Loading...
HomeMy WebLinkAboutSWP5002046.4A E F G H 5 4 3 2 1 I NO: I SG 244003 N 999.80 _ E 1095.75 P 244001 -- 14 PRESSURE GAGE - I I 12" PD - DIP FIELD VERIFY LOCATION ---PILE CAP BEAM -U TYPICAL 11 TYPICAL I I I I I �-- PRESSURE GAGE 14 I 610I - TYP I I I I I I I I ! I L�7- L— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —� 1 ELECTRICAL APPARATUS SEE ELEC DWG E2 M1 STORM WATER PUMP STATION PLAN AT ELEVATION 130.5 SCALE: 3/8"=1'-0" EL 130.Of o 7 I 1 I 18" x 18" SLUICE GATE 30 SG 2440 33 - I -- i I INV AT WALL EL 100.50 - - I 1 EL 9 2.6 7 -- -� - HcBrown and Caldwell Consultants Seattle, Washington REVISION BY DATE 8" VENT SCH 40 STEEL BUTT -WELD. COAT AS PER KEY NOTE 15 AFTER FABRICATION - - EL 131.5 LL I I �xl: r - EL 130.25 -POSITION OF STEM , I'I WITH GATE II RAISED_ I I I 17 I I I , 1, 1 1 PUMP LIFTING I RAILS AS READ BY MFG I I -- _C( -1 1 /8' DIA STEM I I 15 12" PD ---I I I 1 I 17 I I 1 I I I I 1f I I I le 1 I 1 I I I I LIFTING CHAIN I I BY PUMP MFR D6 6 1 22 I I I SECTION SCALE: 3/8"=1'-0" M1 DATUM NOTE: ELEVATION 100.00 EQUALS MEAN SEA LEVEL, 1929 U.S.C. & G.S.(ADJUSTED 1947) COORDINATES ARE BASED ON LOCAL -PLANT GRID EL 130.8t �j 00 --� ---SEE PLAN FOR OPERATOR 12" PD 15 ORIENTATION 24 EL 132.50 -- EL 131.5f 11 12" PD 15 ' EL 132. L0 a _-1L__J it PRECAST CONCRETE VAULT, SEE UTILITY VAULT COMPANY DRAWING ATTACHED I II I- L� _ L _ -- EL 127.50 1'1 1.1 . ih 0 t u u II II u u + II '� SLOPE 1 /4"/FT MINIMUM - 3" DR 27 ELECTRICAL APPARATUS SEE ELEC DWG E2 DRAIN VAULT ACCESS LADDER nn SEE UTILITY VAULT DWG - KEY NOTES: - EL 123.50 TYPE B STRUCTURAL BACKFILL IF REQUIRED BY ENGINEER O1 SLEEVE TYPE MECHANICAL PIPE COUPLING, TYPICAL. DRESSER 13 18" STORM DRAIN (SD) SHALL BE REINFORCED CONCRETE STYLE 38, ROCKWELL TYPE 415, OR EQUAL. REMOVE STOP FROM PIPE, CLASS IV, ASTM C76, RUBBER GASKETS PER C443. MIDDLE RING. RESTRAIN COUPLING IN ACCORDANCE WITH AWWA LAY (2)-3' LENGTHS OF PIPE AWAY FROM STRUCTURE BEFORE M11, PARAGRAPH 13.10, TABLES 13-7 AND 13-7, AND FIGURE LAYING STANDARD LENGTH PIPE. 13-17. FIELD COAT COUPLING AND TENSION RODS WITH DENSO SYSTEM T-1 PRIMER AND FINISH COATS, TRENTON #1 WAX TAPE 14 PRESSURE GAGES SHALL BE 4-1/2" GLYCERINE -FILLED, SOLID PRIMER COAT AND #1 WAX TAPE FINISH, OR EQUAL. FRONT UNITS WITH PHENOLIC TURRET CASES, BOURDON TUBE O PROVIDE FLANGED BY PLAIN END STEEL COAT PER KEY NOTE 15. ELEMENTS, 270' MILLED STAINLESS STEEL MOVEMENTS AND PIPE EMBEDDED IN CONCRETE PILE. SHATTERPROOF GLASS WINDOWS. GAGE SHALL BE PROVIDED WITH 1/2" NPT. GAGE VALVE BY ANDERSON GREENWOOD 3� PROVIDE 3" I.D. PIPE STANCHION WHERE INDICATED. WELD HOKE 2100 OR EQUAL. 10" SQUARE X 1/2" STEEL STANCHION BASE PLATE TO 3" STANCHION. DRILL BASE PLATE FOR �4) 3/4" DIA BOLTS ON 8" 15 ALL EXPOSED AND/OR SUBMERGED PIPING IN WETWELL AND CENTERS. DRILL STANCHION FOR 1/4 DIA VENT HOLE 1/2" VALVE VAULT SHALL BE COATED WITH COAL TAR EPDXY, 20 ABOVE BASE PLATE BEFORE DOING ANY WELDING. PROVIDE (4) MIL DRY FILM THICKNESS, KOPPERS, GLIDDEN OR PORTERS. 3/4" DIA SS EXPANSION ANCHORS IN CONCRETE FLOOR OF VAULT. APPLY PER MANUFACTURERS RECOMENDATIONS. PROVIDE LEVELING NUTS AND WASHERS UNDER BASE PLATE TO 16 CORE THROUGH LEAN CONCRETE PILE AND INSTALL DRAIN. PROVIDE PIPE ALIGNMENT CAPABILTY. DOUBLE NUT ABOVE BASE SEAL WITH "LINK -SEAL". PLATE. AFTER FABRICATION (SEE KEY NOTES 4 AND 5), HOT DIP GALVANIZE ENTIRE ASSEMBLY. GROUT UNDER BASE PLATE. 17 PROVIDE STRUCTURAL CONCRETE CONFIGURATION FOR O WELD 4" X 12" X 3/8" STEEL PLATE SADDLE TO TOP OF 3" ID EMBEDMENT AND ANCHORS. SEE STRUCTURAL DRAWINGS. STANCHION. SHAPE SADDLE PLATE TO MATCH BOTTOM CURVE OF CHECK VALVE BODY. SEE KEY NOTE 3 REGARDING GALVANIZING. 18 PROVIDE (2) 18" LONG BELL x PE PIPES, RESTRAINED JOINTS. JOINTS. O PROVIDE STANCHION SADDLE, MSS TYPE 37. DRILL STANCHION 19 BELL x BELL 45' ELBOW, RESTRAINED JOINT. PIPE AND SADDLE FOR 3/4" DIA BOLT. INSTALL BOLT, LOCK O ' WASHER AND NUT. INSTALL SADDLE AFTER GALVANIZING. 20 BELL x BELL 11.25' ELBOW, RESTRAINED JOINT. SEE KEY NOTE 3 REGARDING GALVANIZING. O6 F TYPE WALL THIMBLE, 18" LONG, WITH 18" 21 PE x PE 30" LONG SPOOL. DIAMETER CIRCULAR OPENING, COAL TAR --- -- -- P 244002 EPDXY COATED. BUTT UP AGAINST A 30" 22 SEE SECTION 5/S2 FOR SLUICE GATE THIMBLE. SPEC: 11347 LONG (INCLUDING BELL), 18" DIAMETER, CLASS IV, ASTM C76 RCP RUBBER GASKET 23 MJ x MJ 45' DOWN. ELEVATION TO MATCH CONNECTION JOINT PIPE. GROUT ASSEMBLY IN PLACE. POINT FOR PWC 19 12" PD. - EL 100.50 O7 PROVIDE INTERMEDIATE GATE STEM GUIDES. / " 24 4 -0 x 6 -0 HATCH BILCO TYPE JD-3AL, 1 4 ALUMINUM, INSTALL GUIDES WITH SS ANCHOR BOLTS, ALUMINUM FRAME, BITUMINOUS COATING ON FRAME EXTERIOR cO� SIZE AS SPECIFIED BY SLUICE GATE NEXT TO CONCRETE, HINGED ON 6' SIDE. STAINLESS MANUFACTURER. HARDWARE THROUGHOUT, TAKE DRAINAGE TO OUTSIDE VAULT, -� PUMP ON TYPICAL 4 DOORS. O8 PROVIDE TOP GATE STEM GUIDE AND LIFT THRUST ASSEMBLY. INSTALL WITH SS 25 6'-0 x 8'-0 HATCH BILCO TYPE JD -AL, 1/4" ALUMINUM, -EL 100.00 ANCHOR BOLTS, SIZE AS SPECIFIED BY ALUMINUM FRAME, BITUMINOUS COATING ON FRAME EXTERIOR MANUFACTURER. PROVIDE VALVE BOX IN TOP SLAB FOR OPERATING NUT ACCESS, NEXT TO CONCRETE, HINGED ON 6' SIDE. STAINLESS SIMILAR TO CLOW F2450. HARDWARE THROUGHOUT, TAKE DRAINAGE TO OUTSIDE VAULT. EL 95.00 O PROVIDE 6" SLEEVEIN PRECAST VAULT 26 PROVIDE (2) CONCRETE EXPANSION EYE BOLTS FOR LIFTING FLOOR. INSTALL 3" DRAIN IN VAULT CHAIN. -- - — SLAB. FLOOR DRAIN SHALL BE JOSAM 27 CAST IRON SOIL PIPE, ASTM A74, COMPRESSION JOINT WITH PUMP OFF 32120 OR EQUAL DUCTILE IRON GRATE AND RUBBER GASKET, OR HUBLESS CAST IRON SYSTEM. TOP VOLUTE OUTLET TO MATCH PIPE, GROUT DRAIN AND / FLOOR DRAIN IN SLAB WITH NON -SHRINK 28 GROUT. SLOPE SLAB TO DRAIN WITH 12" ECCENTRIC PLUG VALVE. SEE M2 FOR SPECIFICATION. TOPPING CONCRETE WITH 1/2" MIN N THICKNESS. 29 12" SWING CHECK VALVE. SEE M2 FOR SPECIFICATION. I ---- - - 10 INTERMEDIATE SUPPORTS FOR VERTICAL 30 SLUICE GATE SHALL BE OF HEAVY DUTY CAST IRON w >_ SECTION OF PUMP DISCHARGE AND CONSTRUCTION WITH FULL METAL WEDGES, FLAT FRAME o BUBBLER PIPING. SEE STRUCTURAL AND TYPE F WALL THIMBLE. GATE SHALL BE 18" x z EL 92.17 DRAWINGS. 18", OPEN UP, FLUSH BOTTOM NEOPRENE SEATING, - z 11 GALVANIZED SCHEDULE 40 STEEL PIPE INTEGRAL FRAME, SUITABLE FOR 21' OF UNSEATING z SLEEVE EMBEDDED IN CONCRETE WALL BY HEAD. SLUICE GATE SHALL COMPLY EITH AWWA C501. z �` U VAULT MFG, TYPICAL. PROVIDE MODULAR GATE SHALL BE BLAST CLEANED (SSPC-5) AND COATED - L Q MECHANICAL EXPANDING RUBBER SEAL -LINK WITH COAL TAR EPDXY TO PROVIDE A 20 MIL DRY FILM o a SEAL OR EQUAL, TYPICAL. THICKNESS. SLUICE GATE SHALL BE RODNEY HUNT, J < WATERMAN, OR EQUAL. Pkc4)m kNUEU 12 PUMP GUIDE RAIL SUPPORTS AS REQD BY 'L _ FOR APPROVAL PUMP MANUFACTURER. Q z eY 3^oiaeoswi- 6 - 36 — qz CNs1uc+eJ- no As4m If Avo i l c0c . D 204604 DESIGNED: I= O p DATE: Municipalityof Metropolitan Seattle JEH/BEW 4' MAR 1992 DRAWN: CHECKED: SCALE: METRO'S REGIONAL TREATMENT PLANT IN RENTON FILE No: SEACAD GRN ENLARGEMENT IIIA STORMWATER PUMPING STATION RECOMMENDED: AN NOTED DRAWING N0: CONTRACT NO PLAN AND SECTION M1 EXPIRES 5/27/ Z APPROVED: W/M 37-91 SHEET N0: OF PWC 28 6 N .� 5 4 3 2 tj " u t r �0FI n