HomeMy WebLinkAboutTED4001564.1PIZ Ee' l 2 th
En110Ncs A VE.
PL.
Mc KNIGHT IF
HIGH SCHOOL z ='
O
'✓f ,'qth ST.
z UL w I
Lu -r I
N. E. I3 th ST I I
o Z!
I
w PRO JEC T C _ /,I / TS
I
N. E. I2 TH Ar
I
I
a I I
i ' I
I I
I I
I
L ">r ATION MAP
SUPERIOR REPROGRAPHICS
LEGEND
11WPR0 SS -- SANITARY SEWER MANHOLE (EXISTING)
VEA1.'EN
STORM SEWER MANHOLE (EXISTING)
STORM SEWER MANHOLE (PROPOSED)
E. TO KIRKLAND A VE. N. AE. ❑ CB CATCH BASIN (EX/STING)
ENG1NEEF'ff1'1_'l'�"'
P,, _— .°--",
/ V/ �1 V T
t .r'`� HA R,t? C HOUi3H70,11i
PUBLIC
r Z
i 'KS DIRECTOR
■ CB CATCH BASIN (PROPOSED)
❑ W M WATER METER (EXISTING)
D4 GATE VALVE (EXISTING)
;Q FIRE HYDRANT (EXISTING)
W WATER LINE
O L P L IGHT POL E (EXISTING)
O PP POWER POLE (EXISTING)
__ G
X X
TELEPHONE
GAS L INE
FENCE L I NE
7 CONCRETE WALK (EXISTING)
CONCRE TE WA L K (PROPOSED)
ASPHALT WALK (EXISTING)
CURB B GUTTER (EX/STING)
CURB B GUTTER (PROPOSED)
STREET SIGN (EXISTING)
MON.
IN
CASE
(EXISTING)
MON
/N
CASE
(PROPOSED)
'EhJ'A l'JC ?'E
I ALL CONSTRUCTION SHALL BE DONE /N ACCORDANCE WITH A.P W. A. PLANS AND
SPECIFICATIONS, 1981 EDITION
2. ALL UNPERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. IT SHALL BE THE
CONTRACTORS RESPONS/B/L I T Y TO CONTACT UTILITY COMPANIES TO DETERMINE EXACT
LOCATIONS.
3. ALL POWER AND TELEPHONE POLES AND APPURTENANCES SHALL BE RELOCATED OR
REMOVED BY OTHERS. POLES a OVERHEAD SYSTEMS CANNOT BE REMOVED UNTIL THE
UNDERGROUND SYSTEM IS ACTIV/ TED.
C ?rl TRlljCr1C),41 IVCTES
REMOVE EXIST CONC. WALK INSTALL STD. WHEELCHAIR RAMP
E
i
0 RELOCATE EXIST. WATER METER BOX O9 SAWCUT & REMOVE EXIST SIDEWALH 8r CURB.
INSTALL STD. WHEELCHAIR RAMP.
r
i
\=/ RELOCATE EXIST. FIRE HYDRANT ASSEMBLY /O REMOVE EXIST TYPE C CURBING
OEXIST. POWER POLE TO BE RELOCATED ADJUST EXIST. VALVE 8 BOX TO GRADE
BY OTHERS
OREMOVE EXIST FENCE
/ 2 INSTALL STD. MONUMENT, CASE 8 COVER
OADJUST EXIST. WATER METER BOX TO GRADE
OADJUST EXIST. MANHOLE TO GRADE
I
DEPARTMENT PUBLIC # P K S
A /2 TH ST /MPROV/EMENTS
Ilk
EG`MUIVL!S AVE. NE. TO KIRKL AND AVE NE
FILL
DRAWN __-- .--
.__........._,_._..-__,....-_.___.__. ...._ s _.-_._..._ _._..— - SCALE A_ SHOWN FIELD BOO`c512 PAGE_
CHECKED
NO. REVISION BY APPR. LAiI APPROVED SHEE OF_
G DIRECTOR 01 PUBLIC WORKS
rm
",CANNED OCT 2 7 ZM 400 02 amp/