Loading...
HomeMy WebLinkAboutTED4001755.15LLJ CW5 he Lc�c�tlUN PLAN ioo z II I Uvr-R�Lnw 71�46rT, II I YN I IcvI�NDAj1U� i �" cp GvNG. SYM I REVISION 71 0 —(c e- 6>4.r New/ `7jc�P�M I�RAI N -- — — — �AIyr 'jp.N , SGwLFiIlt — - - - — G)� 14r. fxI F`L "t,'6r, C' k P�A51 N �— r-,K 15 r, M Ao4 H 0 J.F -Q 1 �7T. I F�� f•I �,( r,2 I;� A N7 06 . 1U�80 4" 4) 171, Cw IiP, r- ow Mal N i of�l'�RItW A • J \Y I� A9p41 fSAMP 2-v OI 4-5L--L, 1N1'G, T PLAN G v r►c. , � I �V�lb•l.►� 4, dP 17 t. PI hE Co" LoN� PI Pro GULAG, GyP)►3 4:4 17L U*IEP�FLUW r.?NSf;IT. (Z,�L'�i,, '"-*)44 ,• ,Js rl P� Ex14T, IU"q� PIP�(/ar�P,UX. STOPiM (GvNG) eE ION A BY APPROVED DATE TSYM REVISION 8" F"S BY I APPROVED I DATE BOEZW" FACILITIES DEPARTMENT 45� GL. Gv NG C. P,C Fla.. I ►� v� Q L) "570PNM (,DUNG Z- 4" 4) 0 I, S-L+3vw S (4to) F.�. ir-1 WADI, A5 P,%r1cQ'0. *4 hA.w c.N T VAN Pk &S G��a'I�D Rai-I`1 PEASE �A►J ►'i � u N Gr�i h•V t% �. rl V4 Sic»,M DMA -A Opt Tr�LNcH i��TA�L NT5 SPECIFICATIONS 1. GENERAL 1.1 The contractor shall provide all labor, equipment and material to complete.the work shown on this plan. 1.2 All grades shown on the plan are approximate and shall be adjusted in the field to suit the conditions. 1.3 All reference to the APWA means Standard Specifications for Municipal Public Works Construction by the Washington State Chapter of the American Public Works Association, latest edition. 2. E,XCAVATION 2.1 All existing pavement shall be saw cut prior to removal. 2.2 All excavated material shall be removed from Boeing Property and disposed of legally. Prior to removal, the excavated material shall be inspected by the Boeing Environmental Department. 2.3 All existing utility locations shown on the plan are approximate. The contractor shall use extreme caution during excavation to avoid damage to existing lines. 3. EARTHWORK 3.1 Trench backfill shall be installed to the dimensions shown on the Trench Detail and placed and compacted in accordance with the APWA. 3.2 Bank Run Gravel shall conform to the applicable sections of the APWA, with no pieces larger than 4 inches in. 3.3 Crushed Rock Base shall conform to the applicable sections of the APWA listed as Crushed Surfacing. 3.4 Gravel or Sand Pipe Bedding shall conform to the applicable sections of the APWA. 4. PAVEMENT 4.1 All pavements shall be installed in accordance with the APWA. 4.1 Cement -Concrete shall be Hi -early with f'c=3000psi @ 3 days. After installation, the new concrete shall be sealed, covered with plastic and allowed to cure for 3 days. 5. DRAINAGE 5.1 All drainage pipe shall be installed in accordance with the applicable sections of the APWA. Grades and slopeE; shall be adjusted as necessary to suit the exact location of other utilities. 5.2 All concrete pipe and fittings shall be rubber gasketed and conform to the applicable sections of the APWA. 5.3 All ductile iron (DI) pipe and fittings shall be rubber gasketed and conform to the applicable sections of the APWA. 5.3 All pipe bends shall be 45 degrees. 6. MISCELLANEOUS 6.1 All steel reinforcing bar shall be ASTM Grade 60. R-174550f RECOMMENDED S E C I ON ri5 FOR APPROVAL I s b Y �A 4Vf-7 /D ❑ AUBURN, WA. 98002 El EVERETT, WA. 98201 ❑ K E N T, WA. 98031 ❑ PORTLAND, OR. 97220 R N T ■ E ON, WA. 98055 U SEATTL E, WA. 98124 �� �y ACCEPTABILITY THIS THIS DESIGN AND/OR IS APPROVED A CN Q �AL� `1 I SUBTITLE ^ L G� /� �IrN J �/GT I (� C)C- TAI �'45 LAST REVISION SYMBOL DATE CHECKED SHEET 1 — 1 `/ OF APPROVED BY DEPT DATE ENGR TITLE `/ram 1 i� � N 5 ,�- 131.r�U , I U - 80 I�IURTM LN 1� CHECKED roe r, _ UOU AP�L(Z)w �. APPROVED NO DwGI I U • o Sv• 1150) td oo C C CD 17 o b � r �n �0 "X N ii N 6000 4075 GtE V 7/83 SCANNLD