HomeMy WebLinkAboutTED4001834.3STORM DRAINAGE NOTES 1. Before any construction or development activity occurs, a pre -construction meeting must be held with the City of Renton Department of Public Works, Design Engineer. 2. All construction shall be in accordance with the " 1988 Standard Specifications for Road, Bridge and Municipal Construction" prepared by W.S.D.O.T., and the American Public Works Association (APWA), as amended by the City of Renton Department of Public Works. 3. The storm drainage system shall be constructed according to the approved plans which are on file in the Department of Public Works. Any deviation from the approved plans will require written approval from the City of Renton Department of Public Works, Design Engineer or Storm Water Utility. 4. A copy of these approved plans must be on the job site whenever construction is in progress. 5. Datum shall be U.S.G.S. unless. otherwise approved by City of Renton Department of Public Works. Reference benchmark and elevation are noted on the plans. 6. All sedimentation erosion facilities must be in operation prior to clearing and building construction, and they must be satisfactorily maintained until construction is completed and the potential for on -site erosion has passed. 7. All retention/detention facilities must be installed and in operation prior to or in conjunction with all construction activity unless otherwise approved by the Department of Public Works, Storm Water Utility. 8. Grass seed may be applied by hydroseeding. The grass seed mixture, other than City of Renton approved standard mixes, shall be submitted by a Landscape Architect and approved by the Dept. of Public Works, Storm Water Utility. 9. All pipe and appurtenances shall be laid on a properly prepared foundation in accordance with Section 7?02.3(1) of the current State of Washington Standard Specification for Road and Bridge Construction. This shall include necessary leveling of the trench bottom or the top of the foundation material as well as placement and compaction of required bedding material to uniform grade so that the entire length of the pipe will be supported on a uniformly dense unyielding base. All pipe bedding shall be APWA Class 'C' with the exception of PVC pipe. All trench backfill shall be compacted to minimum 95% for pavement and structural fill and 90% otherwise per ASTM D-1557-70. Pea gravel bedding shall be 6" over and under P.V.C. pipe. 10. Galvanized steel pipe and aluminized steel pipe for all drainage facilities shall have asphalt treatment #1 or better inside and outside. 11. Structures shall not be permitted within 10 feet of the spring line of any storm drainage pipe, or 15 feet from the top of any channel bank. 12. All catch basin grates shall be depressed 0.10 feet below the pavement level. 13. Open cut road crossings thru existing public right-of-way will not be allowed unless specifically approved by City of Renton Dept. of Public Works, Design Engineer. 14. Rock for erosion protection of roadside ditches, where required, shall be of sound quarry rock placed to a depth of 1 foot and must meet the following specifications: 47-8"/40%-70% passing; 2' -4" rock/30%-40% passing; and -2" rock/10%-20% passing. 15. All building downspouts and footing drains shall be connected to the storm drainage system, unless approved by the Dept. of Public Works, Design Engineer or Storm Water Utility. An accurately dimensioned certified as built drawing of this drainage system will be submitted to the City of Renton upon completion. 16. Issuance of the Building or Construction Permit by the City of Renton does not relieve the owner of the continuing legal obligation and/or liability connected with storm surface water disposition. Further, the City of Renton does not accept any obligation for the proper functioning and maintenance of the system provided during construction. 17. The Contractor shall be responsible for providing adequate safeguard, safety devices, protective equipment, flaggers, and any other needed actions to protect the life, health, and safety of the public and to protect property in connection with performance of work covered by the contract. Any work within the traveled right-of-way that may interrupt normal traffic flow shall require an approved traffic control plan by the Traffic Engineering Div, of the Dept. of Public Works. All section of the W.S.D.O.T. Standard Specifications 1-07-23, Traffic Control, shall apply. 18. Special drainage measures will be required if the project location is within the aquifer protection area. NELSON PL ACE N. W. WATER NOTES 1. All work materials shall be in conformance with the standards and specifications of the City of Renton Utility Department and the latest edition of the WSDOT/APWA Standards and Specifications, as approved by the City of Renton. A set of approved plans shall be kept on site at all times during construction. 2. The hours of work in the street right-of-way shall be limited to 8:30 AM to 3:30 PM on weekdays unless other wise approved in writing by the Department of Public Works at 235-2635. All street closures, partial or full, shall be approved by the Department of Public Works 24 hours in advance. The Police Department, Fire Department, and 911 shall be notified 24 hours in advance. 3. All locations of existing utilities shown are approximate and it shall be the contractor's responsibility to verify the true and correct location so as to avoid damage or disturbance. For utility locate call 48-Hour Locators, 1-800-424-5555. 4. All water main pipe to be cement lined ductile iron pipe conforming to AWWA C110 and C111 or latest revision, thickness Class 52. Cement mortar lining and seal coating shall conform to AWWA C104 or latest revision. Pipe joints to be push -on or mechanical joint. Bedding to be Class C. All ductile iron pipe installed South of Sunset Blvd. (Empire Way, SR 900) and West of SR 167 ( East Valley Freeway) or in soils of hi h resistivity shall be polyethylene wrapped per ANSI%gAWWA C105-77 Standards. 5. Cast iron and ductile iron fittings shall be cement lined, pressure rated as noted on plans, and in accordance with ANSI/AWWA C110/A21.10-82. Cement lining shall be in accordance with ANSI/AWWA C104/A21.4-85. If fittings are 3 inches to 12 inches in diameter and have mechanical joints, the fitting shall be in accordance with either ANSI/AWWA C110/A21.10-82 or ANSI/AWWA C153/A21.53-84. 3-inch to 12-inch diameter fittings which have mechanical joints and/or flanged joints shall be in accordance with ANSI/AWWA C110/A21.10.82 or a combination of ANSI/AWWA C110/A21.10.82 and ANSI/AWWA C153/A21.53-84 such that the portion of the fitting with a mechanical joint(s), may be in accordance with ANSI/AWWA C153/A21.53-84 and that portion of the fitting with flanged joint(s) shall be in accordance with ANSI/AWWA C110/A21.10-82. Acceptance testing in accordance with section 53-5.3 of ANSI/AWWA C153/A21.53-84 or with section 10-4.3 of ANSI/AWWA C110/A21.10-82 shall be obtained by the contractor and transmitted to the owner. 6. Gate valves shall conform to AWWA C500 and shall be iron body, bronzed -mounted, double disc with bronze wedging device and 0-ring stuffing box. Valves shall be designed for a minimum water operating pressure of 200 PSI. Gate valves shall be Clow List 14, Mueller Company No. A2380, or M & H. All valves 12" in diameter and larger, shall be installed in a vault. See water standard detail for 12" Gate Valve Assembly Vault and 1" Bypass Installation. Lu 0� T a * � m m N 41 c4 s ^. * 9 cA O 50 y Q c y EX. PROFILE 48 38 3 9MV - %+a -/I1iA 98+00 FL PROF/LE 0 k-1�. LF, 12"0 SD S - 99+00 100+00 TY 7. Fire hydrants shall be Corey type (opening with the pressure) conforming to AWWA C-504-80 with a 6 inch inlet and a M.V.O. of 5 inches, two 2-1/2 inch hose nozzles with national standard 7 inch, 60 degrees V. threads, O.D. thread 4.875 and root diameter 4.6263, 1-1/4 inch pentagon operating nut opened by turning counter clockwise left). 8. All water main 10 inches and smaller to maintain a minimum cover of 36 inches below finish grade. All water mains 12 inches and larger shall be at a minimum of 48 inches below finish grade. Where utility conflicts occur, water mains are to be lowered to clear. 9. All water mains six (6) inches in diameter and larger shall be cleaned with pipe cleaning "PIGS' prior to disinfection. The "Poly Pigs" shall be Girard Industries Aqua Swab -As or approved equal, 2 Ib/cu ft density foam with 90A durometer urethane rubber coating on the rear of "PIG" only. "PIGS' shall be cylinder shaped with bullet nose or square end. The City will assist the contractor who will perform the cleaning operation. 9a. All water mains and services shall be pressure tested to a minimum of 200 PSI or 150 PSI over operating pressure, in accordance with the specifications of the City of Renton and the Washington State Health Department. All pressure testing shall be done in the presence of a representative of the City of Renton. 9b. All water mains ands service shall be disinfected by the injection of a 50 m Minimum concentration 1 PP ( ) chlorine/water solution. Dry Calcium Hypochlorite shall NOT be placed in the pipe as laid. Chlorine shall be metered/injected in accordance with Section 7-11.3(12) E or 7-11.3(12)F of the Standard Specifications referenced in 1 above. 10. A preconstruction conference is required prior to any construction. A minimum of 3 (three) working days notice is required for scheduling. Prior to the precon a permit information sheet must be supplied to the Utility Engineer's Office. Twenty -Four hour notice will be required prior to starting new construction. 11. It shall be the contractor's responsibility to secure all necessary permits prior to starting construction. 12. Installation of corporate stops, water services, lines and meters shall not be done until all service agreements, meter applications, construction permits, and payment of fees have been made to the City of Renton. 13. All connection to existing mains to be accomplished by the City of Renton, except wet taps which may be made by approved wet tap contractors with prior approval of from the Department of Public Works. All necessary excavation and materials to be supplied by the contractor and be on -site prior to City notifications. �- SEE PAVEMENT WIDENING SECTION SHEET C-3 FOR TYPICAL PAVEMENT REQUIREMENTS. NOT TO SCALE II. PE CONFORMS TO CONSTRUCTION RECORDS fir 3 DATE - RETAINER GLANDS 8" ADAPTER (MJxFL 8" LENGTH AS REQ 3 EA. 3/4" m RODS -RECOMMENDED FnR IIII OVAL 14. Inspection will be accomplished by a representative of the City of Renton. It shall be the contractor's responsibility to notify the Utility Department 24 hours in advance of backfilling all construction. The contractor as well as the Engineers shall keep as -built drawings. 15. Contractor to provide plugs and temporary blow -off assemblies for testing and purity acceptance prior to final tie-in. 16. All joint restraint systems (shackle rods, nuts, bolts, etc.) shall be a manufactured by the Star Manufacturing Company of Columbus Ohio or equal approved in writing by the Department of Public Works. 17. Asphalt and concrete street paving shall be sawcut to a minimum depth of two inches. Oil mat streets may be spade cut. All surface concrete, pavement, sidewalks, curb, gutters, and driveway approaches shall be sawcut to a minimum depth of two inches or removed to an existing expansion joint. 18. A temporary cold mix asphalt patch shall be placed on the day of initial excavation with a permanent, sealed patch to be placed, to City of Renton policy, within ten days. Call for subgrade inspection prior io placement of final patch. Trenches will not be left open over night without prior written approval of the Inspector. 19. For City projects such as telemetry conduit, the PVC pipe used shall be schedule 40 in unimproved areas and schedule 80 under improved areas. All chemical process lines shall be schedule 80 PVC pipe. 'NTERIOR WALL OF BUILDING \S REQ'D. PER MECHANICAL 'LAN CONTRACTOR SHALL COORDINATE ACTUAL LOCATION rv/MECHANICAL ENGINEER OR CONTRACTOR. 3" BLIND FLANGE, LEVEL w/FLOOR 3" SPOOL,. LENGTH AS REQ'D. f0 KEEP BLIND FLANGE LEVEL 3" 90' BEND (MJ) 3 INTERIOR RISER DETAIL NOT TO SCALE RECOMMENDED COP APPROVA L / aAZ& RECOMMENDED FOR APPROVAL f +v REVISIONS NO. DESCRIPTION/DATE BY AS L,UII_T DWL,. 9 /27 /qo G.T. rc► �� ry Z O O J ZD r V, o W W Q V to i 3 00 00 N a LLJ ::) Z I 00 W > 0 Z N ■� 0 Q = t0 (9 J W Q N �--� = W w 3w O Z I- w Z W *WT- or af d EON O W_CD Z Z W V 0 V) X_ F- LL1 a: O Z W 2 cr) O U7 W Z V 0 Q Z O Z W LL O U JOB NO_ 438-01-890 DESIGNED BY: F. BROWN DRAWN BY: L.B. CHECKED BY: L.T.P. DATE: NOVEMBER, 1989 DATE OF PRINT C14 OF Jaw s0 iMNl�Q'ii � $ wJ3