Loading...
HomeMy WebLinkAboutWTR2701770.6M 0 r CALL 1 BEFORE HOURS I DIG -800-424-5555 GENERAL NOTES 1. All work materials shall be in conformance with the standards and specifica- tions of the City of Renton Utility Department and the latest edition of the APWA Standards and Specifications. 2. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. 3. All water main pipe to be cement lined ductile iron pipe conforming to ANSI Spec's A-21-51-1976 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to ANSI A-21-4-74 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. 4. All fittings to be cast iron, cement lined, Class 250, unless otherwise specified on drawing conforming to ANSI Spec. A-21-10-1977, ANSI A-21-11-1977 _. or latest revision. All fitting joints to be mechanical joint or flanged. Flanged joints shall be drilled in accordance with ANSI B 16.1 and shall be 125 lb. configuration, unless otherwise specified on drawing. 5. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All water main 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. 6. All water mains shall be pressure tested and disinfected in accordance with the specifications of the City of Renton and the Washington State Health Department. All pressure testing shall be done in the presence of a repre- sentative of the City of Renton. A preconstruction conference and twenty-four hour notice will be required prior to starting new construction. 8. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 9. Installation of corporate stops, water services, lines and meters to be accomplished by the City of Renton. 10. All connection to existing mains to be accomplished by the City of Renton. All necessary excavation and materials to be supplied by the contractor and be on -site prior to City notification. 11. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify the Utility Department 24 hours in advance of backfilling all construction. 12. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. As 1501 _.T LOG vVATE2 V/-\t-VE \ ANGD epL_0V1%J OFF CSC y s X �v \ 3 17.sp 0 UP \ A S -6(J I L T LOG. <:4- ATE VAL—VE. 12 '�V j 12'�Lz 01-9°dar v'I � � I s DO- O, N � I N G Qb x ao 0 R A n Z co CA -; As� 15tJILT_ LaG wV \ Q0 00 2 30,. l. A5 BUILT LOL- U as voe_ J I✓ N I ° 14' 2 S" E 347 61' L• F _ u - - E-X 1ST 1t-�G 5.5' N 10 14' 28" E 2 71. 36' E X 1` Tit` C_� to, W ET ---- ��x 25' UFLL1, C-aser�er.,T STA i A t o5.at Fi.5• i-7. CLATIL.IT`' ee>M1r.) e7 23 -+ 4 0, l0 Q-T. CS_W. Ito" EK-TC-4DED*) TZ_eMO\/S tZ" PL�UC% &MV 1NsTAL�L"` 5UM)rz 12" P i P E . Air 41Z- ALL- (`4604r(LE'a ,Sri 1 JITM 12 G-,WrO Vol_VE M� Ill VAUL.T) gcc-F_ £ UTILITI/ EA.SENIENT FE1z ot-a7 O F \),l ,qs I-1 I N C� T O t�l T C- C H I-1 l C_ 4, L C e t,-I T E IZ AS IZEcv2De0 IN \/0LUME 12Z Or PL ATS FACaES qS Tt10uGI+ I�Z RC-c.or��S O F KIrlG LOUIJ l y WL\5I.11t lCaT0 t-1 . POwELL AI/E. S.W �'rLLrL _F FIRE Ac-L 6 SS I I � muIL-r Lac. F12E l-i Y/L72.A)J T THIS DOCUMENT HAS BEEN PREPARED FOR PERMIT APPLICATION AND IS SUB- JECT TO REVIEW AND MODIFICATIONS BY GOVERNMENTAL AGENCIES. DO NOT USE FOR CONSTRUCTION DATE: AS-BUILT 10- 8-86 A5-e5Uii_-r LOGAT101V of= wV ,7A . O + �i;5 5' L i I - 10- PLO 6 (M�) 1 LOt.LC. ?JLarAL- 10' VJATEK EAScMEnIT A5 - 13U1[_.T .LOC-. o f 0 VV V IS STA. 1S* SIB �' L"f I_ TAPPING TEE (M�tFt.l i- TAFFIOC- CArE APPROVED FOR CONSTRUCTION c. J46_ CITf OF RENTON DEFT OF BLIC WORKS DATE RECOMMENUED • AP R AL ` /. / i COMMENDEAAD a ?1Q,_ ftC0MJMCNDED FO B_-.r- RECUMMENCX Q FOR APPRON/,A\iL A144wo /770 a 4 W* 99 *M_1'11'rr1J* �D G. GO O�POF WAS",�L `0 � � Y L(/v /O�rE EN6.,`� Al CV O d � Z (f) w M _J 0 O Q 0 LU LU ZM T� :D Q i C-6 Ca Cf) Cr QW W Wz O z I--- Cr W w -J LLJ .*. Q y U � cl) 0 Z_ D :5 rn o ca 0 N v CY) N CY) a CD N w' Q zI LLJ ZED OC�z z Ln F O W u o z Xz 5 c=n W (f) U) c Z 0 �O > z LLJ J Ld Q DRAWN BY: CHECKED BY PG RGG SCALE. DATE 20' JOB NO e)51G1 .Os SHEET L OF