HomeMy WebLinkAboutTED4001883.3DEMOLITION NOTES
DRemove light standard, base, and wiring.
DRemove concrete curb and island.
DExisting power and lighting poles to remain.
DAdjust existing manhole top to new finish grade.
DAdjust telephone manhole/handhoie top to new finish grade.
DAdjust existng catch basin rim to new finish grade.
DFor utility demolition see Sheets C-4,G5,4-G7
Remove concrete curb. I'
Remove AC pavement, base and subbase.
0) Remove concrete sidewalk and curb edge.
Remove concrete retaining wall and lawn edge.
J Remove AC pavement and provide trench for new electrical and irrigation systems.
Remove pavement striping within project limits that interfere with new parking
lot layout.
J Remove 48 inches diameter drain pipe.
) Remove lawn and landscaping.
0
ON PLAN
*---PKOJr--GT LIMITS �� - 1 -U;
�1
z
>oJ
vz
Cn
y G
r
o�
>�
'
o�>
o�W
o
� d
�y G
Y � t
z
® Q13
Q6
/9-Z-22