Loading...
HomeMy WebLinkAboutTED4001507.31m v v(k G ~� a .v o m c W1 See Section D r Sheet 26 �&< C \ L Q� (\PJ i 0 .I \� °bove I a�.m ,Valk er-- I 0 Side of SLJPd i�/ I \\c ,n s e 1114 "Joiaid Ed T�p)fi Fille kF°r i betiveeo°°h Slab-, End r_Tor�d J°�side`�a I %211Join and APPrion A-F-) Sprn" fir, of I / E30 (See Std. P pep -ry p F� 0 II to P°nel J I 8+3 n� I Lm N I \ 19 Railing Type A Pones COro'-O" d __- o n------- , G ,/ con___Borrier _Joints n Sidewalk - - p L! mroY V gnd9e °nd RoodWay n9 �Type A Pones ca Co'-O„ 2 O Ro 1 ------ ---- \ N rr�er and walk Conk ----pints in S1de __.. 1Ljrnr + CSJ 7 nel PT. 9f 4/. 08 ,pe e� B SIDEWALK, BARRIER, AND RAILING TYPE A LAYOUT nd Rd For Roiling type (3 and C Loyout, See Shee7` 23 o Borrier Panel--- - ---Poured Rubber S'deivolk i doint Filler CURB HEIGHT TRANSITION -l'/x 3i "xl'3" l �" LOCATION 9" CURB To CD" CURB S.I✓ Corner 8 +5Co.64 (Lt) 8 +5D. 88 (Lt..) N. W Corner 9+ 6 /, g o (Lr) q f G 7. SCD (L7 ) lv.E. Corner 9 +CD7 3l (Pt) 9+ 73. 57 CPt. S.E. Corner 8+44 99 (Rt) 8+38 7.3 CRr) Barrier Pone/ f Railing Type B I I ODI I N II�9 I I � I i I I I i I I I 10 I I I ----See Section at- Borrier on l�o Sheet 2/ m / n� o ! II II - Bottler Panel and d Roi ling I - 7-yp e a Top of Conc. Sorrier - Top o F Sidewalk --� Ped. Roil and Bo/usler IN BARRIER PANEL4-4"ChomFer 45 2 O D Sti`d. Pipe CTyp.) 4 „ \ Ped. Rai l Q) -- - - -- o I � � ' /� /Post W6x15" (Mod/Fied> - - or E i o/ent -� Q) I I 9 u C � v lL -Roi ling Type ,4 o - l9 O rSee Detoi/s tfits Sheets - -- - 11�/41/ �4"A 325 BcltIf ` C �! 3/4 ChomFer -�I Doweled %''Min. /g/S core 0 # I- T ) U t into Sorrier 4 Droq#@I-O CTyp.) Sta. 8+S1 ro 9f67 (Lefty 1 C yP D) Pone l (For Bolus Ter--__ @) / , I -- - - - L Roi ling Type A 4 l70 @ l-O Sto. 8+39 to 9f 73 <Rightj T QJ • -� End Post TraFFIc - �8/ "A .325 � Z � �,\� n\ Connection) Rails ­� Anchor Bolt QJ -�- • • . z yp) - -- - - 4 "Di a PVC Top of i � Q) , 7-yp (End Conduit_ N !� - --- - Slob-16-000 Pos+C:�iy)- 11 �-- j X �O X /2n CIbOSCS SIX 10214u Top Slob Closs B Steel Conc. -- \ sr ! — ---- i - 4 �ll05; (S. Iv Corners t O 1 --ve) � CLeFt) 4 (166(N I✓ Corner) O CD(IrzI)CRi ht) 4 9/07,�N.ECorner> Ind,cotes number and leo l-h of bars � I @ I / O / --- - �8 � S. E. Corner) . _ Closs AX 4 y I a9t �` , �, , � __ _ y �� lCo2) cS. I(-! e h/. Ili. ., tc be determined by the Contractor I 4;�041C�/-o (Typ.) _ 2� Conc @ l- O Ciyp.) -� �_ Corners) From the plans C 2'-O"Min. Sp/ice) I \� (�t 314" HolF Round Drip Groove 4 Premolded Joint Filler. Use Cement Style Lubricont t-o lnstoll Roiling Type R (See Sheer 23 ) SECTION AT OPEN JOINT ICI; SECTION THRU SIDEWALK AND CONCRETE BARRIER DRAWN Cht,'CKED Pf r ll- 8 S PRUJ. ENGR. DIST. ADM.. /f®�' DATE DOT FORM 221-011 Revised 9/82 or lCo3 (N.E. E S.E. _ Corners) „ @ I-o CTYP) ��_ IF3 O� i <� 3/4" H(3IF Round Drip Groove conc. Barrier CTyp. Roill,ng Type A Panel In term. Post CTyp.) q -- --- - - - - - - - - - /O� 5/8S uoreBars@Co"= 4-� O-9� Roil�ngTypeA C Balusters End Panel Poral/el to Grode IJertico/ ¢ Roil and Baluster _O-2� O'- /%4 l Std. Pipe SECTION IUN THRU BARRIER PANEL � B 1 SECTIONS THRU RAILING TYPE A REGION I TOTAL NO STATE FED. AID PROJ. NO. SNOT SHEETS 10 WASH BRM —1157 (1) ff�°o JOB NUMBER 86 W 002"' CONTRACT NO. REVISION BY APP'D 3 //� HIGHWAY DIVISION Feb. 281 1986 APPROVED Ex 4 `�N Channel Squore n.l N W 1 I Top of Barrier Pone/� A l "Dia. Hole C Typ. 2 Holes per End Post - For Connection to Conc. L3or'rier) LInterrn. Post End PosT W6xl5 CModiFied) MC roxi6.9 C/Nlod/F,,ed-) on Equ� vo/ent on Equivalent PLAN 71-oFFi c R01*/5 not shown L L IConc. Borrier Romer Ponel 5'"Min. - Rol hn Type L"Mox.l (See Detol'ls Sheet 23) I I l I I it II -_ I II II I L-U 3 "A 32 /4 5 Bolt -� Doweled CD"Min. into Borrier i — &J 1: Panel (2 per �a A32- �' End PoS�� Anchor- BOIt �(2per E-nd Post_ 14. per Intzerm. Posr) AT F'Nn PA KIP l ELEVATION * Angle varies depending on roil locoti'on lnterm. E Post N. TRF WA;v �- 0, 12/54 y4 37 ---- ----- ——1-4x.�x 5//gyp ,4n - J St turol Tubing Hole 1� SECTIONrC SECTION E — Heod Bolt iN/ Hex Nut and Cut ►✓osher each si de Int"erm. CT r Str t r / T rF yp fo u o ubing Post: Connection to roost) /4 �/---- � i- Cox 3 x%4 i I / Struc turpl Tubing L 3�2x2 px I%� Dio. Hole � 4 -- O O --- rox3x'/� I -�—R G� x�ox/e Structure/ Tubing miLl' Dio Hole M' C Typ. 4 No/e s O per Interm. Post- For Connecrion to b✓ Cox l5 _ \ Conc. t3orrier) I" C Mo d1' Fi e d� " Typ 8o th � FTyp h Ends of Post' /4 --- - SECTION D �■o► Washington State ♦rAf Department of Transportation eoENTRMCO ENGINEERS, INC. BELLEVUE, WA EVERETT, WA SECTION BRIDGE SHEET CITY OF RENTON WELLS AVE. BRIDGE REPLACEMENT SHEET 34 OF BRIDGE 35 CD -Q-I�Mj �;CANNED 4CT 2 72006 Ca - / k / 17.5%