Loading...
HomeMy WebLinkAboutSWP2702057.3LO O N N X --68.2 X 69,9 X 0 X40 67,1 Scale: 1 Inch = 40 Feet �H R2 REMOVE SEDIMENT AND TALL GRASS. 69,5 X R2 X 72 X 68A R2 M 3 69. 3 X FAIRWAY CROSSING 59,6 X Y z X 72.5 69 77� 0 t�l xi' i Svc y�� Y 70.5 X , X 5� 7 68.9 X Q 71.2 X 70.6 2013 CHANNEL AND VEGETATION MAINTENANCE CITY WILL HELP IDENTIFY WORK AND AREAS FOR VEGETATION AND SEDIMENT REMOVAL. CITY MAY ADD, REMOVE, OR ADJUST GRAVEL PLACEMENT, SEDIMENT REMOVAL, AND VEGETATION CLEANING AREAS AS NEEDED. R2 REMOVE SEDIMENT AND GRASS, % ABOUT 8'Lx3W' EACH LOCATION. 70,7 X 71�2 X CONSTRUCTION NOTES 1. CONSTRUCTION SHALL NOT INTERFERE WITH GOLF COURSE PLAY AND PARKING LOT USE, EXCEPT FOR CLEANING THE FLOW SPLITTER, AND AS NOTED OTHERWISE. 2. TRUCK TRAFFIC SHALL STOP AND NOT CROSS BRIDGE WHEN GOLFERS ARE TEEING OFF OF THE 18TH TEE. 3. ONLY SMALL SOFT TIRED VEHICLES MAY BE USED WEST OF THE FLOW SPLITTER. 4. CONTRACTOR SHALL NOT BLOCK CART PATHS AND SHALL YIELD THE RIGHT OF WAY TO GOLF CARTS AND GOLFERS. 5. CONTRACTOR SHALL AVOID DAMAGING THE GOLF COURSE GROUNDS. ANY DAMAGES SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE, TO THE SATISFACTION OF THE CITY. 6. WORK ON THE CHANNEL AND 10TH AND 1 1 TH FAIRWAYS SHALL NOT INTERFERE WITH GOLF COURSE PLAY. 7. CONTRACTOR SHALL IMMEDIATELY CLEAN ANY DIRT OR DEBRIS SPILLED IN THE GOLF COURSE PARKING LOT AND DRIVING LANES. . . RECOMMENDED FOR APPROVAL BY Daniel Carey 6/10/13 BY NO. REVISION X 2 MAPLEWOOD CREEK MAIN CHANNEL R2 REMOVE SEDIMENT AND TALL GRASS. 71.6 X 71�5 R2 72,6 X MAIN CHANNEL MAINTENANCE SURVEYED: DESIGNED: DC DRAWN: DC CHECKED: DC / RS BY DATE AP P R APPROVED: RS 74� 3 X / �3.2 '--R2 FAIRWAY CROSSING 88.2 X ACCESS FOR CREEK MAINTENANCE FROM WEST SIDE ONLY GRAVEL PLACEMENT SEE DETAIL .",GRAVEL PLACEMENT SEE DETAIL 2 GRAVEL PLACEMENT SEE DETAIL 2 737 X 72� 4 X 205733 SCALE: AS NOTED VERTICAL NAVD 1988 HORIZONTAL: NAD 1983/1991 ,� •I CITY OF � *Mm R, RENTON ONE INCH Ij Planning/Building/Public Works Dept. AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY I I I I i 18TH TEE (LOWER) FLOW SPLITTER 12TH QV GREEN Q X 2013 Cleaning l 1 I 1 I 801 X DATE: MAPLEWOOD CREEK SEDIMENT BASIN 6/10/13 CLEANING & MAINTENANCE PROJECT PAGE: OK: PAGE: DRAWING NO: MAIN CHANNEL 3 SHEET: OF: X 6 -F 5"�33 02057