Loading...
HomeMy WebLinkAboutTED4001746.1LoloDo 307 r'-::,] / "= 400 SHEET l v O. COVER S TREE T 8 STORK' SEWER SANITARY SEWER WA TER IL L UMINAT/ON t-ENGINEERING WARREN C. GONNA SON , PUBLIC WORKS OIRECTOR NT� GENERAL NOTES 1. ALL WORK SHALL BE DONE INACCORDANCE WITH A.P.W.A. PLANS AND SPECIFICATIONS. 2, TEE AND SIDE SEWER LOCATIONS AS SHOWN ON THE CONTRACT DRAWINGS ARE SCHEMATIC ONLY IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTACT THE PROPERTY OWNERS TO DETERMINE THE PROPER LOCATIONS TO INSTALL TEE AND SIDE SEWER TO SERVE THE PROPERTY. J, ALL TEES AND SIDE SEWERS SHALL BE THE SAME MATERIAL 4. ALL SIDE SEWERS SHALL BE INSTALLED TO THE PROPERTY LINE AT 2.0 / MINIMUM SLOPE UNLESS OTHERWISE NOTED ON THE PLANS. EXIST/NCB PROPOSED SANITARY MANHOLE O SANITARY MANHOLE 2-3 —S—S— SANITARY SEWER SANITARY SEWER 4-5 W WATER LINE WATER LINE 6-7 —"� WATER VALVE MANHOLE��'� WATER VALVE MANHOLE 8 FIRE HYDRANT FIRE HYDRANT --SD — SD STORM DRAIN! STORM DRAIN ■ CATCH BASIN (7 CATCH BASIN •?P •if POWER POLE, TELEPHONE STUB LOCATION T T — U. G. TELEPHONE --E E= U. G. ELECTRICAL G G— GAS -- — PIPE CULVERT —x — — — FENCE f «,. DEPARTMENT OF ENGINEERING COVER SHEET I _ c�653GNE®v ' L?ATE___—._ __— !iS"?LE 3VO.—--_—. _g DRAi14 N__� ____ �AS 11/OT� - FIELD 800r SCAL, _a ._.PAGE__ CFaECK�D» APf rd. NO. REVISIONE3 ;` �j DATE APPROVED ai IEF7_ �__ OF� v ..�...,..,.�...,- ...... DIRECTOR OE7 ENGINEERING DIETERICH POST I000H - DPOC>II®D