Loading...
HomeMy WebLinkAboutTED4001858.1XV5ED IV5 C.Q. ate" UDDITIOMQL YUO M 7-17-CP KLL Irl V:C'.1 OE AVE. b- n-tA LtL LEGEND FF = 286 FINISHED FLOOR 29� SPOT ELEVATION 186—� EXISTING GRADE 190-- FINISHED GRADE TYPE I TYPE Ii 54"(+) CB (AS NOTED) 12" CMP STORM LiNE W/SIZE 8k TYPE .-- EXISTING STORM LINE/CATCHBASIN ® YARD DRAIN DRAINAGE FLOW IN PARKING LOT UC) 1 11 IrL1J— ' InV T 58.A57. 34 f)EW 5COnC, 5/W 5EE DTL "to,SHT C-6 I1`15T�111_1_ nEW DEW APPOn -� 5EE DTL *7,5HT C-lo ---- - C8" 5 CTYf'E I) Inv = 58,004& A-L SHEET C-5 FOP, O(T-517 STOf�M InFOf�mi )T IOn C15MH4 2 CTYPE II Iw o ll o kV05IFICE COnT501- f31M =W.M_ 61-53 IF IV Ia" WT = 3Z. &7 SS. / ¢ I11V12'in = M (Q S7.70 OVE51FLOW = 5 l.t /Z" (ice) (W) S`X 44 EX C15 f5im = lDl 0 t Inv new = 59:t;, !14 A. IN v -'u: h ,/Ouy) S2•/ BELAY Ex. I2" 5Tof5munE f3E.U5L EX FIFE 013 f3EPLACE W/33 LF 12"CM17, S= 0.0100. SAWCUT J F3EMOVE EX. i'AVEMUT. ' PATCH PAVEMEnT PE.5 CITY OF f3UlTOf7 ST011MD5 SEE DTL #q, 5HT C-lo . f kMOVE EX. C15 > MEFLQCE WITH C 13MH TYFE II 48" � USE E.X. 51 M � 51L000L 171EXT TO CA15 5M=W:98' ,•' InV =ta.%L (40 S345' F-013 OFF -SITE SMEET IMPTVUTnTS -- SEE SHT C-5. ....:..... v. HIGHWAY (SR 169) STORM DRAINAGE NOTES: G 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY 11. Structures shell riot be permitted within 10 feet of OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH the spring line of any storm drainage pipe, or 15 feet f THE CITY OF RENTON DEPARTMENT OF PUBLIC WORKS, DESIGN from the top of any channel bank. ENGINEER. 12. All catch basin grates sholl be depressed 0.10 feet ti 2. All construction shell be in accordance with the "19W below pavement level. Standard Specifications for Rood, Bridge and Municipal Construction" prepared by W.S.D.O.T., and the American Public Works Association (APWA), as amended by the 13. Open cut rood crossings thru existing public right -of - City of Renton Deportment of Public Works. way will not be allowed unless specifically approved by City of Renton Dept. of Public Works, Design Engineer. 3. The storm drainage system shell be constructed according to the approved plans which are on file in the Department of Public Works. Any deviation from 14. Rock for erosion protection of roadside ditches, where the approved plans will require written approval from required, shell be of sound quarry rock placed to a the City of Renton Department of Public Works, Design depth of 1 foot and must meet the following W Engineer or Storm Water Utility specifications: 411-811/40X-70% passing; 2"-4" .rock/307.- 40X passing; and -2" rock/10%-20X possirg. 4. A copy of these approved plans must be on the job site whenever construction is in progress. 15. All building downspouts and footing drains shod be connected to the storm drainage system, unless approved by the Dept. of Public Works, Design Engineer 5. Datum shall be U.S.G.S, unless otherwise approved by or Storm Water Utility. An accurately dimensioned City of Renton Department of Public Works. Reference Certified as built drawing of this drainage system ^/ benchmark and elevation are noted on the plans. will be submitted to the City of Renton upon jnirl completion. 6. All sedimentation/erosion facilities must be in operation prior to clearing and building construction, 16. Issuance of the Building or Construction Permit by the �. and they must be satisfactorily maintained until City of Renton does not relieve the owner of the construction is completed and the potential for on- continuing legal obligation and/or liability connected Z site erosion has passed. with storm surface water disposition. Further, the City of Renton does not accept any obligation for the i proper functioning and maintenance of the system 7. All retention/detention facilities must be installed provided during construction. !v�� and in operation prior to or in conjunction with all construction activity unless otherwise approved by the Deportment of Public Works, Storm Water Utility. 17. The Contractor shall be responsible for providing adequate safeguard, safety devices, protective equipment, f(oggers, and any other needed actions to 8. Grass seed may be applied by hydroseeding. The grass protect the life health, and safety of the public, and seed mixture, other than City of Renton approved to protect property in connection with the performance standard mixes, shall be submitted by o Landscape of work covered by the contract. Any work within the Architect and approved by the Dept. of Public Works, traveled right-of-way that may interrupt normal r ~ Storm Water Utility. traffic flow shall require on approved traffic control Qsm plan by the Traffic Engineering Div. olf the Dept. of Public Works. All sections of the W-S.C.O.T. Standard 9. All pipe and appurtenances shall be laid on o Specifications 1-07-23, Traffic Control, shall apply. properly prepared foundation in accordance with Section 7-02.3 0) of the current State of Washington 18. Special drainage measures will be required If the Standard Specification for Road and Bridge project location is within the oquifer protection Construction. This shall include necessary leveling area. of the trench bottom or the top of the foundation material as well as placement and compaction of required bedding material to uniform grade so that the entire length of the pipe will be supported on a uniformly dense unyielding base. All pipe bedding shot( be APWA Class 'C', with the exception of PVC pipe. Al( trench bockfiIL shop be compacted to minimum 95X for pavement and structural fill and 90% otherwise per ASTM D-1557-70. Pee gravel bedding shall be 6" over and under P.V.C. pipe. 10. Galvanized steel pipe and aluminized steel pipe for all drainage facilities shot( have asphalt treatment 2� 01 or better inside and outside. t j. ASr nEW 5'COnC. SVW "-p. ` 5EE- DTL.' ID,SHTC-lo — �0- 41, ill T, i FEW ECC (TYP) 5CE/ DTL. #5,5HT C-Lo b: 7 51 USE 1.0' EXTEP1510n COLLM5 TO MEET P11M ELEV CCOLLM55 Flow Distribution "D. Bathe Grit/Sludge Retainer Baffle Clarifier Type Rel. Page Gal/V.F. 'A' "B' 'C I 'D' No. 466-S 18 138 Gal 19- 21' 1Z' I 12' BAFFLED OIL/WATER SEPARATOR (AVAILABLE THUR PIPE, INC.) m I m N to N WI z 0i W d w � WLe) O O J • J h+l ? W 3 p CL C Q z OM° 0 (� W Q O 0 E..,, PROJECT NO 88-96 DRAWN BY KLL ISSUE DATE 5-12-89 LATEST REV b-L5-61� 4o - / 8r; f�DAr%-IFIC ��;NGINEERING COMPANY CIVIL ENGINEEAINCs" ANQ,,,_ PLANNING CONSULTANTS / � lot am /a