Loading...
HomeMy WebLinkAboutSWP2702057.34LO N N n U) 74.3 R2 —8x3 ix 1 X 9 0 ,0 Scale: 1 Inch = 40 Feet �3 4 R2 9 x Q 18TH TEE � (UPPER) SINGLE DUMP TRUCKS ONLY ACROSS BRIDGE, NO TRAILERS 88.2 x ACCESS FOR CREEK MAINTENANCE FROM WEST SIDE ONLY 77.7 x CARS PAIN 18TH TEE (LOWER) FLOW SPUTTER 12TH GREEN Q �Q:� O / Lu V' McCARTY - Q O PROPERTY i MACHINERY ALLOWED ONLY it ON TOP OF BANK. j RESTORE ANY DAMAGE TO TOP AFTER WORK IS COMPLETED x n I B 1 �o 84� 0 HIGH FLOW CHANNEL (DRY) �,Z R2 ~R2 80�1 77.6 7 x x FAIRWAY CROSSING 73 FLOW SPUTTER AND CHANNEL WORK DRAWING CONSTRUCTION NOTES 1. CONSTRUCTION SHALL NOT INTERFERE WITH GOLF COURSE PLAY AND PARKING LOT USE, EXCEPT FOR CLEANING THE FLOW SPLITTER, AND AS NOTED OTHERWISE. 2. TRUCK TRAFFIC SHALL STOP AND NOT CROSS BRIDGE WHEN GOLFERS ARE TEEING OFF OF THE 18TH TEE. 3. ONLY SMALL SOFT TIRED VEHICLES MAY BE USED ON THE GOLF COURSE WEST OF THE FLOW SPLITTER. 4. CONTRACTOR SHALL NOT BLOCK CART PATHS AND SHALL YIELD THE RIGHT OF WAY TO GOLF CARTS AND GOLFERS. 5. CONTRACTOR SHALL AVOID DAMAGING THE GOLF COURSE GROUNDS. ANY DAMAGES SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE, TO THE SATISFACTION OF THE CITY. 6. WORK ON THE CHANNEL AND 10TH AND 11TH FAIRWAYS SHALL NOT INTERFERE WITH GOLF COURSE PLAY. 7. CONTRACTOR SHALL IMMEDIATELY CLEAN ANY DIRT OR DEBRIS SPILLED IN THE GOLF COURSE PARKING LOT AND DRIVING LANES. RECOMMENDED FOR APPROVAL BY Daniel Carey 6/5/14 BY N0. REVISION 1 EX. BYPASS INLET AND VALVE BYPASS CREEK INTO Ex.18" PIPE (TEMPORARY) HYDROSEED AND STRAW MULCH BARE AREAS AROUND BASIN AFTER CLEANING EX.18" BYPASS PIPE ACCESS ROAD FISHWAY INLET FISH LADDER \ I 9 6.5 �__-----`-- vv �, LIMITS FOR PARKING LOT USE \ LOATKING BY CONTRACTOR \ X Q 18TH TEE � (UPPER) TINGLE DUMP TRUCKS ONLY CROSS BRIDGE, NO TRAILERS SURVEYED: DESIGNED: DC DRAWN: DC CHECKED: DC / RS BY DATE APPR APPROVED: RS SCALE: AS NOTED ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY PQ� INSTALL TEMPORARY BYPASS DAM FOR CREEK DIVERSION -PROVIDE SECOND DAM, SUMP, AND r PUMP TO COLLECT SECONDARY FLOW REMOVE APPROX 1 to 3 FEET OF SEDIMENT ' FROM BETWEEN ROCK WEIRS SEE BASE GRADE PLAN FOR APPROX LOCATIONS CAUTION PVC LINER � APPROX LOCATION _.. SEDIMENT BASIN REMOVE APPROX 4 TO 5 FEET OF ACCUMULATED SEDIMENT SEE BASIN BASE GRADE PLAN VALVE TO McCARTY POND iJ OVERFLOW SPILLWAY MAPLEWG, D I Ali iz 'i ILL Co 'W Q, / ._ V'; McCARTY Q /ZOO } PROPERTY 9,1 ,q F4, / CLEAN SEDIMENT FROM STANDPIPE AND VALVE. 2014 POND AND CHANNEL MAINTENANCE CITY WILL HELP IDENTIFY WORK AREAS, LOCATIONS, AND EXTENT OF WORK. 131 ADD TWO LARGE ROUNDED BOULDERS TO FLOW SPUTTER. MACHINE MAY PLACE FROM TOP OF BANK, ADJUST LOCATION IN CREEK BY HAND. B2 REBUILD AND COMPACT BANK AT EROSION LOCATION USING ONSITE SEDIMENTS, (APPX 2—IN AND SMALLER) B3 ADD BOULDERS TO PROTECT BANK AFTER CLEANING IS COMPLETED. ADJUST LOCATION, NUMBER AS DIRECTED. B4 REBUILD —ADJUST ROCK WEIRS AS DIRECTED BY CITY, ADD ROCKS AS DIRECTED. / SEDIMENT BASIN CLEANING DRAWING VERTICAL- NAVD 1988 HORIZONTAL- NAD 1983/1991 j_ D=205702 AA CITY OF ba RENTON Planning/Building/Public Works Dept. 2014 Cleaning DATE: MAPLEWOOD CREEK SEDIMENT BASIN 6/5/14 CLEANING & MAINTENANCE PROJECT FlELDBOOK: PAGE: DRAWING NO: SEDIMENT BASIN AND FLOW SPUTTER 2 SHEET: OF: x 6 IDI-12'101177 C Z L Ems= C EG)° Cil c� Iv z m z m m O D D 0 mo � 00 CD mcn m 'z* Ic �_ 'mo � m rn- r f1] z z m 0 D m D z (7) z m m 4 CD o N � N � N ® CD I D n ° � I o o D G Do N 0 D G\ o W zm -D • $ D 0 $ � z