Loading...
HomeMy WebLinkAboutTED4001800.5O� A,O C? v yPI- -a 4cp0,.0iikN O TE.= 33. 18 IE•o 26.7$(I =N) I.E.= 27.46(,z"-e) I.E. z(fi.70l►8"-SW) i 6.5' 177 I TFO - 4ra - -F. E. = 35. 4•S C E3`10 ( TYPE IL - 48") ( e . = 2 7.83( 12'=w�T E� o \ .O m O� T. P I T •30 12 CONIC & C.W. - CSEE DE TA L) p G XS C \ I� N) ' E 2 I C RE MOVE I� 6. 5 ) RESET Tp 26,7 CONNECT NEVJ CONDUIT TO EXST TUNCTION BOX 4 SPLICE CABLES. SEE DETAIL. - PRAPER-ry I .I= ��a'• X 2.' DUMMY JOI 1 6.3 30' MATCH EXIST• ASPHALT I EX1S7• ASPF}ALT EAST CURB, GUTTER �_ WALK. j7 O s3•loc 1'g,LF- SD 0 1WL.E_T E' �.2'% E = 5' �p O S /. 00 f7. 12% Q 3S.9q INL.I-THI0)T-E_ O 7LF T/4% IE _ Z3-" (VANEp GRATE) -8"SD @ /5.63% 39• )(o T T T 40 N t/ 30' RIVE WAY S E E 162 0 r .2 0% T IL-0 F I2-CMPIli�I ° - - PPI I U o G.V. FND. REbAR E CAP y1 OI/ IJALK STRt P, IF P.Ny, . (D TE.= s4.)5 50. a5 (12''- E� u !•E.= s1. is (8"-W) C lS OA�SOLID L)D) (E.=49.95(12'--w� (RENN) I 2 NTY) N. E. 4-8 TI I S.E. 7Co_L� ST --� d. - o-T --- Y �.° T R 19 3 t 00 - - .4LI-ci�o 1 ^'? ED E 0 - EXIST, SPHAL_ ro h�z� 12" C,v1. C�Ir 3 uMDER F20' DRI E SEE ET:0 L1GH oLE Z2 - -- P--- - SEE GRADING, PLAN FOR GRAPES AS AT RIVE.,SEE SITE PLAN 4?' VDI D WALK TU CTI z+76 C S SEE DR4tNACGE PLAN Fok STOF�M UR-AINS AND CATCH OASINS Oil SITE � FOPS DET/AILS � IVOTLS, k0T C •• C P P M,E A Ns s l--1oo T (4 Vi,/A L L CORR L) Gr/AT E D PL AST I C PIPE PER CITY OF REIVTON SPECIFICATIONS,,L f�1 ATcII EAST C\./ (DIM = NEW CW) EAT CONC b• '1 r- PROPERTY LINE \ \ SLQPE- 0.02 FT/FT Ilk ii/ ° .° � v DRtvEWAY Gtit•al�� CEMENT CONCRETE DRIVEWAY 5• THICK, SECTION A -A DRIVE WAY DETAIL in N.T.S. R�W b • J 7. L 31.4 FILL W/GRAN L GLASS B I I 'a EXIST. GRADE 0 Co t-iC. WALK V1_ KI NG. CO. STD DWG. N0JB - CURb s GU- TI✓R SEE DETAIL_ SIDEWALK SECTION (a I"= S' ( H0RIZ) I" 2- (V E RT.) r , - I- . r-- C U r\1_J NEW CONC WALK CONIC WALK MATCH DETAIL I'' = 5 ° 4-"TO 43" RIP- RAP MORTARED /N PLACE 7 CO J t / 2 s 2 E1(Si DJrcy EXTEhlD RIP -RAP 8' UP DI1-GH L INC- -HEADWALL DETAIL 1'° = 2' 1/4' EDGED GROOVE V S O.Ot F111"TI K NOTE TOP OF GUKF3 6D DRIVEWAYS. CEMENT CONCRETE CURB GUTTER. - EXST GROUI,/D // / O S CAL,' :. 0' ASPH RAMP- MATCr EhST GRADE 5L-F - 12"CP 2 HEADWALL, IE= 78.0011ATCH EXST -- -- DITCH GRADE) RIP-R M TAR IN PLACE. CB "OL3 (SO'Li D L I(�J� I-Yr'� 17-4t3) T E 0.99 s C = `" ) 74.44 O 75.94C$"-W) AS-SU/LT"TOP ELEVATIONSAND 76.54 (12 "-E) INVERTS FOR STORM 77• 94C8"-E) AS -BUILT" ✓UNC7ION>6OX EASTERN d,_ LIGHT POL E AND DRIVEWAY L OC4 ROWS MH. F-ND• RE-bAR CAP .13 � § C� R ,A,, #4 TS `° ARE SASED ON AN ACTUAL SURVEY W �1 PERFORWD 8Y ME OR UNDER MY DIRECTION L-ASPHALT - SEE , �" 4 ^� AS�-BUIL M REPRESEYr ACTU,4L L OCAT/O.NS c r a 1 I -T U AT o-._ ABOVE ,I ROUND APPU TENANCES ONL Y S I -I >✓ PL3 AN TAT __1O F 11- > 2" S I R E t. _ -1- LIGHT C ON D. �,� F�F CUR A ON 91 NoT CoN �44 FOR APFi OVAL UY kvol Z-1 y-qo S ToRtl WA TER V T I LIT/ FUiG0W.4Zk4ED FOR APPR0W L BN TRAN5P0,3TAv0Ar OIV. STRUCT� 0 R� r,�Ofj PE # 25485 1 e LM 'F t i SELF STORAGE EXIT 7 v GENERAL NOTES (I L L U M I KAT ION) 1. All work shall be in accordance with the City of Renton Standard Specifications and these plans. 2. The locations of features shown are approximate and shall be verified in the field by the contractor as necessary. 3. Install all street lighting materials shown on the plans, except as noted. All materials shall be new and of the best available grade or quality, except as noted. 4. The contractor shall submit a request to the City of Renton for materials approval at the earliest possible date. 5. All work shall be consistent with utility agency requirements. The contractor shall contact all pertinent utility agencies 48 hours before commencing work, and shall coordinate the work with the utilities throughout the project. o. The contractor shall be responsible for any damage to existing utilities. The contractor shall notify the affected utility company and the City immediately upon damage. 7. The contractor shall notify the City of Renton Traffic Engineering Division (277-5570) for inspection purposes, 24 hours before commencing work. No work shall be covered until it has been examined by the engineer. 8. Light pole shall be spun aluminum davit style (8' arm) light standard with 250 watt h.p. sodium vapor luminaire and lamp. Mounting Height 30'. Pole number shall be 3716F. 9. Junction boxes shall be Type "I" with concrete pad. See details. 10. Conduit shall be 2" PVC, SCH 40 with 2 #8XLPE USE-CU. CHECKED FOR COP.;►'LIANCE TO CITY STAtzjr1 DS ly �r/,•� r Date 2-/S • .9 1= Date L -,/r3 - j l Dz, to 7- Y(5- RL-COMIAENDED FOR APPROVAL Bar ha C01�`Z f :t 1 c� •1 • Z k' 7 :3/1v SITE DEVELOPMENT SERVICES 310 208TH ST. S.L. BOTHELL, NA. 98012 481-9687 1-3)- 9I 1{cvi'sed per• C4. Commen%s I 1-10-91 Cif °-F Re.n_�on .r1,Si00S REV DATE DESCRIPTION PROJECT MANAGER ARCHITECT/ C Ai!_IK IC C❑ DATE DRAWN BY DATE CHECKED BY / / r R - P IGNT OF \MAY IMPROVEMENI-T PLAN r Ruhl-Parr & Associates Architects Planners . A Processional Service Corporation 3625 132nd Ave. S.E. Suite 100 (206) 644-4000 Bellevue, WA 98006-1399 FAX (206) 643-4115 DRAWING TITLE DRAWING NO �O ,JOB N MBER PRINT DATE 88-730 6ZANnE0 MAR 2 8 2%3 -