Loading...
HomeMy WebLinkAboutTED4001791.5A Portiori Of The S.E. 1/4 Of Suc. 25, T wp. 23 N., Rge. 5 E ., W.M. Aral iA Portion Of Tni S.W. 11/4 Of Sec. 3n, Two. 23 N., Rgi.. 4 E., W.M. LEGEND (,.,./) EX1:VPin9 Spot E/evation /5_3 Or 15x 3 Pr000sed Spot E/evation (Fin,'shed G1 R Rid96, Line yreo L2 Por�dirry -__ -_ Stop Sign, Type /?/-/Pcr M.U.T. C.D. 115.5' i SCALE : I" = 30' CONTOUR INTERVAL = 2,' DATUM : CITY OF RENTON B. M. = Chiseled Square On S.W. Corner Of Conc. Base, Of Street Light Along The East Side Of Lind Ave., 500' k North Of S.W. 39th St. EI. = 16.78, City 7f Renton, No. 1038. T.B.AA. = So. Rim 9f Aron. Case At Ir,t(.rsectir)n Of Lind Avt:. 19A S.W. 39th St. FI. = 16.39 7XP-6 - 0 o • 1' e/ /Z- = /0.810l,/5" 6 a,/A NOTES: I. Contractor to verify invert elevations and catch basin locations of existing storm drain system prior to construction. Notify Engineer of any discrepancies. 2. See sheet I for Typical Dimension Details. S.W 117stall 30' Driveway Seclion. Remove Ex1:5M?9 Curb 54 Gutter As 9eq'd. i /r�sta// Sloo Sign E. _ / /. , /.- � uvr;,\ C = C"�017c/ Cars TYPICAL DIMENSION DETAIL Not To Scale 39th CO/7C, Sio'ewp//r /6 w j---• 2v' /4' /=or Lot /2.5' For Lot 3 I I II o w ___ mo —S.D. `�S�a/t CCC -- N m -�40 5 116th , SHEET__. INDEX L GAON CRES 11RAC IP S DECRi"ION TRA K SHEEP No. � SHEET INDEX(, VICINITY MAP, GENERAL NOTES, GRADING STORM W DRAINAGE PLAN > 3 ; Y GRADING 81 STORM DRAINAGE PLAN SW 38th ST>` GRADING a STORM J > DRAINAGE PLAN SITE SW 43rd DETAILS � R-1791�5 00 §if 0x /) a' To Grade As 1,?e,7 a" 4pp c- o ve / M� s.v , > ;j. /o.h I•E - Core lJri%/ COnrJeCtiOn To S. D. d/h: Confrac}or To //erify L or anion 0 /rrvcrf Prior To Consfraction F4 �O13`S� iU-7� Dafe nciocore x. /nsla// 4" Minus Sig7s Oaf Prop. Side Quarry S,oa//s o/k (ryP j-`16-'x 5'x /' Thic/r lMin.) Cross Bucks S/oloe New 51'0(ew0/k REVISED TO CONFORM To lWalc. ; Grade Of RVbber /f/R Crossing TO FIELD RECORDS �ry�. ear/ s;des� DATE 10 • Z0' a� /7,,fa// Ash ,G/! 5,deWa/!r APPROVED Traneifio ('Tyo.) a W 27th ET .: sW ST. 0 - Z a J SW 34th ST o 167 � f 0 M 39th ST a> Ia SW.4i•!' ST —r. ST VICINITY MAP Not To Scale GENERAL NOTES 1. All work and materials shall be In accordance with City of Renton Standards and Specifications and 1984 Standard Specifications for Road, Bridge and Municipal Construction (State of Washington). 2. Existing utility locations are approximate only. It shall be the Contractors responsibility to verify locations and Inverts prior to construction. For utility locations in City of Renton call 1-800-424-5555. 3. All dewatering required shall be done in accordance with Section 7-11.3(01) 1984 Standard Specifications for Road, Bridge and Municipal Construction (State of Washington). 4. Unless otherwise noted, storm drain pipe shall be rubber gasketed concrete (ASTM C-14-II or ASTM C-76-11) galvanized steel with asphalt treatment 1 or better, helically corrugated metal pipe with watertight connecting bands; or equal. 5. Pipe excavation, backfill and bedding shall conform to Section 7-04 of the 1984 Standard Specifications for Road, Bridge and Municipal Construction (State of Washington). Unless shown otherwise, bedding shall be sand or pea -gravel, in accordance with Section 9-30.7A of the 1984 Standard Specifications for Road, Bridge and Municipal Construction (State of Washington). Remaining backfill and compaction shall be in accordance with Section 7-04.3(3) of the 1984 Standard Specifications. Water settling will not be allowed. Compact trench backfill to 95%. 6. A copy of the approved plans must be on the job site whenever construction is in progress. 7. All disturbed areas not receiving landscaping shall be hydroseeded with rye grass. Seeding shall be done using an approved hydroseeder or as otherwise approved by the City of Renton. 8. If the Contractor elects to use dissimilar metals within the detention system, it shall be his responsibility to Provide adequate electrolitic insulation. 9. The storm drainage system shall be constructed according to the approved plans. Any deviation from the approved plans will require written approval from the City of Renton. 10. Soil compaction shall be in accordance with ASTM D-1557 (Modified Proctor). 11. The Contractor shall be responsible for cleaning and flushing all storm drains prior to acceptance by the owner. 12. All required storm water retention/detention facilities must be constructed and in operation prior to paving and building construction unless otherwise approved by the City of Renton. 13. Galvanized steel pipe utilized as detention facilities shall have asphalt treatment #1 or better inside and outside. 14. All R/D facilities will be installed and in operation prior to or in conjunction with all construction activity unless that activity exceeds the capacity and intent of the erosion/sedimentation control facilities or unless otherwise approved by the City of Renton. 15. All rock shall conform to Section 9-13 of the 1980 State of Washington Standard Specifications. Unless shown otherwise, rock aggregate for erosion protection shall be placed to a depth of 1 foot and graded as fo l lows: 1 /2"-2tt, 10%-20%; 2"-411, 20%-40%; 4"-811, 40%-70%. 16. Core Drill Connections To Ail Existing Manholes And Pipes. Z 4 101— a 2 Z O ..._ v U 2 a CC ;i LLI Q c� CL U) Cr O F-; 0 cr LLJ Cf) cts •�'�' Z Z 0 UJ M Q p it m C1 o I W LL j O I } U k i Josh 230-01-850 DESIGNED L.R.I. DRAWN H.W./R.J.B. It CHECKED J.W.N,/J.11. �c �o �z t� m n rD CD cz SCANNED MAR 2 8 ZOu�