Loading...
HomeMy WebLinkAboutTED4001807.2r I r a /i STORM WATER DRAINAGE NOTE$ 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY 11. Structures shall not be permitted within 10 feet of OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH the spring line of any storm drainage pipe, or 15 feet THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN from the top of any channel bank. ENGINEER. 12. All catch basin grates shall be depressed 0.10 feet 2. All construction shall be in accordance with the below pavement level. Latest Edition of "Standard Specifications for Road, Bridge and Municipal Construction" prepared by W.S.D.O.T., and the American Public Works Association 13. Open cut road crossings thru existing public right-of- (APWA), as adopted by the City of Renton Department -of way will not be allowed unless specifically approved Public Works. by City of Renton Dept. of Public Works, Design Engineer. 3. The storm drainage system shalt be constructed according to the approved plans which are on file in 14. Rock for erosion protection of roadside ditches, where the Department of Public Works. Any deviation from required, shalt be of sound quarry rock placed to a the approved plans will require written approval from depth of 1 foot and must meet the following the City of Renton Department of Public Works, Design specifications: 0-81+/40%-70% passing; 2"-4" rock/30%- Engineer or Storm Water Utility . 40% passing; and -2" rock/10%-20% passing. 4. A copy of these approved plans must be on the job site 15. Ail building downspouts and footing drains shalt be whenever construction is in progress. connected to the storm drainage system, unless approved by the Dept. of Public Works, Design Engineer or Storm Water Utility. M accurately dimensioned 5. Datum shaft be U.S.G.S. unless otherwise approved by Certified as built drawing of this drainage system City of Renton Department of Public Works. Reference wilt be submitted to the City of Renton upon benchmark and elevation are noted on the plans. completion. 6. Alt sedimentation/erosion facilities must be in 16. Issuance of the Building or Construction Permit by the operation prior to clearing and building construction, City of Renton does not relieve the owner of the and they must be satisfactorily maintained until continuing legal obligation and/or liability connected construction is completed and the potential for on- with storm surface water disposition. Further, the site erosion has passed. City of Renton does not accept any obligation for the proper functioning and maintenance of the system 1 provided during construction. 7. All retention/detention facilities must be installed and in operation prior to or in conjunction with sit construction activity unless otherwise approved by the 17. The Contractor shall be responsible for providing Department of Public Works, Storm Water Utility. adequate safeguard, safety devices, protective equipment, 41aggers, and any other needed actions to protect the life health, and safety of the public, and 8. Grass seed may be applied by hydroseeding. The grass to protect property in connection with the performance seed (mixture, other than City of Renton approved of work covered by the contract. Any work within the standard mixes, shalt be submitted by a landscape traveled right-of-way that may interrupt normal Architect and approved by the Dept. of Public Works, traffic flow shalt require an approved -traffic control Storm Water Utility. plan by the Traffic Engineering Div. of the Dept. of Public Works. All sections of the W.S.D.O.T. Standard Specifications 1-07.23, Traffic Control, shalt apply. 9. Alt pipe and appurtenances shall be laid on a property prepared foundation in accordance with 18. Special .drainage measures will be required if the Section 7-02.30) of the current State of Washington project location is within the aquifer protection Standard Specification for Road and Bridge area. Construction. This shalt include necessary leveling of the trench bottom or the top of the foundation material as welt as placement and compaction of required bedding material to uniform grade so that the entire length of the pipe will be supported on a uniformly dense unyielding base. ALL pipe bedding shall be APWA Class 'C', with the exception of PVC pipe. ALL trench backfitl shall be compacted to minimum 95% for pavement and structural fill and 90% otherwise per ASTM D-1557.70. Pea gravel bedding shalt be 6" over and under P.V.C. pipe. 10. Galvanized steel pipe and aluminized steel pipe for all drainage facilities shall have asphalt treatment 01 or better inside and outside. T&0 oft -OCK/Nr CRATE P,AISE OAFFLE TO THE BOTTOM OP L10 AS SHOWN FLOW DIFFUSER OIL RETENTION;' (1 arr1 r MArr1 r INLET OUTLET 1,570 GALLON CAPACITY AT 4'-0" WATER LEVEL PLAN e - CATCH SAS/A/ * 2 'TYPE .TT, 70 Ql w/LIxKI �� j �IZANI E � 1v17��1� I (CONE. ) J /. E: /e o / PLAN TYPE SECTION "A -A" O E TA / [_ = CA TC H )3ASIN Z, TYPE Zr 7 SCALES C#2/"=0,CV) .0 !8'r S0 ZZ/CCONC) (CONNG. D 11 RECOMMLNAb FOR APPROVAL STD M W,4TER C/TIL/TY r E44 EXTENSION .� FOR 5106 VAULT NO. 5106 - ZX 4.I6: FLOW DIFFUSER BAFFLE \ I1•� -2"" SLUDGE WEIR ' W t : OIL RETENTION y BAFFLE ii,•z., s •o CO E MINIMUM e20 DAY COMPRE55IVE STRENCaTW- FG4000 PSI. DESIGN IN ACCORDANCE W/ (JCL 5Z5&5 "MINIMUM'. R LUIREMEXn5 FOR 71411M SECTION PRECAST CONCQETE C0W5TRUCTI0N. 2.'•0" REINFORCF-MENT: DEFORMED e4RS IN XCORDANr_E W/ASTM. ,&15 C5 GRADE 40, 24" EXTENSION ' WELDED WIRE FABRIC IN ACCORDALICE W/A52-6do � A155-1�1 FOR 5106 VAULT DESIGN LOADS = No. X 3180 j GALVANIZING : lI b bs. s. ` � ALL FABRICATtO STEEL rFEM5 FK.EPT REINFORCING.TOBE L40T DIPPED GALVAUIZED AFTER FA6RICATI0N,COIJF0RMIrQG TO SPECI FICATIOWS ASTM AZ&4,A335,A38�,, r; A125. OIL WATER SEPEAATOR NO. 001 TYPE 6/06 SA UTILITY VAULT_ NO SCALE Note: L Driveway can to reduced to a thickness a 6 when a 10 gage wire mesh 3 square pattern is used Z Where driveway exceeds 16'In wldth a 2" dummy joint shall be placed longitudinal►/ along 1E. )ANSION JOINT EXPANSION JOINT (TYP.) EXPANSION JOINT (TYP.) See 'City Of Renton' Standard /2I //' Detail For Depressed Driveway EXPANSION JOINT AC. PVM7. Curb a Gutter -Type 0 10% MAX. SLOPE r• SECTION A -A DETAIL: CONCRETE ORI VEWAY NO $CAGE _ 3 -i��1 111 T51� .3Vi. I MAX J �111 l I c! l =«I Iil l IZ„ MIN. r7RASS - L 1 NEO SWALE = SECTION ""II - II " NO SCALE NYvrzr��,Ee�11�1G oiz t��I�►-r�l� ®F BIOFIL�'2�U►J �j\.✓,�L�S -5,14 .L.J, gE AGPL I il-I E r-> PI2-Ib R TO G,1rCJPar-4Ll N E I NL1i W. 'rb+J AND --1_NC-- -6WA L� gE FULL--r P2IOIZ 'ro IzML-F,�t5I (u , I KKO 6l.✓.Q. t-E6 . r i i t� r �•� ! ���-•If+y�J ��w v r r 1' I I NGo7 P�FZ U.PL. 01.-YMPIG FOUMP?ZY MANHDLr: •>O D-T PZIN44 s GRATe GRAT"L) OR L�QUAL #� 10 'FOP EL.13.G5 3 "� urlroN #19 TOP EL• 13F0 i.e. OUT t/.70 P P g.70 eOr-Tt>M QEL. 6.70 ® 3 "0 THREADED PLL!6r O4ALVANI7_Et75TEEI� PIPE G 3 * 0 6H EGIG VAL-Va l7 Z-6"X6"x 1(0" LONG. OL Keb. PLACED SIDE E5-f SIDE O3 n,IP DI66HAK,,15 5 LINE OTYI-E II- 54 0 SUM P POM- CHAM I3E12 OHYDROMArIO ptaMP MOt7EL SP50 M , I I S V WI >'H SU PER Si N4trE FLOAT SWrTGH S.3 erLTtZO No. 30 5S FD OEML : SUMP PUMP C NAMSER FOR CO'S. 10 19 NO SCALE EXIST. CEM. CONC. CURB 5 GUTTER 1/2"X 4" EXPANSION MATERIAL I R AT JOINTS I 3 III SCORE LINES II I III II I II 11 1 II I III u� Z�I/Z"X4e"JEXPAMNSION MATERIAL 1/4" R AT JOINTS Z 3 w' 17 1 /4"/FT. F�.,/2" SLOPE R I EXIST. U N 0 0) Z rn Q �C 00 U) w 0 W Lij Z> If UC) z I Q v cY) � 06 M co CD QW W Wz Oz Q W w _> w Q � ,^ v/ U O z M W rn o o N o Q o � V I � , Q � = o o Z �Idp u N ti Z o w E Z ON v q v !L e Q � � � Z _Z PAVEMENT 4"� Z ��W4 j� CEM. CONC CURB a GUTTER v Z _ W = N SECTION B-B > Q OETA 1 L = CONCRE'Trr- SSIOEWALK - W p NO SCALE Z Rfg. l fJ L DE-r�. I L_ �S �l L 1?4w/4?0702 C, � Gl,��loL1T 11=III= �► Z U t- W .60 0 w U 3 V) LLJ Y N Q = 0 -,N J. w Z J N 0 WAS��Q J i Q W DRAWN BY. CHECKED BY ,o�jfNFGIcT'a� ifs19A O.LN!- J. 1•W_ Z_ `� - 7D >:.. DATE. 4 _ /t/. T. S - /0 -11 -9 0 CALL 46 HOURS BEFORE YOU DIG 9 0 13 5.04 1-01000-4.24-5555 SHEt, 1A 7 SCANNED MAR 2 8 ;,��s 8 -3 -3 7