45 - Bolfom Slob RelnF (See Sheet 30 ) 45 /4.3 CM8„ 2, O„ # 152 Slob Re inF. (See Sheets 30 � 3/) s i I #8 /53 #q 53 CSee I x OntinUOUS' Sheet 28 ) i /o"I /011l Sheor Key I 2 4 4r4 Washington State TrAf Department of Transportation -ENT. R-ANCO ENGINEERS, INC. BELLEVUE, WA EVERET , WA `\N \'-- Approach Slob I✓/ lie"Asphalt Overlay I l" Thick Pre rnolded Joint Filer (-Full Length) / ,/ 7„ C SECTION B R IIIIIIII& **4!1ro7 BRIDGE SHEET CITY OF RENTON 10 WELLS AVE. BRIDGE REPLACEMENT SHEET 33 OF 6RIDGE 35 SHEETS C-U-IS6736 ';CANNED OCT 2 7 Z006 17 7