Loading...
HomeMy WebLinkAboutTED4001836.1NW 1/4 SEC 3 TWP 23 N RGE 5 E W M I i I I I i I `l,1 r r•T Uj I a261 I I 1 I �I 11 I II Y III � 311 fDRY 3+07.3 ►+52.9� I .� LT(*) 0 Ld LLJ M 4 CB 9 (-W t) 760 - oeo -/AP4 0+04.� 15.8 LT 0 SEE DE AIL, SHEET 5 8 21 20 19 18 I) 17 16 CB to � PE f I .0' LT (AB) CS 5 CTIFE I CB -7 4+10.01 ICo. I' LT(M) z*°3.y2 N E 21 ST LACE 4z8.90 +4�•9, llv. I LT (AB '1 pe" 9 CB & A QT F Z Z+09.9) 5 6 ' I g I CB 9A (TfE r 1 Z� c7+'DCo� 159' i2' CITBDRY_ O+oo rn 113 CID `Q? IWI 25' I NI 25' I W� I I 401. Lo°I � I 42�0.93 I Ilacu� 1L 'GPt ,g•r• u' o, " w lid CB 5 A(TM_0 .1410) 1(0.9' (''i(A73') I I 9 10 15 r � 4. a• 4S N oc�' 40 STD. EiOL ARDS — ( �`�?(15�vEWLDuLN 8 N � a10 1K. Rti I � 422 AS? Ivl� I= o I E6MT w b'c:`.•L. i.':y.,:,.� . �j:i, a ... I sEE syEE ¢ W a F+0`9 0E7A1L -rwllQ AREA I I a �I a2 0 � 3 I TYPE _ �n ' I C6 3 CNFE IF 1549 1 � SOLID LOCKIWG U0 -rA 2+63. 5, 59' L-ra& 14 I I a22 I 1 � I I I I R I SEIZ 3A I � � 359 L-T r ' ( IS' ACCESS UTILITY E6MT I 2 I CB 2 ('Type 1- W) /56L1 D LOWQG UP 59. s' L_r(1Ae1 N I z in UJ RISER 4 -- ti in I , • RACT 'A' I 2 Q j 15' ACGEyS EZD I lo" G L B C.R IZUG K i sal J 5'gCGE55 EMT' i I J > t2 C p 1 0+C6)59.5 LT(AB) RISER ZA �*� I i (SE I t7E?AIL) �9 5, Li 15, I E., RD BOLL.ARpS �. (1' HIND NEW 51D_W4LJC) / I , 6" !b CR. ROCK GB IA I / I O+C 4� 3D. Z' LLT(AB) — 7.5 u I SORY 6466 ,, •9�6P ' I •r =`''' J IZE - INSTALL y0L N EXIST IZ" CP NRI I I I II NE 20 TH ST N EXIST. CB 1C3 � I I I, EKI Gt3 r I I ""AS -BUILT" r WE HEREBY CERTIFY THAT ALL IMPROVEMENTS DENOTED AS "AS -BUILT" IABI, T12A.C-T "4:` ,4i10 '�►t �(LA��t�C1E �iaGtt�l�'IES I�OC��� �/!`i ARE LOCATED AS SHOWN ON THESE PLANS, Is kl i T �41 ra T GT A,�N L. 13S �7 \-4 ago Awzs� j�A�ttlT�tl-1C� ��r' TEE I-1.41�► �v.��.I��LS %,c�dt,a�-('roi.1 s. : /�/ `o -moo �yY PROD T ENGINEER DATE (A�:) a 3 1� q 0 OU ER F ATE N SCALE 1 11 =40 1 PIPE SPECIFICATIONS Pipe specifications are based on design conditions for completed project. Contractors shall take all necessary precautions to protect all subsurface installations during the construction period. All pipe to be CMP or concrete pipe, except as shown. CMP Treatment 5 or better may be substituted for concrete pipe. All non -perforated metal pipe shall have neoprene gaskets at the joints. GALVANIZED STEEL CMP shall meet the requirements of AASHTO designation M-36, Type 1 and Type 2. Pipe shall have asphalt Treatment 1 or better. Corrugation - Corrugation - 3 x 1 2-2/3 x 1/2 Pipe Arch Gaae Band Pipe Arch 12"-36" 17x13 - 42x29 16 1211 4211-54" 16 2 4 " 54"-120" 6011 49x33 14 2411 126"-138" 40X31 - 11205 66"-9011 57x38 - 64x43 12 2411 144" 11709 - 137x87 96" 71x47 10 2411 142x91 77x52 - 83x57 8 2411 CORRUGATED ALUMINUM PIPE and coupling bands shall meet the requirements of AASHTO M196 and M197. Pi-e Arch Gaae Band 12"-27" 17x13 thru 42x29 16 1211 30"-36" 28x20 & 35x24 14 1811 42"-54" 42x29 & 49x33 12 1811 6011 57x38 & 64X43 10 2411 CONCRETE PIPE 2111 dia and less (ASTM C14 Extra Strength) shall be plain and conform to the requirements of AASHTO designation M-86, Class 2, and to designation M-198 for rubber gasketed joints, unless specified otherwise. Concrete pipe 2411 dia and larger (ASTM C76, Class 2) shall be reinforced and conform to the requirements of AASHTO designation M-170. ?�� 4 -V��" IL�J *, Sy 0 �a -16-Iff /O -16 -Ey /7 ocrg-7 cw W �►, , Z S4 o z •• ON 0 ti• ' .ti �37E�..�1 �t 1*0 '�•....•�' � ?3-fit 00 r � � r �! O N % i t j CO P = = O co ZA A '� I� 0 3 OZ a V� O u W u O = ao a M a Z Q J a. � 0 W ® � a 3 ?_J F_ m a o 1, o Cf) Z a 3 m 0 Q 0 X SHEET OF 6 JOB NO, _ 8002 Z 0 Z W X L. 0 } r~ I SCANNED MAR 2 8 2003 1sI ..� am