Loading...
HomeMy WebLinkAboutTED4001860.6w Q r r% c 1e n u AL A _ AL _ .. I H �.9"�9"SPACE I SETS OF '5 BARS �fl w/5 SETS OF # 4 BARS PER SECTION 1/55 A END OF BRIDGE SLAB 81-311 INTERMEDIATE 5ECTION _ 15- 81-011 INTERMEDIATE 5ECTION5 (5ECURE TO I3RIOCE: SLAB) (SEGUfzE TO f!�nf?of �) III PREMOLDED 1/411 JOIW_ (TYP) JOI Q-r FILLER I S5 4p-i" CHAMFER (TYP) PLAN - TRAFFIC BARRIER S.W. CORNER SHOWN) OTHER5 SIMILAR. PACE 11 5ET5 OF # 5 BARS W16 ETS OF #4 BARS PER SECT. 1/5!5 JUNCTION BOX III 4 LIGHTING EE DETAIL. BRACKET �� 55 ANCHORAGE �. --A r.�.m 3!lzux 34" DEEP CONT. RECESS FOR HANDRAIL SEE NOTE I # 4 a� I, L @ _ 6„ N N_ _ 1 %211 CL o o (TYP) Q N � 11 i* 4 N #4 N� N # 5 - °� @ 9" #5 5 �, @ 911 r' ell N 3" 1 u O #4. - BRIDGE DECK SLAB SECTION I 7S57 NOTE, TRAFFIC BARRIER TO 13RIDgE DECK SLAB CONNECTION 5HOWN. CONNECTION TO W INgVVAL.L SIMILAR LIGHTING BRACKET ANCHORAGE 4 JUNCTION BOX NOTES 1. THE RECESS AT THE TOP OF THE TRAFFIC BARRIER FOR THE BOTTOM CHANNEL OF THE HANDRAIL SHALL BE FORMED BY THE USE OF A TEM- PLATE. THE TEMPLATE SHALL HAVE BOLT SPACING LOCATED PROPERLY TO MATCH THE BOLT SPACING OF THE BOTTOM CHANNELS. TO FACILI- TATE PLACE'•,ENT OF CONCRETE IN THE TRAFFIC BARRIER, CONCRETE MAY BE POURED TO 8 INCHES BELOW THE TOP OF THE BARRIER OR TO THE BOTTOM OF THE RECESS IF WEDGE A'JCHORS ARE USED, PRIOR TO INSTALLATION, THE TEMPLATE. AFTER THE TEMPLATE IS IN PLACE, THE CONCRETE SHALL BE POURED AND COMPACTED SO THAT THERE IS NO SEPARATION BETWEEN POURS. ALL SECTION 2 S5 Izab Ift 006 3 - R4 E. IYl, GALV RICHMOND O_ ROCKP-T INSERTS OR EQUAL. CTYP.) - � V. a JUNCTION 130X AT EACH I!8�� 3 x 11 HEX " LICHTINC-I BRACKETANCHOR.AC-4E # 5 BAR5 PER �N HEAD AP SCREWS • PULL f3l AT !LOCATIONS �5 BARS INDICATED ON S1-iI=ET G-� SECTION 2/55 W12-y211 THREADS 3 - 9 II $ 5 TYPICAL INTERMEDIATE SECTION I = _'�., Coflx Coll x 411 GALV J— SOX, Z REINFORCEMENT _ — -- o -__ _ �,� (ASTM A-307)- I CAST IKON, O-Z TYPE YU OR TYP. REI N F BARRIER W/ LUMINAIRE SEE -DETAIL A/55- � EQUAL WITH TAPPED CONDUIT F-NTRANCES. CONDUIT 2 AN C H ORAL = N -- - - — ® - _ - I �� 144 61ALV. PIPE CAP '� FROM BOTTOM . AT EACH LIC?HTINC� _� < \` / �'� BRACKET ANC HORNGE , / • ; N OUTSIDE FACE BEVEL EDGE TO I�i CONDUIT ELECTRICALLY ELEVATION -TRAFFIC BARRIER OF BARRIER o FACILITATE I�� BoIN �E� To TWO I . RTS REMOVAL I INSERT BEARS ON DRILL FORMS i WAS H E R BUT 15 • ACCURATELY FOR I - STD. 6,ALV. CUT i1 I NOT ATTACHED TO IT ANCHORAGE CAP SCREW 11 I I I WASHER LOCATIONS 4 BOL-T 0,0 y" 9" INSERTS TO FORM ; I 11 it APPROX, I'-7" APPROX. I'-7" C4ALV. PIPE Dim J N 19 13 1 DETAIL A CONDUIT WHERE. INDICATED 1 APPROVED FOR CONSTRUCTION S5 OtA yll �.'D ON SHT. 60 FA4 CfiY OF HE NTON PUBLIC �F�SECTOR DATE Syr �� �� ` DETAIL B SECTION ECTIOAI 3 W-749A/SHT 9 OF 22 F S5 SS ONE E INC" owl AS CONSTRUCTED AT FULL SIZE MAL �IF NOT ONE INCH DATE FEB. 19&5 SCALE ACCORDINGL I G.O- tI gw 3/8-5 DESIGNED : METRO DATE i �JAN 84 S S S =, -municipality of Metropolitan Seattle BROWN AND - RENTON TREATMENT PLANT o1„�WN SCALE: ARMs:AOO26Z PM NONE. S.W. 7th STREET BRIDGE FILE: v a C A L D W E L L ;v _ , locco R MMENDEQ CONSULTING ENGINEERS � DRAWING NUMBER Engineers •Architects •Planners ENLARGEMENT H E to -� rr S 5 SEATTLE, WASHINGTON 9 rj�yk TRAh rIC BARRIER DETAILSN0. RE`�ISI0N BY DATE � SHEET 140F 22 a-% v V y G 9 v /r SCANNED MAR 2 8 2003