Loading...
HomeMy WebLinkAboutTED4001782.356 Z W c� ti� O O ____ - 0 0 0 0 __ 25� pll NOTES: TOP DECK REINFORCEMENT PLAN - SPAN 1 1 1. NUMBEHZi AT END OF BARS INDICATE DISTANCE IN FEET FROM CENTERLINE PI ER. 2. PROVIDE 2'-0" AND 2'-3" MINIMUM SPLICE LENGTH FOR NO. 5 AND NO. 6 BARS, RESPECTIVELY. I STAGGER ALL LONGITUDINAL TOP BAR SpL!r: RY 5'-0" UNLESS NOTED OTHERWISE. 4. ALL NO. 5 Br.nJ SHALL BE AS LONG AS PRACTICABLE 5. TRANSVERSE STEEL REINFORCING BARS ARE NOT SHOWN FOR CLARITY. SEE CROSS SECTION ON SHEET No.41. 6. ALL DECK TOP STEEL REINFORCING BARS ARE EPDXY COATED; SEE BAR LIST. 7. FOR LOCATION OF STEEL REINFORCING BARS SEE SHEET NO.41. & FOR LOCATION AND SPACING OF TRAFFIC BARRIER ANC 11OR BOLTS SEE SHEET NOS 44 8145. SUPERIOR REPROGRAPHICS r4o (o o 5, PZ2 SCALE- 3/161t=11-011 J GIRDER O GIRDER Ell GIRDER DE t GIRDER OD GIRDER CO GIRDER OB GIRDER AO N o LL Q LL IL1 U Lu Q OU OLw Q cn LL cq<LL �T) LU U a o� �� �� Q REGION NO. STATE I FEDERAL AID PROJECT NO. I SHEET NO. 10 WASH. BRM-1288(2) I-405-3(�35� 83W 104-, PRECAST GIRDERS ?_-6" MAX.- NORMAL TO CROSSBEAM-TYP COLUMN STEP 1- SET GIRDERS IN PLACE END DIAPHRAGM (TYP) PRECAST GIRDER (TYP) -INTERMEDIATE DIAPHRAGM �REINFORGEMENT FALSEWORK SUPPORT TO CARRY FULL. DEADLOAD REACTION INCL. DECK- LOAD SHOWN 15 CONCRETE DEAD LOAD PER GIRDER ONLY. ',TEMPORARY---- COLUMN (TYP.) SUPPORT (TYP.) STEP 2 - POUR DIAPHRAGMS, AND PLACE REINFORCEMENT CAST ROADWAY SLAB (NOT UNTIL 24 HRS• MIN. AFTER ROURING DIAPHRA61VIS IN THAT SPAN) /— CURB (6"X6") NOTE: G1 CAST 6"X6''CURB AFTER ROADWAY SLAB HA5 ATTAINED A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI. Q NO TWO ADJACELT SP/-,kJ5 MAY GE POURED OIU THE SAME TDA\/. STEP 3- POUR ROADWAY SLAB 4 CU R B AFTER CASTING ADJACENT ROADWAY SLABS, POUR CR055BEAM IN 2 POURS. BOTTOM POUR TRAFFIC BARRIER SHALL NOT BE PLACED SHALL NOT BE MADE UNTIL 30 DAYS (MIN)- UNTIL, FALSEWORK HAS BEEN RELEASED AFTER RELEASE OF PRESTRESS, TOP POUR TO BE MADE AFTER BOTTOM POUR HAS ATTAINED A MiN. COMP. STRENGTH OF 2000 P-S.i. IIU NO CASE S4ALL ToP PauR BE MADE LESS THAILI 12 HOURS AFTER LowE R POUR REMOVE FAL.SEWORK AFTER ALL CONCRETE, EXCEPT THAT IN THE TRAFFIC BARRIER, HAS BEEN IN PLACE THE REQ D• LENGTH OF TIME AND HAS DEVELOPED SUFFICIENT STRENGTH AS OUTLINED IN THE SPECIFICATIONS STEP 4 - PLACE CROSSBEAM TRAFFIC BARRIER NOTE- SEE PLANS FOR GON5TRUCTION STAr.�E5 � JOINT LOCATIONS. *ALL LINES OFGIRDERS EXCEPT LINE DO MAY BE SUPPORTED ON PERMANENT FOUNDATION. SEQUENCE OF CON57RUC710NI FOR SUPERSTRUCTURE NO SCALE R G. �,.ft'a LAN /V WA h�2yY"S{ PHA ENGINEERS INC. 3 aENISED PER RECORD DRwa.0 _ 3.Iz,�7 320 ANDOVER PARK EAST CIVIL AND STRUCTURAL ENGINEERING CONSULTANTS URS C MPAN'Y Z Rev, StaP 3 Datai 1 5-11-84 R4EGURD wtl�G SEATTLE, WASHINGTON 98188 Consulting Engineers and Analysts I Ray.Sfa9atoSrfap, Rdv. ,votes �P 4A 6-0-84 Seattle, Washington NO. REVISION BY APPR. DATE IVARI CITY OF RENTON DEPARTMENT OF PUBLIC WORKS �- S.W. GRADY WAY BRIDGE REPLACEMENT DECK REINFORCING PLAN -SPAN II DESIGNED K'H• DATE APRIL, 1982 FILE NCI DRAWN - CHECKED D•L• SCALE AS NOTED FIELi: PAGF-- APPROVED SHEET__4O_OF 63_ DIRECTOR OF PUBLIC WORKS G''�� SCANNED MAR 2 8 2a� 7ia