HomeMy WebLinkAboutTED4001801.12ABERDEEN
AVE. N.E. -
PROPOSED ROAD IMPROVEMENTS
AS A PART OF THE SUNSET s
GARDENS APTARTMENT PROJECT
STA. 0+74.48
1 3 53' RT. PC
STA. I+00.41 �.
Ji
PROPOSED 12" SD ,Jiy STA. 0+64.9
CB9AND 12"SD TO CB 8--
WILL NOT BE REQUIRED -
CB 8 (EXISTING) TO REMAIN.
d
PROVIDE ASPHALT RAMP
FOR PEDESTRIAN ACCESS
AND DELIVERY OF MAIL.
/B
=DEL.
EX MAILBO
B
SEC. 8, TWP.- 23, RGE. 5 E.
CB 9 AS PROPOSED ON SHEET
C7 OF 17 FOR THE SUNSET GARDEN
PLANS WILL NOT BE REQUIRED.
DIRECT DRAINAGE SOUTHERLY, VIA
ASPHALT THICKENED EDGE TO THE
EXISTING CB.
ASPHALT THICKENED EDGE
TAPER TO MATCH
(STING DRIVEWAY
STA. 61+17.00 N.E. SiJNSET
TAPER TO MEET
EXISTING
ASPHALT.
_ _ = STA. 0+00 ASEnL)EEN AVE. N.E,
DIRECT DRAINAGE
AS SHOWN.
ST. LT. BOX
206.7 205.9
ti EL. 2 .2
EL. 20
EX. PP
EL 206.;
EX. TEL.
PEDESTAL
A
1 11 h —n " r'1 0S"
���L.
204.1
suivsc or
5' MIN.
1.5'
1 0.4'
T
EXISTING ASPHALT
SECTION B-B
ASPHALT THICKENED EDGE
NO SCALE
c
•
� O
° 202.5 I ° ,
r it Co"" G O
EL. 201.5 UTTER 8 S/pFwA
I,/ ' 20'
CITY OF RENTON DATUN
BENCHMARK: TOP OF CC
MON. AT THE INTERSEC-
OF N.E. 12 th ST. AND
ABERDEEN AVE. EL 280.
10"
2 I/ 2" �5"� 2 li L"
DIRECTOR OF PUBLIC WORKS I
:ANNEO MAR 2 8 Z003 7� 2