Loading...
HomeMy WebLinkAboutTED4001770.6V) �L 0 oftft CIO Alv /.5 Ca/4f- ry0f42a771�, PLAN. TOP T0•® i%N1 04- :545PA,qATOk 77k'�e--. < T 11. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE Z. on l< IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM ;70 P 'vvl ca DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 lv�uj r PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST Fv EXTEND FOR ONE PIPE DIAMETER ON EACh SIDE OF THE PIPE OR rl I —I Mr— Mr— M��AT�TT AAnMTIn"rTTCN Mr\ ��f\ANnTTM'M MTTTI 1—rTT i-I T T' ✓o 1 7 lzx�>-BUILLJ 8- 2 5 8 /STE cj.'co'-rrl' .41 [AM I 7TS:_t5u1LT ul<HVVILNU Ur I"rlrl olumll ui�- LiNt7z omoLr�in, inr, otu4LLAAiS. W. H T. j SEWER SYSTEM AND THE SITE GRADING WHICH HAS BEEN STAMPED -L ENGINEER, AND SIGNED BY A LICENOED PROFESSIONA < GOVERN E '�7' N6 IC ALL 48 HOURS B;' 'K �"� � T � , BEFORE YOUDIG APPROVED FOR CONSTRUCTION. DATE __l 70 t P , imm L! DRAWN BY CHECKED P G. 85213