Loading...
HomeMy WebLinkAboutTRO4101765.7Z 0 Z VJ — OX Q U m x� zQ ma �i.►- N -4•-- 0 L Z uw U �Z we m x M z m I(-)j I N v M Iz Cr� i z , m 1 o w 00 z + J rM O F_ N W I- N Zo J o as 3 cr WI W Er 3U z No m G N J 'j W = — — -- — = cn = U v F- Q 4- Nr cow z OU_ w ON 3 + +`�z Q + J 4- J + O '�} Z— "? — (D c� — — a } Q za > COXO Iz ~i v I W Q w 0 m�� jr 2 z m w OZ 3a J z UW Cr(_) Z _ 3 zz O� N m H U W Q ' - 5 16 Z VALLEY PARKWAY J w �•1' H N C' p0� CONSTRUCTION NOTES INSTALL ALL TRAFFIC CHANNELIZATION SHOWN WITHIN THE LIMITS OF CHANNELIZATION, AND OTHER CHANNELIZATION AS NOTED. THE FOLLOW- ING CONSTRUCTION NOTES DESCRIBE TYPICAL CHANNELIZATION DETAILS. OINSTALL 4" WHITE TYPE 1 AND TYPE 2E LANE MARKERS. SEE LANE MARK- ER DETAIL. INSTALL PAINTED 8" WHITE SOLID LANE STRIPE AND 10" WHITE PLASTIC (--2. TRAFFIC BUTTONS (20' SPACING). C3 INSTALL PAINTED YELLOW DOUBLE CENTER STRIPES (TWO 4" STRIPES WITH 4" SPACE BETWEEN STRIPES) AND 10" YELLOW PLASTIC TRAFFIC BUTTONS (50' SPACING). �4 INSTALL PAINTED YELLOW DOUBLE CENTER STRIPES (TWO 4" STRIPES WITH 4" SPACE BETWEEN STRIPES) AND 10" YELLOW PLASTIC TRAFFIC Co co BUTTONS (20' SPACING). � I J J I� F- U U z a J O- 13 STA .29+ 82.52, VALLEY PKWY w I STA. 0+45 , S.W. 34TH ST. X F- _- TUKWILA RENTON N N -- —26 _ c,l O N 3 + Cr. (0 m NI Q O� H' Busy r Tfo • 414w I -0, W i ^S�ONAL IONAIL TRANSPORTATION PLANNING & ENGINEERING, INC. ��__; 1126- 108TH AVE. N.E. BELLEVUE. WASHINGTON 98004 Ph4206) 455-5320 roeo —fit I - / 7,d !` w z J Y Q U 3 Oaf O N + � N Q I8 — 22'0 _- i _22 — LANE MARKER DETAIL DIRECTION OF TRAFFIC FLOW -� 91 15' 3`I 3' 31 15' 331 31 OINSTALL PAINTED YELLOW TWO-WAY LEFT TURN LANE STRIPES ( ONE 4 TYPE 2e LANE MARKER TYPE I LANE MARK ERS SOLID STRIPE PLUS 4" SKIP STRIPES @ 9' STRIPE, 15' SKIP; 4" DIRECTION OF TRAFFIC FLOW SPACE BETWEEN STRIPES) AND 10" YELLOW PLASTIC TRAFFIC BUTTONS (50' SPACING) . NOTE: SKIP LANE STRIPES SHALL NOT BE PAINTED. INSTALL WHITE THERMOPLASTIC ARROW AND WHITE THERMOPLASTIC MATCH LINE STA. 7+00 \J "ONLY" LEGEND (8' SPACE BETWEEN ARROW AND LEGEND). (SEE SHEET C-4 OINSTALL 12" WHITE THERMOPLASTIC CROSS WALK STRIPES (TWO 12" 18 18 STRIPES WITH 8' SPACE BETWEEN). I I I � (� INSTALL WHITE THERMOPLASTIC LEFT TURN ARROWS (8' SPACE BETWEEN �J OPPOSING ARROWS) 7445 18 18 BEGIN LEFT TURN LANE TRANSITION OINSTALL WHITE THERMOPLASTIC RAILROAD CROSSING ADVANCE PAVEMENT MARKINGS. SEE RAILROAD CROSSING ADVANCE MARKING DETAIL (SHEET I I I 7+85 C-3 OF 4) . 22 14 END LEFT TURN (n LANE TRANSITION no 10 INSTALL 24" WHITE THERMOPLASTIC STOP LINE. 0 O w TII INSTALL PAINTED 8" WHITE SOLID LANE STRIPE. I4 8+25 I VALLEY F) 0 KINO X1110 41 BEGIN 8 SOLID WHITE LANE STRIPE 15' Cn 0 Cr Q O 0- It W = N W Q J N to O W W Z m J W = W H a cn � 9, TYPE 2e LANE MARKER It w �0 a)X0 1-zz II III 14� a N O z J +_ M J + M O- �� + CIJ M �O �F- M a I- a U_ a z STA.34+os.o2 VALLEY PKWY. x-INo x1 o 3 = X w w x STA.9a-75 , S.W. 33 RD ST. � 9+2 3 m 30 Zw JW 'CROSSWALK LINE, O mw z o / LIMIT OF CHANNELIZATION U PARKWAY Z z W� w a mJ TUKWILA Z Q -- -- -- -- -- — O RENTON O t_ U) N M = U 'N--� N 32 — — 34 w UJ = o N N W W C Z ONLY ONLY O ~ + � II II II II °N° a I'n MATCH LINE STA. 1+50 (SEE SHEET C-3) LIMIT OF (n CHANNELIZATION ~ O I / 0+97 o N 34148 CROSSWALK LINE _j a_ w BMIN CHANNELIZATION *7 � z O zW CO = + - z co U �ma rOz CITY OF RENTON M w (DEPARTMENT OF ENGINEERING B.N. ORILLIA INDUSTRIAL PARK TRAFFIC CHANNELIZATION GARDNER ENGINEERS, INC. DIVISION 11 VALLEY PARKWAY (14+00 to 35+00) CONSULTING ENGINEERS / PLANNERS / SURVEYORS Since 1883 DESIGNED— D.H.E. DATE 8- I - 801 FILE NO. Arctic Building Penthouse, Seattle, Washington 98104 Telephone (206) 624-5265 i DRAWN_ R.F. M. , I ALIGNMENT, DELETE SW 38TH DHE i VHB I II-17-82 CHECKED_ V.H.B. SCALE I = FIELD BOOKPAGE NO. REVISION BY APPR. DATE APPROVED SHEET C-1 OF 4 DIRECTOR FENGIN"MING r ) ' ANr _>a IV1A 2 8 AL � ,� � �,'�.r• 4'� � � f