CONSTRUCTION SEQUENCE
1. REMOVE SIDEWALK AND HANDRAIL FROM SOUTH SIDE
OF EXISTING BRIDGE.
2. REATTACH HANDRAIL TO THE REMAINDER OF THE BRIDGE
ON THE SOUTH SIDE.
3. CONSTRUCT SOLDIER PILE RETAINING WALL, AND ROCK
WALL.
4. CONSTRUCT REINFORCED EARTH WALL NOS. 1, 2, 6 & 7.
OVERALL LAYOUT OF EXISTING BRIDGE a APPROACHES 5. CONSTRUCT STAGE I OF NEW BRIDGE STRUCTURE.