Loading...
HomeMy WebLinkAboutTED4001801.12ABERDEEN AVE. N.E. - PROPOSED ROAD IMPROVEMENTS AS A PART OF THE SUNSET s GARDENS APTARTMENT PROJECT STA. 0+74.48 1 3 53' RT. PC STA. I+00.41 �. Ji PROPOSED 12" SD ,Jiy STA. 0+64.9 CB9AND 12"SD TO CB 8-- WILL NOT BE REQUIRED - CB 8 (EXISTING) TO REMAIN. d PROVIDE ASPHALT RAMP FOR PEDESTRIAN ACCESS AND DELIVERY OF MAIL. /B =DEL. EX MAILBO B SEC. 8, TWP.- 23, RGE. 5 E. CB 9 AS PROPOSED ON SHEET C7 OF 17 FOR THE SUNSET GARDEN PLANS WILL NOT BE REQUIRED. DIRECT DRAINAGE SOUTHERLY, VIA ASPHALT THICKENED EDGE TO THE EXISTING CB. ASPHALT THICKENED EDGE TAPER TO MATCH (STING DRIVEWAY STA. 61+17.00 N.E. SiJNSET TAPER TO MEET EXISTING ASPHALT. _ _ = STA. 0+00 ASEnL)EEN AVE. N.E, DIRECT DRAINAGE AS SHOWN. ST. LT. BOX 206.7 205.9 ti EL. 2 .2 EL. 20 EX. PP EL 206.; EX. TEL. PEDESTAL A 1 11 h —n " r'1 0S" ���L. 204.1 suivsc or 5' MIN. 1.5' 1 0.4' T EXISTING ASPHALT SECTION B-B ASPHALT THICKENED EDGE NO SCALE c • � O ° 202.5 I ° , r it Co"" G O EL. 201.5 UTTER 8 S/pFwA I,/ ' 20' CITY OF RENTON DATUN BENCHMARK: TOP OF CC MON. AT THE INTERSEC- OF N.E. 12 th ST. AND ABERDEEN AVE. EL 280. 10" 2 I/ 2" �5"� 2 li L" DIRECTOR OF PUBLIC WORKS I :ANNEO MAR 2 8 Z003 7� 2