Loading...
HomeMy WebLinkAboutWTR2701765.9Z S LIPERIOR REPROGRAPHICS a =S Q ►�l 11 _dI 1 _ott -Q 7 b CQ x w -� O�O0i v Q �i-3 + Qom= o ISZZ— li� ICQ Q X rQ Rl cu f-- �► -<cv I I Is OAQ5PALE kE:HUr - -ON 7eEN6HF?II W OTH _J- -M.J, 6Ar TAFPt:P FOIE n�A�MAN DLOGK NOT TO GALE Z K 1*J N p �L► 01— eu z k ti ° fl- + } + _—, \H1 S 3 ` AA__ � LZ + `cU� + NE z +N Q �= d ; ts-} -3 OAKE6DALE- AVENUE S W 4.1�-84 LI-z8�84 K! W A r ci J IL O4�3 r aO� o o + S + Nc�1O�N���, +_ - + GARDNER ENGINEERS- INC. Market Place One Suite 241 200i `Western Avon it Seattie, Washingt n J6i' (206) 624-5265 a I2" 01. (TJ ) CI. �52 �z 7D =q } GENERAL NOTES 1. All work materials shall be in conformance with the standards and specifica- tions of the City of Renton Utility Department and the latest edition of the APWA Standards and Specifications. 2. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 3. All water main pipe to be cement lined ductile iron pipe conforming to ANSI Spec's A-21-51-1976 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to ANSI A-21-4-74 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. 4. All fittings to be cast iron, cement lined, Class 250, unless otherwise specified on drawing conforming to ANSI Spec. A-21-10-1977, ANSI A-21-11-1977 or latest revision. All fitting joints to be mechanical joint or flanged. Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be 125 lb. configuration, unless otherwise specified on drawing. 5. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All water main 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. 6. All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washinq,ton State Health Department. All pressure testing shall be done in the presence of a repre- sentative of the City of Renton. 7. A preconstruction conference and twenty-four hour notice will be required prior to starting new construction. 8. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 9. Installation of corporate stops, water services, lines and meters to be accomplished by the City of Renton. 10. All connection to existing mains to be accomplished by the City of Renton. All necessary excavation and materials to be supplied by the contractor and be on -site prior to City notification. 11. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify the Utility Department 24 hours in advance of backfilling all construction. 12. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. o �- x i VAAQs � Ou B1.1P.L1'11 (N NORTHERN O ILLIA MUSTRIP_�,L PARK DIV. II Pi AJ` P II REVISION BY APPR. I DATE C U February 1980 TUKWIL.A CITY LI M 1-P2 L QNT"ON Gir7i` LI M►T6� Z 0 �Q + TUKWILA CITY i✓�MlT2�2 i2?NTOM GI7r LI M I T�2 �°� �2' 2X CITY OF' RENTON OAKE�?bALE- AVE-NUC7 UNATF--12 FLAN ETA 24 +00 TO RYA 4 2 +02 .'i9 DESIGNED HH DATE Qj _ �2 .- FILE NO. DRAWN i �>e�r_ �— ,I CHECKED HSCALE _FIELD BOOK —PAGE-- APPROVED- SHEEIJL7 C- OF _ GIRFc.TOR Or PUBLIC WQ CS.9n4a27 OAKE6DALE- AVENUE S W 4.1�-84 LI-z8�84 K! W A r ci J IL O4�3 r aO� o o + S + Nc�1O�N���, +_ - + GARDNER ENGINEERS- INC. Market Place One Suite 241 200i `Western Avon it Seattie, Washingt n J6i' (206) 624-5265 a I2" 01. (TJ ) CI. �52 �z 7D =q } GENERAL NOTES 1. All work materials shall be in conformance with the standards and specifica- tions of the City of Renton Utility Department and the latest edition of the APWA Standards and Specifications. 2. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 3. All water main pipe to be cement lined ductile iron pipe conforming to ANSI Spec's A-21-51-1976 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to ANSI A-21-4-74 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. 4. All fittings to be cast iron, cement lined, Class 250, unless otherwise specified on drawing conforming to ANSI Spec. A-21-10-1977, ANSI A-21-11-1977 or latest revision. All fitting joints to be mechanical joint or flanged. Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be 125 lb. configuration, unless otherwise specified on drawing. 5. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All water main 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. 6. All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washinq,ton State Health Department. All pressure testing shall be done in the presence of a repre- sentative of the City of Renton. 7. A preconstruction conference and twenty-four hour notice will be required prior to starting new construction. 8. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 9. Installation of corporate stops, water services, lines and meters to be accomplished by the City of Renton. 10. All connection to existing mains to be accomplished by the City of Renton. All necessary excavation and materials to be supplied by the contractor and be on -site prior to City notification. 11. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify the Utility Department 24 hours in advance of backfilling all construction. 12. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. o �- x i VAAQs � Ou B1.1P.L1'11 (N NORTHERN O ILLIA MUSTRIP_�,L PARK DIV. II Pi AJ` P II REVISION BY APPR. I DATE C U February 1980 TUKWIL.A CITY LI M 1-P2 L QNT"ON Gir7i` LI M►T6� Z 0 �Q + TUKWILA CITY i✓�MlT2�2 i2?NTOM GI7r LI M I T�2 �°� �2' 2X CITY OF' RENTON OAKE�?bALE- AVE-NUC7 UNATF--12 FLAN ETA 24 +00 TO RYA 4 2 +02 .'i9 DESIGNED HH DATE Qj _ �2 .- FILE NO. DRAWN i �>e�r_ �— ,I CHECKED HSCALE _FIELD BOOK —PAGE-- APPROVED- SHEEIJL7 C- OF _ GIRFc.TOR Or PUBLIC WQ CS.9n4a27