Loading...
HomeMy WebLinkAboutWTR2701764.1San. M. H . wrn = ►?).50 513 0+25-51L Ste, 0+00-15' Lt �xi5t Fire Hydrant sta 8+55 1� Nor+h i�_xie)r. Fire Hydrant gale: PZ20I 5-ra l 3+12 /' A p I n,,-�,ta i l Water main me r ,5torrn drain line,, �' u-r i I i ty Eas,,,oment 7� A 12/4 ' I and meter a�embl , NOi-� Verify pirL main der-; inc,ludee) F, 0.6. and w►+h interior ��re 5y�tem gate valve with indi(,ator -for 6ornplete- 5yytem post. conformance wi+h rAde 5+a0+39-5'Lt requlrement5 prior to m5tallation �_pbt- IV water /�5 -BU/L7 C�i2T/F/CAT/ON I UL-PEI3Y LE27-1FY TN/�T T.UC �95-�L//LT LGY,9T/ON5 S,yDI�/�t/ 0,// 7AZ--'SE- PL/;.V 5 F7RF T TO T//E BEST OF N>Y• K�t/Olf/LC,OGE AND /N/=O,PMI�T/D�t/, AV " SZOt � �\ 5ta 1 + 50 dire hydrant ine,ludinq 8"x2fze (MJXmj) +hru�t block- � guard posts Note= huloh& utility P-acgement rnu5t be, Provided to the City of f enton -6r metewr vaultand Fire hydrant line, prior to final w6ptanu. of I n1prove m c n t) PRECAST CONCRETE VAULT 2 - 3'a3' MINCED STEEL PLATE COVER. OUTSIDE DINEN5104S A'-B- x 7'-0" EQUAL TO RENTON CONCRETE PRODUCTS, INC. t577-LA 'A b A WATER MAIN1g SOLID SLEEVE, M.J.,,,� TEE, M.J. x FL. . l4 > DUCT[LC IRON PIPE GATE VALVE, FL.. OR TAPPING CAST IRON _.----�—_-� TE.E WITH TAFFING CATS S0. MAXI TYPICAL VALVE, FL. x "- DETECTOR CHECK WITH 1" METER EQUAL TO MERSEY- SPARKLING METER CO. B"x1" MERSEY MODEL D.C. DETECTOR CHECK ASSEMBLY. (DETECTOR CHECK WITH I" BYPASS. BYPASS RAVING 1" GATE VALVE, I" METER AND 1" CHECK VALVE W1TM ALL BRASS PIPING AHD FITTING AS REOUIREDi CATE VALVE WITH INDICATOR POST 8" FLANCED COUPLING ADAPTER, EQGL 70 ROCKYELL INTERNATIONAL 912-09050B-000 DIAMETER OF OPENINC SHALL BE 4" LARGER THAN THE OUTSIDE DIAMETER OF THE PIPE -COMPACTED POLYETMELENE SEE NOTE 5 i / CONCRETE SUPPORT PAD SEE NOTE 4 ELEVATION B" DETECTOR CHECK VALVE �Ir6 p,�tec for G+ and Meter R%Cmady Detal I DUCTILE IAON PIPE FLANGE x PLAIN END PLAN B" a 3/4" DETECTOR CHECK NOTE 1. LOCATE VAULT IN PLANTING AREA NOT IN PAVING. 2. INSTALL GATE VALVE IN WATER LINE. SUPPLYING DETECTOR CHECK IN SUCH A MANNER THAT IN CLOSINC THE VALVE NO THRUST WILL EXTEND THROUGH VAL'L.T PIPINC. THEVALVE MUST NOT BE MORE THAN SO- AWAY FRO!, VAULT 3. PIPE TO BE DUCTILE IRON CLASS 5), CEMENT LINED. 4. TEMPORARY SUPPORT SHALL BE PRO- VIDED UNDER VALVES AT THE TIME OF INSTALLATIONTO CENTER THE PIPE IN VAULT OPENING, AFTER COMPLETE INSTALLATION, REMOVE THE TEMPORARY SUPPORT AND INSTALL CONCRETE SUPPORT PADS. 5. CUT 3-THICK x 5"WI DE ETMAFOAM 22O OR EQUAL TO A ..ENCTH NECES- SARY TO FIT THE S12E OF PIPE INSTALLED AND COMPRESS INTO PLACE THE CONTRACTOR SHALL MAKE SURE THE FOAM IS COMPACTED TICHTLY BETWEEN PIPE AND VAULT WALL WITH NO VOIDS. LIGHTLY GROUT INTERIOR AROUND PIPE. GENERAL NOTES 1. All work materials shall be in conformance with the standards and specifica- tions of the City of Renton Utility Department and the latest edition of the APWA Standards and Specifications. 2. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 3. All water main pipe to be cement lined ductile iron pipe conforming to ANSI Spec's A-21-51-1976 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to ANSI A-21-4-74 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. 4. All fittings to be cast iron, cement lined, Class 250, unless otherwise specified on drawing conforming to ANSI Spec. A-21-10-1977, ANSI A-21-11-1977 or latest revision. All fitting joints to be mechanical joint or flanged. Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be 125 lb. configuration, unless otherwise specified on drawing. 5. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All water main 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. 6. All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washington State Health Department. All pressure testing shall be done in the presence of a repre- sentative of the City of Renton. 7. A preconstruction conference and twenty-four hour notice will be required prior to starting new construction. 8. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 9. Installation of corporate stops, water services, lines and meters to be accomplished by the City of Renton. 10. All connection to existing mains to be accomplished by the City of Renton. All necessary excavation and materials to be supplied by the contractor and be on -site prior to City notification. 11. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify the Utility Department 24 hours in advance of backfilling all construction. 12. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. 2kz2k*& FIRE DEPARTMENT CONNE-1- Itt___!-{ SWING CHECK VALVE A5-WIL7' 7//:5/M February 1980 30,� j41 3 - -4�5- I 0Aa_ 3-8-815 IA/*= / 7(a Approved = 3-/r-FS r biic, Works nireot hate NORTHWEST HANDLING BUILDING Rev 2 85 per 6,1ty Rev I - Srg per G ity RENTON, WASHINGTON SANITARY SEWER & WATER PLAN aE,t WAsof, ��.. U7 i C. DAVID EVAn3 RnD ASSOCIATES, Inc. 301 ASTH PtAnl.1E SE. BELLEVUE. LIAROk"TOn 98004 206-455.3671 101