Loading...
HomeMy WebLinkAboutTRO4101765.10i I I FUTURE P- I 42400, ON LUMINAIRE -3 40+45, 33.5' LUMINAIRE / I � I 1 I I 1 1 1 I I 1 I �� 1 CHANNEL 41+27.99 'f^ � I --40 rt W � I I z Ld Q I I I � I Q LLJ V/ I Y I CONSTRUCTION SCHEDULE WIRING SCHEDULE LEGEND CIRCUIT NO. - - 1. INSTALL CEMENT CONCRETE LIGHT STANDARD FOUNDATIONS AND ALUMINUM DAVIT- QI '-lc 8 12" SCHEDULE 40 PVC CONDUIT Jn- 5 •�-- LUMINAIRE NO. STYLE LIGHT STANDARDS (8' LUMINAIRE ARM LENGTH) AT APPROX. POLE AXIS LOCATIONS SHOWN. INSTALL 35' LIGHT STANDARDS AS SHOWN. USE DETAILS G,H,I ATTACHED TO THE SPECIAL PROVISIONS. A 2-1c #8 12 SCHEDULE 80 PVC CONDUIT 40' LIGHT STANDARD WITH 250 W HPS LUMINAIRE (IES PATTERN M-S-III) 2. INSTALL ONE 240 VOLT HIGH PRESSURE SODIUM LUMINAIRE ON EACH LIGHT STANDARD, INSTALL 150 WATT LUMINAIRES AS SHOWN. 0 --o 40' LIGHT STANDARD WITH 250 W HPS LUMINAIRE (IES PATTERN M-S-III) 3. INSTALL INTERMEDIATE DESIGN JUNCTION BOXES AND CONCRETE PADS AT APPROX. LOCATIONS SHOWN. USE DETAIL SHEETS C,D,F ATTACHED TO THE SPECIAL �� 35' LIGHT STANDARD WITH 250 W HPS LUMINAIRE (IES PATTERN M-S-II) PROVISIONS. 4. INSTALL DESIGN B JUNCTION BOXES AND CONCRETE PADS AT APPROX. LOCATIONS 35' LIGHT STANDARD WITH 150 W HPS LUMINAIRE (IES PATTERN M-S-II) SHOWN. USE DETAIL SHEETS C,D,E ATTACHED TO THE SPECIAL PROVISIONS. 5. INSTALL UNDERGROUND CONDUIT AND WIRING APPROX. 4' BEHIND THE CURB FACE ® ELECTRICAL SERVICE CABINET WHERE SHOWN. USE THE WIRING SCHEDULE, 6. CONDUIT BURY SHALL BE 2 4". INTERMEDIATE DESIGN CONCRETE JUNCTION BOX ® DESIGN B CONCRETE JUNCTION BOX Construction Notes — — — — UNDERGROUND CONDUIT _LUMINAIRE_III - 4 38+5513305' RT.6 \ 1 \ ,1 STA. 37+25.7 ALLEY PARKWAY STA. 0+00, S.W. I St ST I I I I I I j • I I I I � I I ! I I I I 36+35, 33.5' LT. LUMINAIRE 3n_1 y�A� WASIr' ~�' �� . �yO04% 0/sit9Lo 0 N A L i I a Z J 0 3 z X W 1 36 1 / I I LUMINAIRE III-3 I 0+80 , 27.5` RT � Iz 1 ZIO I �Iz WSJ 1 1 6 3 W cn I I MATCH LINE STA. 35+00 (SEE SHEET I- I ) MoTf% 0 a A4 1 00 TRANSPORTATION PLANNING & ENGINEERING, INC. 1126 - 108TH AVE. N.E. BELLEVUE, WASHINGTON 98004 Ph(206) 455-5320 T. 2 5 1. The Contractor shall submit a request for materials approval at the earliest possible date. 2. As -Built drawings will be required on completion of all projects. 3. The Contractor shall notify all utilities regarding their facilities located within the project limits 48 hours prior to commencing work. 4. The Contractor shall be responsible for any damage to existing utilities. The Contractor shall notify the affected utility and the City immediately upon damage. LUMINAIRE III-5 2+E7,0 , 27.5' LT. S.W. 3 1 St STn co I z O ` J + 4 I v Q I � � LJMINAiRE III-6 4+4,0,27.5'RT. O I 13 i W w w � ir z Cr m o -o I -o NE 1/4 SE 1/4 SEC.25 LUMINAIRE III-7 6+20,27.5' LT. QV UNDERGROUND ELECTRICAL VAULT (VERIFY LOCATION W/PSP&L CO.) LUMINAIRE II1-8 7+60, ON L'J C4.t `T"lr Hay T- /7'l05 0A CITY OF R E N TO N nFRARTMENT OF ENGINEERING BURLINGTON NORTHERN ILLUMINATION SYSTEM Orillia Industrial Park Division II SW 31 st STRPET 2 S.W. 31st STREET JMS1MH I ALIGNMENT, ADD CIRCUIT SZI DHE VHB 4EVISION BY I APPR DESIGNED D.H.E. DATE 8 — I -8O FILE NO _ DRAWN_ _,F. M 11 - 17 - 82 CHECKED V.H.13. SCALE I ��- 40� FIELD BOOK _ PAcf— DATE APPROVED SHEE? 1 .OF4� 0 — or/ —/ SCANW U MAR 2 8 ZOW & b t A. t.