HomeMy WebLinkAboutTRO4101765.7Z 0
Z
VJ —
OX
Q
U m
x�
zQ
ma
�i.►- N -4•--
0
L Z
uw
U
�Z
we
m x
M
z
m
I(-)j I
N
v
M
Iz
Cr� i
z ,
m 1
o w
00 z
+ J
rM O
F_
N
W
I-
N
Zo
J
o
as
3
cr
WI
W
Er
3U
z
No
m
G
N
J
'j W =
— — -- —
= cn =
U v
F-
Q
4-
Nr
cow
z
OU_
w
ON 3
+
+`�z
Q
+ J
4- J
+ O
'�}
Z—
"?
—
(D
c�
—
—
a
}
Q
za
>
COXO
Iz
~i
v
I W
Q
w 0
m��
jr 2
z
m
w
OZ
3a
J
z
UW
Cr(_)
Z
_
3
zz
O�
N
m H
U
W Q
' - 5
16
Z VALLEY PARKWAY
J
w �•1'
H
N C'
p0�
CONSTRUCTION NOTES
INSTALL ALL TRAFFIC CHANNELIZATION SHOWN WITHIN THE LIMITS OF
CHANNELIZATION, AND OTHER CHANNELIZATION AS NOTED. THE FOLLOW-
ING CONSTRUCTION NOTES DESCRIBE TYPICAL CHANNELIZATION DETAILS.
OINSTALL 4" WHITE TYPE 1 AND TYPE 2E LANE MARKERS. SEE LANE MARK-
ER DETAIL.
INSTALL PAINTED 8" WHITE SOLID LANE STRIPE AND 10" WHITE PLASTIC
(--2. TRAFFIC BUTTONS (20' SPACING).
C3 INSTALL PAINTED YELLOW DOUBLE CENTER STRIPES (TWO 4" STRIPES
WITH 4" SPACE BETWEEN STRIPES) AND 10" YELLOW PLASTIC TRAFFIC
BUTTONS (50' SPACING).
�4 INSTALL PAINTED YELLOW DOUBLE CENTER STRIPES (TWO 4" STRIPES
WITH 4" SPACE BETWEEN STRIPES) AND 10" YELLOW PLASTIC TRAFFIC
Co co BUTTONS (20' SPACING).
� I J
J
I�
F- U
U
z a
J
O- 13 STA .29+ 82.52, VALLEY PKWY
w I STA. 0+45 , S.W. 34TH ST.
X F-
_- TUKWILA
RENTON
N
N
-- —26 _
c,l
O
N 3
+ Cr.
(0 m
NI Q
O� H' Busy
r
Tfo •
414w
I -0, W
i ^S�ONAL IONAIL TRANSPORTATION PLANNING & ENGINEERING, INC.
��__;
1126- 108TH AVE. N.E. BELLEVUE. WASHINGTON 98004 Ph4206) 455-5320
roeo —fit I - / 7,d !`
w
z
J
Y
Q
U
3
Oaf
O
N
+
�
N
Q
I8 — 22'0 _-
i
_22 —
LANE MARKER DETAIL
DIRECTION OF TRAFFIC FLOW -�
91 15' 3`I 3' 31 15' 331 31
OINSTALL PAINTED YELLOW TWO-WAY LEFT TURN LANE STRIPES ( ONE 4 TYPE 2e LANE MARKER TYPE I LANE MARK ERS
SOLID STRIPE PLUS 4" SKIP STRIPES @ 9' STRIPE, 15' SKIP; 4" DIRECTION OF TRAFFIC FLOW
SPACE BETWEEN STRIPES) AND 10" YELLOW PLASTIC TRAFFIC BUTTONS
(50' SPACING) . NOTE: SKIP LANE STRIPES SHALL NOT BE PAINTED.
INSTALL WHITE THERMOPLASTIC ARROW AND WHITE THERMOPLASTIC MATCH LINE STA. 7+00
\J "ONLY" LEGEND (8' SPACE BETWEEN ARROW AND LEGEND). (SEE SHEET C-4
OINSTALL 12" WHITE THERMOPLASTIC CROSS WALK STRIPES (TWO 12" 18 18
STRIPES WITH 8' SPACE BETWEEN). I
I I �
(� INSTALL WHITE THERMOPLASTIC LEFT TURN ARROWS (8' SPACE BETWEEN
�J OPPOSING ARROWS)
7445
18
18
BEGIN LEFT TURN
LANE TRANSITION
OINSTALL WHITE THERMOPLASTIC RAILROAD CROSSING ADVANCE PAVEMENT
MARKINGS. SEE RAILROAD CROSSING ADVANCE MARKING DETAIL (SHEET
I
I
I
7+85
C-3 OF 4) .
22
14
END LEFT TURN
(n
LANE TRANSITION
no
10 INSTALL 24" WHITE THERMOPLASTIC STOP LINE. 0
O
w
TII
INSTALL PAINTED 8" WHITE SOLID LANE STRIPE. I4
8+25
I
VALLEY
F)
0
KINO X1110
41
BEGIN 8 SOLID WHITE
LANE STRIPE
15'
Cn
0
Cr
Q
O
0-
It W
= N W
Q J
N to O
W W
Z m
J W
= W
H a cn
� 9,
TYPE 2e LANE
MARKER
It
w
�0
a)X0
1-zz
II
III
14�
a
N
O
z
J
+_
M
J
+
M
O-
��
+
CIJ
M
�O
�F-
M
a
I- a
U_ a
z
STA.34+os.o2 VALLEY PKWY.
x-INo
x1
o
3
= X
w
w x
STA.9a-75 , S.W. 33 RD ST.
�
9+2 3
m
30
Zw
JW
'CROSSWALK LINE,
O
mw
z
o
/
LIMIT OF CHANNELIZATION
U
PARKWAY
Z z
W�
w a
mJ
TUKWILA
Z Q
--
--
--
--
-- —
O
RENTON
O
t_
U) N
M
=
U
'N--�
N 32
—
— 34
w UJ
=
o N
N
W
W
C
Z
ONLY
ONLY
O
~
+
�
II II
II
II
°N°
a
I'n
MATCH LINE STA. 1+50
(SEE SHEET C-3)
LIMIT OF
(n
CHANNELIZATION
~ O
I
/ 0+97 o N 34148
CROSSWALK LINE _j a_ w BMIN CHANNELIZATION *7
�
z
O zW CO =
+ - z co U
�ma rOz CITY OF RENTON
M w (DEPARTMENT OF ENGINEERING
B.N. ORILLIA INDUSTRIAL PARK TRAFFIC CHANNELIZATION
GARDNER ENGINEERS, INC. DIVISION 11 VALLEY PARKWAY (14+00 to 35+00)
CONSULTING ENGINEERS / PLANNERS / SURVEYORS Since 1883 DESIGNED— D.H.E.
DATE 8- I - 801 FILE NO.
Arctic Building Penthouse, Seattle, Washington 98104 Telephone (206) 624-5265
i DRAWN_ R.F. M. ,
I ALIGNMENT, DELETE SW 38TH DHE i VHB I II-17-82 CHECKED_ V.H.B. SCALE I = FIELD BOOKPAGE
NO. REVISION BY APPR. DATE APPROVED SHEET C-1 OF 4
DIRECTOR FENGIN"MING
r ) '
ANr _>a IV1A 2 8 AL � ,� � �,'�.r• 4'� � � f