Loading...
HomeMy WebLinkAboutTED4001770.7GENERAL NOTES 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION, 1984 (APWA) AND CITY OF RENTON STANDARDS. 2. CONTRACTOR SHALL PROVIDE AND MAINTAIN TEMPORARY SEDIMENTATION/COLLECTION FACILITIES TO INSURE THAT SEDIMENT LADEN WATER DOES NOT ENTER NATURAL DRAINAGE SYSTEM. THESE FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND CONSTRUCTION AND MUST BE MAINTAINED UNTIL CONSTRUCTION AND LANDSCAPING ARE COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 3. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE. 4. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON). IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE UTILITY DEPARTMENT 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION. 5. STORM DRAIN PIPE SHALL BE CONCRETE, RUBBER GASKETED ASTM C14, CL.2 OR ASTM C-76-II OR 16 GAUGE GALVANIZED STEEL TREATMENT 1 ASPHALT COATED OR 14 GAUGE ALUMINUM HELICAL CORRUGATED METAL PIPE WITH WATER TIGHT CONNECTING BANDS. ALUMINIZED STEEL NOT ALLOWED. 6. STORM MANHOLE SHALL BE PER CITY OF RENTON STANDARDS. 7. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE. 8. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE SAME AS DESCRIBED. 9° IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY CONSTRUCTION. 10. PLANS APPROVED BY THE DIRECTOR OF PUBLIC WORKS SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS. 11. THE STORM DRAINAGE SYSTEM SEWER SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS WHICH ARE ON FILE AT THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS. ANY DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS. 12• A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PRC'DPSS. 13. THE -DRAINAGE DITCH AND ALL DISTURBED AREAS SHALL BE GRASS SEEDED BY AN APPROVED TYPE HYDRO -SEEDER. ACCEPTANCE WILL BE BASED ON A UNIFORM STAND OF GRASS. a �,$' NltNus cusN�V ``: �-s. ff.-••.3� :-.a ,a:ir: d• ROCK . ° til = II t_ III=111= I(1=III CbMPei�CTE D SI1B(sK.ADE To QS'/ MoolFlEo PRC,CTO2 MAX. P N51TY• Rc�Ao S ECT I o r l til6GK PI(_L- - PER APWA. COMPACTED TO 'tS% MOD. PROCTOR DENSITY UNDER ROADWAY UP TO BOTTOM O F' SU S&RA bE . USE 9'o% MOD PROCTovI DEM5M e . BEDDING- PIT-RC1N GRAYEt_ C CLLSS "A") 4" MAX. VIMENStON, S '/o MAX. PASSIN& Na. ZOO SIEYE , COMPACTED TO 910 MOD. P$OCToR OENSITY P 1176 C3E D D 196 FOR 3Co'( � go SOALE 8 z 2Z 2\�\ I 46 \ 1+ �Al- �� \ 30 Z8 �g I hISTAC-_L KO RTF4�cltN � `\�t�l l N V E tzT &T THE LOAN / �- 2 q ' FOI NT OF 6.CIST 11`1& C-0QDDE. Lam' �°c b10 MIN INV. GL t-L.So �l `�ti� pl MAx INV EL tL�°c -30 L.F. 8" S.D. R) O.S% I ICI STALce N OR•T FI E RN I t-WER.T A,T -r {.EE LOW Plo (MT O F EXIST/AIC3 GrZADE - MINI INV. ' (_ Iz•SO M 4)( I M\I . EL t3.00 S GeI.E I"= 50• ci W� a� t +GS c- 0 L� 0\• \a. ti> C�) ENS SEtcT oN 6-d) 0) Ix• FF_OPoSE® 40 , Acccs� c¢ �P 1 \1 �!1'1 a' L E I�IZ.�D•lN� EOS6ME1.1'r 2° B 8 .� V°••: STA.. �+�Z.•� TC o F t)t� PE �tx EX. . z4" c ,rat , P. t�� QITcb4 �. i?- o.: o .E. I6.70 - L Q r—�-10' is,. ` -y - _ - ---- -- ­­­­ � / 9,. SS- Is, ao" E. yw �`'• ° a °e� J • Q My.S.D FJ(S I 0.v '-� •• .tl/. 7 "u i OI I.4� p 1O` - Fog EA5EMEl,IT -•_��z — - dD N °-- - a��_ . - ��' -. - �'�i- - - --3-Cs.l� - _ �j� - �RclC.4. - I pP[ tttG DTP-ANSPo(Z�A�10N II M n LDS) �b \tJ i�b �- I Y l ♦ O'F ol(_ �• GAS. I 0 �In� f EXtSTtNG ZO' i q?�� QIZ�WaD TOE OF SLOPE RJ&IL.Ro6.O r UTtL.1TY STA. ��53.3�o P•C.I I�II'N I / 0tD W Iwo" Q► Eo.SEMENT LINE SEE sECr1oN C3-(3 / v NJI W 1 `' CU'_v E 0b'Ta° 'Q STA O+oo (F-:-w.) _— 45' � STO1ZM M.K. S4- 4 PER. CITY (21✓NTol'A STD, 2 I � � 0 -15 H . D. K . -mot cr 77.5 T. E . l Cl Ars ID- E . cf .4$ L II I I� T c 36.Iz' 4.0' L=ASEzrt� e� t t=o2 dGCESs p�JL D SE-CTl o� I SEE DETAtt_ TI.1• l S SIkEET • 1` to O'TOC; 3.o s 3 Z z QUl�RtZY SP4LC_ �o �O� -T4llCKNESS -- LINE17 vITC!-t r 'I NOTE •. QuAv_QY SPANS SNt>LL, LINE DITCH AS swowl t ow RIP- RAP CH&VVV. S EC'T 10 NA 5 - e) M.T. S. 40 40 t5' I' T.E • 1 �.00 4 I ' SLoPc a Ex. Z& iKAA,_ t�AD to' StAPE dCCCSS !✓A.S@1MCflT � T I `.- lT�' I EASC MGNT E���T �/ � ._.. Imo- --•- _ .- . _ _ ._ - _ __- -7 I FOK ACC.CSS IZOG1� D=Z 1' SELTtoN SEE D�TdI� D RAI N�eC�E SWtk-e PUSS tNG C RV wcrIr uT 1 SIDE OF FAC%rc STA. o+3S To STA. 0+r-5 STA. (�`53 TO STD, 7+14 STA. -7+,4 To STA. 7+6S SO - 4" - Co" _ s O — "- IZ" SO _ So iz"- IV, So - So TI-11CKNESS i ' ., of Z7 Q Z 7'� I•tIP - RAP _ Rid' RAP G �Us,?_T SECT I OM A,- A - N.T. S. To - o F 61�-N y__ L � l`�11t�1. E���• = 15.0 _ 0•tG% 3 �, 0 S De a Q• 5x, • � pi%� t_ I N E c P OL OPEN D1"CCI1 aJ O• Ico% IZtP - ZA•P SEC 0-46 r.T � > •�0' W Lp ¢ + 0 N W 0 - 0 Q, w z � G lU Q W _ A A r Ao c n ": /I L] C A CC _r /'1 C n %I►/ F 1 1 �-k., 1"= 5° V . A107-E•• /0,9,4//11AGF OlTCH S"564" B/- ffi�0lP®- 5EF��! �o 1o190V1z2-` //iY/F0Ir,44 S T//NQ O� GSA s s �OFj Bl0/c/L rEfp/A/G /�-61Wef T/0IV, S / ,E• G 1VE;,Y4L /Vo %E /1/0- /3 5 J TOP OF aA.Nx , d 0 oQ 15 P_�R- RD.P 5EE C41S:V_i o �° v o 0 (\ !L I � ar 11•I 3 o' a' DITCH DITc o� 1.7 % o'D 14'/, 0 0 () N - m cv d00 O� Z �� J rr } U) w Z> T� i U C) Q J Ir LLJ Q w W Cz'rtf V L/� O z U) cc W Q LLJ J LLi Q O Z O� M O Y.1 O N V v C%) N Cl) O N Mime v� N W Y I � of W a W W f' I� Q J 0ry w o o 0LL ~ V V Q W w 5 = V, Y p 11,, v LL eJ � d Q CHECKED By W. 1Z• A.D. s<v I,. = 5 ` 6-z - S7 JOB NO 75-to SHEE' OF 1 SCANNE0 MAR 2 8 tiJ3 � ' i445