Loading...
HomeMy WebLinkAboutTED4001782.42it EXPAN510 CKOUT*' c: JOINT 5LO APPROACH SLAB #W5 t / 5t CONT.- v ,. i r_ r �,. 7 E . FOR P E' 1',41 F NC-"' —"' ' F/ Ui 7 F I E 1- . .EE HEET 10 NOTE CUNT RACTO R SHALL VERIFY TH - �I MFENG IONS WITH �-;-�ION .JOINT MFGR. �)R TO P0JR.I NG BLOCKOUT5. T !NC1PEN7;AL TO EXPANSION JOINT SYSTEM PLAN ANCHOR ASSEME_.�- EXPANSION JOIN -IF w144e4AV S'lPt.RiUR RFrROGRAPF -- 1-0 J CL05uP_:E POUR FOR BLQCKQUTS TO BE CONCRETE CLASS "AXLS" AND SSA _L EE INCIDENTAL TO THE UNIT 5 1 D PRICE FOR THE EXPANSION J0;N7 SYSTEM ,,D PE 14 1/2 /o P1 (50/0 @ PIER NCB. 12 • 1— —�_;; C . IU I KE,�"V . I • • • 34 4 S4 #4 E3E`W EEN SEE N -E-- z ' • P F lvEEN f z - C.ONT. i, i v- n Z. ` 1-6 1 ER No. 12 51MIL 5CA L E 11/2 1 I-O" EXPANSION JOI NT, Q ILI H L � 2 �Qi► U; E _GIRDER ..T- IN —PLACE r i 1- R ARF EI EF EXPANSION JOINT NOTES: 1. SEE SPECIAL PROVISIONS FOR MATERIALS AND OTHER REQUIREMENTS NOT SPECIFICALLY CALLED OUT IN THE PLANS. 2. THE MODULAR EXPANSION JOINT SHALL BE DESIGNED FOR AASHTO HS-20 LIVE LOAD PLUS 30% FOR IMPACT. 3. THE EXPANSION JOINT SHALL HAVE A MINIMUM RANGE OF MOVEMENT OF 7'/2 INCHES, MEASURED NORMAL TO THE CENTERLINE OF THE JOINT. 4. THE FOLLOWING MODULAR EXPANSION JOINTS ARE PRE -APPROVED: (1) WABO—MAURER MODULAR EXPANSION JOINT, MODEL NO. D--780. (2) ACME MODULAR EXPANSION JOINT, MSB MODEL NO. 900. 5. THE CONTRACTOR SHALL SUBMIT AN OVERALL PLAN OF THE JOINTS ALONG WITH DETAILS OF THE JOINT ADOPTED, TOGETHER WITH INSTALLATION PROCEDURES AND WATERPROOFING INSTRUCTIONS TO THE ENGINEER FOR REVIEW PRIOR TO FABRICATION AND SUBSEQUENT INSTALLATION. 6. THE CONTRACTOR, IN HIS BID, SHALL ALLOW AT LEAST (:t) DAYS OF ON -THE -JOB -SITE INSTRUCTION FCRTHE CONTRACTOR'S PERSONNEL BY AN AUTHORIZED MANUFACTURER'S REPRESENTATIVE FAMILIAR WITH THE FABRICATION AND INSTALLATION PROCEDURES NEEDED TO OBTAIN A WATERPROOF EXPANSION JOINT. THE r DAYS SHALL BE APPORTIONED AT LEAST AS FOLLOWS: DAY, STAGE I -- PIER 1 INSTALLATION .. DAY` STAGE I -- PIER 12 INSTALLATION k DAY STAGE 11 -- PIER 1 INSTALLATION DAYSTAGE I1 -- PIER 12 INSTALLATION THE EXPANSION JOINT EXTRUSIONS AND NEOPRENE EXPANSION GLANDS SHALL BE CONTINUOUS ACROSS THE ENTIRE BRIDGE. 8. THE NEOPRENE EXPANSION GLANDS SHALL BE MOUNTED SO THAT T1 ;E EXPANSION SEALS MAY BE REMOVED FOR FUTURE MAINTENANCE. 9. TO FACILITATE THE REQUIREMENT THAT THE NEOPRENE EXPANSION JOINT GLANDS BE CONTINUOUS ACROSS THE BRIDGE THEY MAY BE REMOVED AT THE CONTRACTOR'S OPTION FOR ONE (1) WEEK WHILE JOINING THE STAGE I AND STAGE 11 EXTRUSIONS. CONTRACTOR WILL HAVE TO TEMPORARILY SEAL THE EXPANSION JOINT IN STAGE I BRIDGE DURING THIS PERIOD. 10. THE BRIDGE IS TO BE BUILT IN TWO STAGES, STAGE I (SOUTH) AND STAGE 11 (NORTH). THE STAGE I AND STAGE 11 EXPANSION JOINT EXTRUSIONS SHALL BE JOINED IN THE FIELD. SEE SHEET 40. 11. THE EXPANSION JOINT IN STAGE I IS TO BE SET WITH AN "A" DISTANCE OF 7.25 INCHES. STAGE 11 EXTRUSIONS TO MATCH LOCATION OF STAGE I EXTRUSIONS. PROVIDE GAP ADJUSTMENT DEVICES FOR STAGE 11 EXPANSION JOINT FIELD ADJUSTMENTS. THE ASSUMED TEMPERATURE AT JOINT SETTING IS 640F. IF THE TEMPERATURE DIFFERS FROM THIS FIGURE, ADJUST THE EXPANSION JOINT SETTING TO ACCOUNT FOR THIS TEMPERATURE VARIATION. 12. THE EXPANSION JOINT IN STAGE I I SHALL BE CONNECTED AND SET TO THE CORRECT ELEVATIONS AND LOCATION AND MADE CONTINUOUS WITH THE EXPANSION JOINT IN STAGE 1. 13. THE CROSS-SECTION THROUGH THE BRIDGE SHOWS THE SUGGESTED LOCATION OF THE SUPPORT BOXES. IF THE CONTRACTOR ELECTS TO CHANGE THIS ARRANGEMENT THEN THE DISTANCE BETWEEN THE OUTER SUPPORT BOX AND THE CONCRETE TRAFFIC BARRIER SHALL NOT EXCEED 2I-0". THE MINIMUM DISTANCE BETWEEN CENTERLINE SUPPORT BOX AND CENTERLINE GIRDER SHALL NOT BE LESS THAN 1'-0". 14. ALL STEEL HARDWARE, INCLUDING EXTRUSIONS, HEADED STUDS, PLATES ANGLES, ETC. (EXCEPT STAINLESS STEEL PLATES), SHALL BE HOB' DIP GALVANIZED (OR PAINTED WITH 4 MI-LS MINIMUM OF AN INORGANIC ZINC RICH PAINT) AFTER FABRICATION. IF CERTAIN ITEMS CANNOT BE HOT DIP GALVANIZED (SUCH AS SPRINGS, ETC., SINCE IT MIGHT AFFECT THEIR . OPERATION), THE CONTRACTOR SHALL SO STATE 114 HIS SUBMITTAL TO THE ENGINEER AND ANOTHER METHOD OF WEATHERPROOFING SHALL BE PROPOSED IN LIEU OF GALVANIZING. 15. ALL FIELD DAMAGED GALVANIZED SURFACES SHALL BE PAINTED WITH TWO (2) COATS OF AN ORGANIC BASED ZINC RICH PAINT. 16. ALL REINFORCING BARS LOCATED IN EXPANSION JOINT BLOCKOUT TO BE _ EPDXY COATED AND SHALL BE INCLUDED IN THE UNIT BIC PRICE FOR THE EXPANSION JOINT SYSTEM. 4? 17. ALL PLATES AND SHAPES SHALL BE IN ACCORDANCE WITH ASTM A242, ALP ENGINEERS {. EXCEPT STAINLESS STEEL WHICH SHALL BE IN ACCORDANCE A!'-_11RDANCE WITH �ST-IN-PLACE CONCRETE TRAFFIC v�.''K�I�i"`, CIVIL AND STRUCTURAL ENGINEERING CONSULTANTS A3041 UNLESS NOTED OTHERWISE. P! 4 320 ANDOVER PARK EAST I ri, Hit k. f SEATTLE, WASH I NGTON 98188 F LI E R PLATEi 4- PAN SALE: I" _ 1°-V Consulting Engineers and Anusysts 1 REvISE� pE,r� aEcaR� r�aaw�NC ! �'� I 3. 12. 67 Was hington ashington N®. REVISION BY ;APPR.' DATE kFG1ON NO. STATe FEDERAL AID PROJECT NO. SHEET NO. 10 WASH. B R %A _.12 8 8( 2 9-j w to6 L-AN�y� wasy��� WA a og a , � � r� � 11502 0 �FGJSTER�` 0�� j� s•' L``' o Fss���� sae �, ���.....•o' �: � ZONAL C, r CITY OF RENTON DEPARTMENT OF PUBLIC WORKS S.W. CRADY WAY BRIDGE REPLACEMENT EXPANSION JOINT DETAILS DESIGNED - DATE �P I �� FILE _ w:,, h CHECKED T ► SCALE """" _° ELD Boo K_..__.__.__PAGE__.,. — --- — b.� APPROVED_._.__ ____—____.._� _ _._�_.. � SHEE`i'___`�.� _.OF 63 DIRECTOR OF PUBLfC WORKS 7,