Loading...
HomeMy WebLinkAboutTED4001782.44GIRDER G I GIRDER A 5H I M PLATE 11-4" 1/2" MIN. X 11-1011 NP ALL 4 noes} ALL 5EARI NG5 200 K. CAPAC,ITY t BEAR I NG 5EAR1 NG Ci, 5EAR1 NG PIER 1 PIER 2 PIED 10 BEARING PIER 5 FBEARI NG5 ^, KEY FLAN 1/2" MIN. ALL. BEAR I NCB Zoo K. CAPACITY o—� o � t—CL G- F,�EARI NG PIER 11 70P SEARING Ass E M 15L`f ---� - IE 1 "_ 10�" X 1/2 u x 2"_ 0 ►" WITH Co - 1/2" 4" 5T U D5 G 1 "- 2 3/4 " GA. -- _-- SOLE PLATE POT 6EARRI NG It " 1�2"" 1"-011 � �. 1 S DIA. HOLES FOR .1'" DIA. 1/2" NON- GI- RI N K ANCHOR BOL75 G;ZOUT BEE DE7AI L LOWER 11/4► 1 '/4" CHAMFER. (TYPI CAL) Ck, BEAR I NG PIER 12 PARALLEL. TO LONGIT. GRADE 5UPER5T .UC:TURE BEARI NG 5U 5ST RUCI' U RE 1/4 V MARLING SASE PLATE Asa EM I3LY 1 "- 4 �" ,� 1 1/51" x 1 "_ 4"" NOTE.: AT C,ON1" RACTO;z= OPTION A 20 x 91/' 2 $/S" FA5R I C. PAD VV ITH A 20" x 3/3z" x 91/2" VI RG1 N TEFL ON PAD PLUS 5TAI N LE55 57EEL PLATE 0.09" TH10G WNDED TO 60LB PLATE MA,Y BE S1.155TITLUTED FOR POT BEARING. FA5;L I C, PAID TO BE GLUED TO GROUT PAD WITH APPR0\/ED RU55ER CEMENT. THE VIRGIN TEFLON PAD SHALL 5E 1/8""TI-IIGK RECESSED 1/161" INTO A 1/,Z"" THICK STEEL PLATE BONDED TO THE_ 70P OF THE FABRIC PAD. THE STAIN LES5 STEEL SHALL. BE 16 G4A. MIN.) 5EAM WELDED ALL AROUND TO SOLE PLATE ANIP 10 RRM.S. FIN15H. r44 21 BEAR I NG DETAIL AT PI E RS 1 12 NEOPRENE POT 5EARJ NG � H 1� 5EE NOTE 5 - I� T" 5EE NOTE, 1 A �/4"' RECESS ALE : 1 V2 '" 1 "- 0 1" MIN. I r BRASS SEAL - B0770M OF R ECE 55 A i2 49 c 49 49 P1 ER. CAP aw"s qis_ op� p-, a PI ER SECTI CAN ti 13EAR1 NG5 @ PIERS 213,10 11 5CALE : 11/2" -- 1'-0" NON -GUIDED EEC PAN 51 C N F3EAlR I NG Go" H "EADED �TUD5 CS TRANSV. 5PACI NG REGION NO. STATE FEDERAL A!D KO.JET NO. SHEET NO. 10 WASH. B R M —128 8 (2 ) I-40b-3 (635) 83Wi06 PIER bF.AR I NG I DI RECTION OF move MENT 2./Z x 2 /2. 5H I M5 CENTERED 5ELOW OUTER CIRCUMFERENCE OF POT. 4 PER 15RG. 5FACED EQUALLY. 1�,4�r TYP B/2 PI ER 5YMM ETRY 49 HALF PLAN - BASE PLATE (5HOWN FOR 900 K. BEARING) 49 JCALE : 111211 1 -C 11 PIER CAP 4 TOP BE AR.I NCB A55E M SLY 1 70WAR06 CENTER OF BRIDGE _ al SEE TABLE 9 �► 911 i, Dn EL 1 'OVERLAP "1YP 1""MIN. OVERLAP \ TOP OF PI ERR COLUMN EL`"H"5HEE7 1E (L P I E R -bc7om SEAR.( NG A55EM BL'�'" C� ANCHOFk 5OLTS, T P 5EE DETA I L —� C 49 SECTION 49 GROUT 71J5E. -1/2" CO. H ►G H DEN517 'r PLA5TI C iU ESE 51-BALL. F(TN D TO 50TtOM OF PIPE. GROUT FROM THE 15CT70M OF THE PIPE 5E FORE GFZOUTING THE 5EARJNG FL.ATFco BOTTOM OF RECE 55� PARALLEL TO LONG I TU D I N AL GRADE -3/4j' EMBEDDED 5EARI NG PLATE MUV E M E NT '/E�"I THICK PTFE PAD RECESSED INTO P1 TON 111611 1"0 A 52 S 5OLT W/H EAV�r HEX . NUT 4 LOC WAS ER SNUG T1GHT. TOP OF E5A5 E PLATE. 5LACIK P I PE 3" c 5T D. BAR 5 z x 1/2 WA►5HER TACK WELD ALPHA ENGINEERS INC. CIVIL AND STRUCTURAL ENGINEERING CONSULTANTS 320 ANDOVER PARK EAST ANCHOR 50L7 OETA1 L SEATTLE, WASHINGTON 98188 BEARING NOTES: 1. BEARINGS AT PIERS 1, 2,3 AND 10, 11, 12 SHALL HAVE THE FOLLOWING MINIMUM LOAD CAPACITIES AS SHOWN IN THE TABLES: PI ER PREDICTED D15TANCE NO, BEARI NG5 VERT. LOAD, K I P5 NO. MOVEMENT "trt►' REC' a ST S E DL L L + I TC�iAL AGE � SAC 1 - �' 411 21/4 1I 15/411 3 4 130 Gro 19G 200 12 + 21/4 - CZ 1/411 15/4 It 5 4 101 r2a 1 Cc7 200 STAGE I 5EARI NG LOANS PIER NCB. PREDICTED MOVEMENT DISTANCE "a" LOAD KI PS BCBARING NUMBER > LOAD5 + 2„ - 54 "" DL 92 4-05 L.L + I 154 17Z TOTAL 54G 577 3 10 + 1 2 „ -41/2 11/4" DL 4 27 445 LL+ I 1Co1 150 TOTAL � 588 12028 11 + 21) -5�'4" �► 1 1/2 D L 392 4-05 LL+ I 154 172 TOTAL 54rc 577 67AGE I + II + M BEARING L0AD5 PI ER NC PREDICTED M0VEMENT 0157ASCE "a'" LOAD KIPS BEARING Nl.UM5ER LCA05 E) 2 + 2," , 5 5/4, 1 �/ "► DL 421 477 G55 5119 LL+ I 45 2 39 178 150 TOTALT 1+ B 3ro 519 3 10 1/ a t 1 2 "1 I _4/2 1114" DL 45G 4-95 G 90 54-7 LL + I 47 249 1 SCo lee 7C77AL 4S3 744 S?F.� BBS 11 2 " - 5 5/4!' 11/2►" DL 395 451 032 515 L L+ I 4-5 259 175 160 TOTAL 440 Co90 510 495 fJES I G N BEARING CAPAC 1Tt'` ro4O K ' 90C� K 9oC� K � K NOTE5.1A. 50TTOM 5EARI NG PLATE 23 x 1 �/4►' x 23" ( K), 2�0 "' � 1 �/S" x 2�►' (goo K). 15. DUE TO DI F FERENT IAL 5ETTLE M E N'T of 2 f ►ETVY EE N PIERS, 15F AR I NG LOADSCAN VARY 5 1 20 KIPS , A � (�)) 3. "H" VARIES WITH MANUFACTURER OF BEARING. SPENCER BEARINGS ARE SHOWN. CONTRAC- TOR IS TO COORDINATE WITH SUPPLIER OF BEARINGS AND ENGINEER TO FINALIZE THE DEPTH "H", PRIOR TO REVIEW OF REINFORCEMENT SCHEDULES FOR PIERS. 17 r4491 4. BEARING SUPPLIER/MANUFACTURER IS TO SIZE THE SOLE PLATE IN PIER CAP.TO TAKE ACCOUNT OF PREDICATED MOVEMENT DUE TO SHRINKAGE, CREEP AND TEMPERATURE. ALLOWABLE BEAR- ING PRESSURE 1400 PSI. MAX. 5 BOTTOM BEARING PLATE AS SHOWN IS DESIGNED FOR 1400 PSI. MAX. PRESSURE. PLATE THICKNESS MAY VARY DEPENDING ON SIZE OF POT BEARING, IF OTHER THAN THAT SHOWN. 6. ALL BEARINGS ARE TO BE INSTALLED IN A HORIZONTAL PLANE. 7. GROUT BEARING PLATES AFTER 2 1/2 INCH SQUARE SHIMS ARE INSTALLED TO PROPER ELEVA- TION AND PRIOR TO POURING PIER CAPS OR PLACING END SPAN GIRDERS. 9. ALL BEARINGS TO HAVE A ROTATION CAPACITY OF AT LEAST .015 RADIANS IN ANY DIRECTION. 10. ALL PLATES AND BEARINGS SHALL BE HOT DIP GALVANIZED TO 2.0 OZ/SF IN ACCORDANCE WITH ASTM A 153. ANCHOR BOLTS SHALL BE HOT DIP GALVANIZED TO 1 1/2 OZ/SF IN ACCORDANCE WITH ASTM A 123. FLAME METALLIZING USING ZINC MAY BE SUBSTITUTED IN LIEU OF HOT DIP GALVANIZING AND SHALL BE APPLIED IN ACCORDANCE WITH THE AMERICAN WELDING SOCIETY AWS C2.2. MINIMUM THICKNESS OF ZINC SPELTER FOR METALLIZING SHALL BE 8 MILS EXTERIOR FACES, 4 BAILS INTERIOR FACES. THE METHWOF APPLICATION SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW PRIOR TO FABRICATION. 11. THE EMBEDDED BEARING PLATES IN THE PIER CAPS SHALL BE SECURELY TIED IN SUCH A MANNER THAT THEY WI'LL NOT BE DISPLACED DURING THE INITIAL PIER CAP POUR. PROVIDE ENGINEER WITH TIE DOWN DETAILS PRIOR TO CONSTRUCTION. 12. EACH EXPANSION BEARING AT PIERS 2, 3, 10 AND 11 IN STAGE I ONLY, SHALL BE PROVIDED WITH A TIE DOWN SYSTEM TO RESIST 10% OF THE SUPERSTRUCTURE DEAD LOAD AS A TENSION FORCE. n of SY 10 ,�a;?' CITY OF RENTON y0 DEPARTMENT OF PUBLIC WORKS 19 • t e t S.W. GRADY WAY BRIDGE Of /3TE REPLACEMENT NAL e_ ,L R!`ARIN(� f1F'TAII SCALE : 1 v2r� �, 11..&I -_ - DESIGN R MPANY 2 REVISED PER RECORD 01044, 3.12. E7 DRAWN. RECORD DRAWING Consulting Engineers and Analysts RQV. jdtd ro, Dai. AJb�rzs 2 i 8 5-I1-84 C!iECICE Seattle, Washington rNO. REVISION BY APPR. DATE APPROV SUPERIOR REPROGRAPHICS 71 A *.,"AN N E O MAR 2 8 2003