HomeMy WebLinkAboutWTR2701770.1z '-BUILT 0 — 8 - " GENERAL NOTES 1. All work materials shall be in conformance with the standards and specifica- tions of the City of Renton Utility Department and the latest edition of the APWA Standards and Specifications. 2. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as tc avoid damage or disturbance. 3. All water main pipe to be cement lined ductile iron pipe conforming to ANSI Spec's A-21-51-1976 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to ANSI A-21-4-74 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. 4. All fittings to be cast iron, cement lined, Class 250, unless otherwise specified on drawing conforming to ANSI Spec. A-21-10-1977, ANSI A-21-11-1977 or latest revision. All fitting joints to be mechanical joint or flanged. Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be 125 ib. configuration, unless otherwise specified on drawing. 5. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All water main 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. 6. All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washington State Health Department. All pressure testing shall be done in the presence of a repre- sentative of the City of Renton. 7. A preconstruction conference and twenty-four hour notice will be required prior to starting new construction. B. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 9. Installation of corporate stops, water services, lines and meters to be accomplished by the City of Renton. 10. All connection to existing mains to be accomplished by the City of Renton. All necessary excavation and materials to be supplied by the contractor and be on -site prior to City notification. 11. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify the Utility Department 24 hours in advance of backfilling all construction. 12. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. , I -�D r F.NSIONS ' r.` -NTON CONCRETE I � DUCTILE IRON PIPE FLANGE PLANGX PLAIN END j 187 2�x2kx4 FIRE DEPARTMENT CONNECTION, DETECTOR CHECK t. WTTk. BY-PASS 7 i 0; -� . 4t O x�[ " v • ow 2 -3 •,SWING CHECK VALVE „>Z ? z GATE VALVE WITH INDICATOR POST FLANGED TEE - PLAN 8" x 3/4". DETECTOR CHECK FLANGED ELBOW' DETECTOR CHECK WITH I" METER EQUAL TO HERSEY-SPARKLING METER CO. 8"xl" HERSEY . D.C. DETECTOR CHECK ASSEMBLY. '.CTOR CHECK WITH I" BYPASS. BYPASS 'C 1" GATE VALVE. I" METER AND 1•' CHECK WITH ALL BRASS PIPING AND FITTING QUIRED) 'LANCED COUPLING ADAPTER, L TO ROCKWELL INTERNATIONAL 090508-000 1ETER OF OPENING SHALL BE 4" ;ER THAN THE OUTSIDE DIAMETER 'HE PIPE �- -COMPACTED POLYETHELENE SEE NOTE 5 P i / CONCRETE SUPPORT PAD SEE NOTE 4 ELEVATION 8" DETECTOR CHECK VALVE 10"0/4" 8"x3/4" 6"x3/4" FIRE DETECTOR CHECK AND METER ASSEMBLY I DET.. CHECK CHECK VALVE / GAZE VALVE __T WITH IN➢ICATOR. POST NOTE: 1. LOCATE .VAULT IN PLANTING AREA NOT IN PAVING. 2. INSTALL GATE VALVE IN WATER LINE SUPPLYING DETECTOR CHECK IN SUCH A MANNER THAT IN CLOSING THE VALVE NO THRUST WILL EXTEND THROUGH VAULT PIPING. THE VALVE MUST NOT BE MORE THAN 50' AWAY FROM VAULT 3. PIPE TO BE DUCTILE IRON CLASS 53, CEMENT LINED. 4. TEMPORARY SUPPORT SHALL BE PRO- VIDED UNDER VALVES AT THE TIME OFA NSTALLATION TO CENTER THE PIPE IN VAULT OPENING. AFTER COMPLETE INSTALLATION, REMOVE THE TEMPORARY SUPPORT AND INSTALL CONCRETE SUPPORT PADS. 5. CUT 3" THICK x 5" WIDE ETHAFOAM 220 OR EQUAL TO A :.ENGTH NECES- SARY TO FIT THE SIZ£ OF PIPE INSTALLED AND COMPRESS INTO PLACE., THE CONTRACTOR. SHALL MAKE SURE THE FOAM IS COMPACTED TIGHTLY BETWEEN PIPE AND VAULT WALL WITH NO VOIDS. LIGHTLY GROUT INTERIOR AROUND PIPE. ^{"rl t�l '1JI���i'L ICI IJC V 1�'w ppiir�"()v"A^I 64 my v APPROVAL S 14 Z'L + 7- o CS.vJ EX. GAGE VALve L4TIL�LTY FOL.0 RECOMMENMD F41P APPROVAL TOR OF PUBLIC W I \ \1 ui \ � W / `r EXISTrAIG `� • tam- _-: �jT*-, 1°3+ 0'5.9 =23 +40 cS.M1. IOST.� Exlsr rwl �i T•y L"S '►��.(0 1=X1ST1N4 },;. 1^ 1 0/40 52"V (FL) '7T[\ 154 89 (,o =.. j IO'ekrr. VAXVE CMS V FL-) 1 - Iolclo'TEE `►^jv FL — _ I-• IZ."x lo'T as (FL >r M3) % "Go1�1C BLK. �2 Q�J l-TC. � � Id K (o 1 Et (M ��( FL� I P,L_IND F tiCow1G•$L.K.PER REN!'pN. sra. �rJ-� lri' TG VALMS 1 -l2" �A 7 CM.1) 1 ^- (o" 6[�-('� VALVEe LGA CM �) 6r4- k LK 3) V O. H Y f) . (rox- cAry or RZFJT1C>sI Sr1J.) �— 20'x10' WATER EASEMEN-T - .. � o ' wA.... L ra�R FASBME�Ir \ TTV,Sr/N4 25 WipE (/r/c.1ry EosEM,%Afr -- Ex 14yD. L o F3w Mo✓EP) F � `' h?YT7s�A1.sT To ►.lE I I X\ All, P 7. Qrt L IT y BASEMENT I ! /6 -- -�-------- \ + I 1 4 . 1 b+-Zo or' L (FrLxM3) STD,. __W W inAII/c1 I k ` J STA �- IV x IZX V FL) \?q Comc '5LaGr- j - fe" Dl�I-�-ro� GvlEctc- �/.4l-vim ,�.sSEMBI.�! jN� }IRE DEFT. C0,0,14EcTioW, PErz C,t-ty 1Rsu-T70rl S-rc— 4j O g8n! M) V(/ / Co--jr_ Z3. c.. L LIJ EASEwtC-LUT iz