Pipe
Number
Upstream
Invert
Downstream
invert
1
196.00
195.76
2
195.76
195.35
3
MIN 195.59
195.35
4
195.35
194.55
5
194.55
194.01
6
MIN 194.07
194.01
7
194.01
193.10
:
Nt
LIJ
6" PLt C: AT: ONAT
e S 2 XT
W �.
.>.
:
1 (ABANpON�U � r1/ �
:
er
n l
h.
V j
1 T� R �. 5 W
r T.
N� W A
:
,
,
P
.t
o
. y � Nt p
Y
,
���, ��i� N NT'
N � DiZA ��• �:.
CLEAN OUT
NUMBER
RIM
ELEVATION
INVERT
ELEVATION
CO-1
199.1
195.76
CO-2
198.5
194.55
I >- L 1 - 1 1' _..LAG /
SH, C_- 2
, � /' (-V
r
NEW MH - (11�_
1V U
mooW/SOLID LC( -KING
Q �s
LID MARKED "DRAIN"
C2C�M�1 �DWS . 85
GB- I� TYPE 2 4a" L
121M
(PREVIOUSLY I�Pt_AC-ED�
POSED
CLASS OOM BLDG.
�F
1C)909
NEW Mk-7
TYPE 2 4„
RIM ► 9'S. I
1':)5. 14 �.
kqmi
NEW GA-1
W1FTER
3 LF co" PvL
'MIN, 2�o
J
EXIST 8"U
MATCHLINE
SEE SHEET C-2
GONN1<GT NEW
GAS S�RV ICI✓
To EXIST 11/11"
GAS . RF_ L06A\71
AS RE_0_UIRF_0 Tb
G'I-LAF, NEW 1LLDG
40
GENERAL NOTES
1. REPAIR EXISTING PAVEMENT,
LANDSCAPING, ETC, AFTER
INSTALLATION OF UTILITIES.
2. DATUM - CITY OF RENTON, USGS.
BENCHMARK USED IS CHISLED O
BK 11' CW EAST END CW SE
COR. ENTRANCE TO VICTORIA PK.
& TALBOT RD. S.
BENCHMARK ELEV. 134.92
3. RENTON STANDARD CLEARANCES:
WATER & SEWER - 10' HORIZ.,
18' VERT.
WATER & STORM - 7.5' HORIZ.,
12' VERT.
STORM & SEWER - 5' HORIZ.,
ma;eeal
Falk
KIN
Rese"O"
.;: TA L B
I ELEMZ
VICINITY MAP
NOT TO SCALE
LEGEND:
A G.O. CLEANOUT, SEE DETAIL, SH. C-
TYPICAL OF (10)
12' VERT,
DOWNSPOUT SEE DETAIL, SH. C-
0 PS TYPICAL OF (12)
STORM DRAINAGE NOTES
1.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT
90% otherwise per ASTM D-1557-70. Pea gravel
ACTIVITY OCCURS, A PRECONSTRUCTION
bedding shall be 6' over and under PVC pipe.
MEETING MUST BE HELD WITH THE CITY OF
RENTON DEPARTMENT OF PUBLIC WORKS,
10.
Galvanized steel pipe and aluminized steel pipe for
DESIGN ENGINEER.
all drainage facilities shall have asphalt treatment # 1
or better inside and outside.
2.
All construction shall be in accordance with the
Latest Edition of 'Standard Specifications for Road,
11.
Structures shall not be permitted within 10 feet of
Bridge and Municipal Construction' prepared by
the spring line of any storm drainage pipe, or 15 feet
WSDOT, and the American Public Works Association
from the top of any channel bank.
(AWWA), as adpoted by the City of Renton
Department of Public Works.
12.
All catch basin grates shall be depressed 0.10 feet
below pavement level.
3.
The storm drainage system shall be constructed
according to the approved plans which are on file in
13.
Open cut road crossings through existing public
the Department of Public Works. Any deviation from
right-of-way will not be allowed unless specifically
the approved plans will require written approval from
approved by City of Renton Department of Public
the City of Renton Department of Public Works,
Works, Design Engineer.
Design Engineer or Storm Water Utility.
14.
Rock for erosion protection of roadside ditches,
4.
A copy of these approved plans must be on the job
where required, shall be of sound quarry rock
site whenever construction is in progress.
placed to a depth of 1 foot and must meet the
following specifications: 4'-8'/40%-70% passing; 2'-4'
5.
Datum shall be USGS unless otherwise approved by
rock/30%-40% passing; and 2' rock/10%-20%
City of Renton Department of Public Works.
passing.
Reference benchmark and elevation are noted on
the plans.
15.
All building downspouts and footing drains shall be
6. All sedimentation/erosion facilities must be in
operation prior to clearing and building construction,
and they must be satisfactorily maintained until
construction is completed and the potential for on -
site erosion has passed.
7. All retention/detention facilities must be installed and
inoperation prior to or in conjunction with all
construction activity unless otherwise approved by
the Department of Public Works, Storm Water Utility.
8. Grass seed may be applied by hydroseeding. The
grass seed mixture, other than City of Renton
approved standard mixes, shall be submitted by a
Landscape Architect and approved by the
Department of Public Works, Storm Water Utility.
9. All pipe and appurtenances shall be laid on a
properly prepared foundation in accordance with
Section 7-02.3(1) of the current State of Washington
Standard Specification for Road and Bridge
Construction. This shall include necessary leveling
of the trench bottom or the top of the foundation
material as well as placement and compaction of
required bedding material to uniform grade so that
the entire length of the pipe will be supported on a
uniformly dense unyielding base. All pipe bedding
shall be APWA Class 'C', with the exception of PVC
pipe. All trench backfill shall be compacted to
minimum 95% for pavement and structural fill and
connected to the storm drainage system, unless
approved by the Department of Public Works,
Design Engineer or Storm Water Utility. An
accurately dimensioned Certified as built drawing of
this drainage system will be submitted to the City of
Renton upon completion.
16 Issuance of the Building or Construction Permit by
the City of Renton does not relieve the owner of the
continuing legal obligation and/or liability connected
with storm surface water disposition. Further, the
City of Renton does not accept any obligation for
the proper funcitoning and maintenance of the
system provided during construction.
17. The Contractor shall be responsible for providing
adequate safeguard, safety devices, protective
equipment, flaggers, and any other needed actions
to protect property in connection with the
performance of work covered by the contract. Any
work within the traveled right-of-way that may
interrupt normal traffic flow shall require an approved
traffic control plan by the Traffic Engineering Division
of the Department of Public Works. All sections of
the WSDOT Standard Specifications 1-07-23, Traffic
Control, shall apply.
18. Special drainage measures will be required if the
project location is within the aquifer protection area.
19. The Contractor shall locate and protect all existing
utilities during construction and notify owners of all
affected underground utilities for field locating their
facilities at least 48 hours prior to construction.
The one -call number is 1-800-424-5555.
SCANNLU LIAR 2 8 2003
TITLE
RENTON
SCHOOL DISTRICT 403
IMPROVEMENTS AT
TALBOT HILL
TIFFANY PARK
ELEMENTARY SCHOOLS
C . S
9690
EAefts till -71-303 \
PROJECT NUMBER
90030
STAMPS
DWG f' I?'F RG 3 2`I 9 I
CHK AMS
REV REVISION NO. 1 5-2-91
REVISION N0.2 5-17-91
CONTENTS
TALBOT HILL
STORM DRAINAGE &
SANITARY SEWER
C
POR APPROVAL
BYa. S/3/19/
PL 141V RE VI16-W
HLGOMMENDED
FOR APPF,,OVAL
BY _ - T- *iz►�
T-iQ.4N5POiPT.4 r/0,A/
SHEET
.30 1
4.5-
_ C 1
'T6'0-44o - too T
J L J L J L
J L
J L