HomeMy WebLinkAboutSWP2702057.35poll
X
--6 8 2
19.1
69.9 x
x40 67A
Scale: 1 Inch = 40 Feet
a
X
X
689
R2 REMOVE WEEDS -
R2
AND SEDIMENT. N7x3 R2
6 g N13x4 _
X R21 /
R2
o
N3x4 R2
� o
R2 i 'o R2
Ro 70.
R2 x
69
R2 x
FAIRWAY CROSSING
70
69,6 Ilk
C,Y
X
X
X
7 0, 5 x
x 68.
/ 7 (� 7
X
x 725
x 71 `5 ���7
69
4'41
Gti�
x
7T7
68.9
x
7
7�6
Y
7�.6
X
Q
X 2014 CHANNEL AND VEGETATION MAINTENANCE
CITY WILL HELP IDENTIFY WORK AND AREAS FOR VEGETATION AND SEDIMENT REMOVAL.
CITY MAY ADD, REMOVE, OR ADJUST GRAVEL PLACEMENT, SEDIMENT REMOVAL, AND
` VEGETATION CLEANING AREAS AS NEEDED.
R2 REMOVE INVASIVE WEEDS AND SEDIMENT,
SIZE VARIES, APPROX 1.5'x 1.5' TO 8'x3'.
70�6
x
71.2
x
72
x
70.7
X
71.2
x
7
CONSTRUCTION NOTES
1. CONSTRUCTION SHALL NOT INTERFERE WITH GOLF COURSE PLAY AND PARKING LOT USE,
EXCEPT FOR CLEANING THE FLOW SPLITTER, AND AS NOTED OTHERWISE.
2. TRUCK TRAFFIC SHALL STOP AND NOT CROSS BRIDGE WHEN GOLFERS ARE TEEING OFF OF THE 18TH TEE.
3. ONLY SMALL SOFT TIRED VEHICLES MAY BE USED WEST OF THE FLOW SPLITTER.
4. CONTRACTOR SHALL NOT BLOCK CART PATHS AND SHALL YIELD THE RIGHT OF WAY TO GOLF CARTS AND GOLFERS.
5. CONTRACTOR SHALL AVOID DAMAGING THE GOLF COURSE GROUNDS.
ANY DAMAGES SHALL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE, TO THE SATISFACTION OF THE CITY.
6. WORK ON THE CHANNEL AND 10TH AND 1 1 TH FAIRWAYS SHALL NOT INTERFERE WITH GOLF COURSE PLAY.
7. CONTRACTOR SHALL IMMEDIATELY CLEAN ANY DIRT OR DEBRIS SPILLED IN THE GOLF COURSE PARKING LOT AND DRIVING LANES.
RECOMMENDED
FOR APPROVAL
BY Daniel Carey 6/5/14
BY
N0.
REVISION
X
7
0?
2
MAPLEWOOD CREEK
MAIN CHANNEL
71.6
x
74.3
x
R2 REMOVE WEEDS
AND SEDIMENT.
R2 _
N8x3
R2 7
6x1 of 3 2
R2
R2 R2 C�
71 6x3 R2
o �
--_ R2� o R2 �
mm��
72�6
x
MAIN CHANNEL MAINTENANCE
SURVEYED:
DESIGNED:
DC DRAWN:
DC
CHECKED:
DC / RS
BY DATE APPR APPROVED:
RS
2 FAIRWAY CROSSING
88,2
x
ACCESS FOR CREEK MAINTENANCE
FROM WEST SIDE ONLY
733
X
D=205703
SCALE:
VERTICAL: NAVD 1988
CITY O F
AS NOTED HORIZONTAL: MAD 7983/183/1997
R EN TON
ONE INCH i�
AT FULL SCALEPlanning/Building/Public Works Dept.
IF NOT ONE INCH
SCALE ACCORDINGLY �^
Tay
72� 4
x
18TH TEE
(LOWER)
FLOW SPUTTER
00 �
12TH
GREEN
2014 Cleaning
DATE:
MAPLEWOOD CREEK SEDIMENT BASIN 6/5/14
CLEANING & MAINTENANCE PROJECT FlELDBOOK:
PAGE:
DRAWING NO:
MAIN CHANNEL 3
SHEET: OF:
x 6
IDHADBIA
�=
07 CDC
mm
LLn
N z
m
m
m
0
4
D
D
m
0
0 o
O0
D
Dm
zm
I�
m=
0
0m
m-
U K
nu z
z
m
O
I
D
m
D
Z
0
C
W
m
o
n�
®off
C4.
Cat
I D
m
0
I
m
a00
D
J m C
z —O!
W�D
T{
D
0
S z
elm
7