HomeMy WebLinkAboutWTR2701777.5vJ
o
�h
Q
h
W N
`SW Z,4N
GS7pN R
D.
222
—POLY W%;�A PFIA16 A1,1D c/OI,vT
BOND/N6 AS /?EEQUI RED BY
C /TY OF SEA TTLE WATER
` DEPARTMENT SEE DETAIL SHT, S
S T.
EX. cc,, S TEEL PIPE 22/ CITY OF SEA TTL E CEDAR RI VER P/PEL INE e ,3 —
220
EX. 66 " STEEL PIPE CITY OF SEA T TL E C'ED,4R IFI V5R P/PEG/NE # /
CONC. 715 Cl TY OF SEATTLE CEDAR R/VER P/PEL/NE * 9
CEDAR RIVER P/PE L N. R/W
CONNECT TO EX. TEE
W/CDUPL ING � 8 "C.
SOLID SLEEVE AFTER
`
REQ UIRED TES TING
TEMP. BLO W -OFF
AS5HA13L Y
—2/8
2/9—
2/7-
14
N
W _
//-25-39 / SHIFTED L/WE -e REV/SED STA- BF
Designed DN Approved P O O L SOUTH KNOLL 3
Drawn BF Scale /„ = 20' Date IVO V 1,995 ENGINEERING, INC. 1225 Tongass Auenue S. 134 t h ST WATER PLAN
Date No. Description BY I Ketchikan. Alaska 99901
REVISION Checked Project No. S 92 0IO2 Consulting Engineers & Suruetlors (907) 225-6626