Loading...
HomeMy WebLinkAboutSWP1002064.2HORIZONTAL DATUM N P R EXISTING 10-52 BUILDING S T R S GRID SYSTEM BASED ON SOUTH EAST CORNER F. F. = 3 4.0 8 OF BOEING BUILDING NO. 10-52. GRID SYSTEM IS PARALLEL TO SOUTH LINE OF SAID BUILDING. 5'-0 10'-0 40'-0 30'-0 5'-0 40'-0" VERTICAL DATUM 25'-0" 15'-0" f. i i I i I BENCHMARK g REF. C-4 I EXIST. BLDG. FOUNDATION PILE CAPS &PILES i ELEVATIONS BASED ON "BOEING RENTON BENCHMARK NO.2" REF. DRAWING. ELEVATION = 37.01 SUBTRACT OUTLET FROM c2 c3 I _ � g 7.42 FEET FOR U.S.C.G.S. DATUM ' ; 2 BOILER BLOW DOWN ' I 4 c2 c3 SUBSTRUCTURES ' � I ' I I -�� r� r, r` - ' - - BURIED UTILITIES ARE SHOWN AS INDICATED ON RECORD ...�.... .......... T.J. ......... ' ' ' I �j �'-� _ _'- j MAPS FURNISHED BY OTHERS AND VERIFIED WHERE �IEANL _ _ _ - � . . . . . . . . . . .. .. ........ : •i • :: • •:•:•:��•� � 33.25 SPILL TYP ® PERIM. OF CONTAINMENT AREA.; I BOILER BLOW ,. DOWN VAULT �- � � � � � � ::.: � ; � � � 1 1 ' �• � � 1 ; ; POSSIBLE BY FEATURES LOCATED IN THE FIELD. WE ASSUME NO LIABILITY FOR THE ACCURACY OF THOSE r _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _r.. _�_ .•.•: REF. C5 .� ; � 'L-----4" I.P.----------- 2 � i , OUTLINE OF , • �' CONC. BALLAST I ' I I o � _I i -- ; -- J III TANK PIPING 1 ; ; REF. MECH'L. RECORDS. CONTRACTOR SHALL FIELD VERIFY LOCATION I OF EXISTING UTILITIES IN AREAS CRITICAL TO THE WORK. •••.• 0 . F . ..... 5 ------------.. .....'' C.JI1I '''; -------- -------- I ------ I; _j F (I - 8n 0 PVC SLEEVE LEGEND O I I O I ( O I 6" I.P. (TO STORM. SEWER) AROUND ALL HORIZ. 1 PIPES PASSING THROUGH20'-0 6 I CONC. BALLAST H.P.S. HIGH PRESSURE STEAM 2 A S.DSTORM DRAIN c EL 32.57 2C2 cc OUTLINE OF S.S. SANITARY SEWER II SUMP EL 32.07 TANK BELOW REF. MECH'L W. WATERRIM INV EL 30.67 C.J. I i t I C.B. CATCH BASIN M.H. MANHOLE I I ' A I I I A I C.P. CONCRETE PIPE I.P. IRON PIPE C2 C3 ; I O 4 I I C2 C3 O I O ; i o C2 C3 I I ( I ® ® O LF LINEAL FEET s" I.P. (s.s.}-----�-;--------- ....4 .:.:.: I I I (3 I I I I :: ::::.:.:.:;:. ; o I I I I I I —� SLOPE DOWN 2" STYROFOAM AROUND :.:.::.:. NEW 6" THICK REINF. CONC. I ., ....I...... I I I O I I r....... I O I ': " ® ® ALL VERTICAL PIPES OR SLAB ON GRADEO ® ACCESS SUMPS PASSING o o (_ _o Cis ; I_ ® (_ ® O THROUGH CONC. BALLAST T.J. THROUGH JOINT ® CONC. GRADE SLAB -, C.J. _ `' 2b M Z - - - - - C.J. CONSTRUCTION/CONTRACTION JT. @ GRADE SLAB o _ I c I I ....... ` ....... b , ifl 1 ' I cy � U �.... .:.; :::. •.•.'.'.•.'.... -------------- 6 LP. (S.S.) -- --------------------- ---- `-' :: :..' ---- --------- ¢ LLI ^I. .. T.J. ; I o 11'-0 3'-6 11'-0 3'-6 11-0 I I ; "i 7 C2 C3 Z2\ i I 1'-6 40'-0 1'-6 I INV. EL. 29.80 (6" INV. EL. 26.73 3O" I.P.) C.P.) A ; 43'-0 rn LJ---------------------------------------------------- -�-------------` —---------- 3O" C.P. (S.D.)---------------------------- -r-----------------------------------------------------------„%MH CONSTRUCTION NOTES CB �--�--------1 .— LJ C.B. (EXIST.) ---'"� RIM EL 32.10 D OUTLINE OF CONCRETE BALLAST OVER TANKS. REF. A/C2 FOR ii INV WEST 29.70 (EXIST.) �- DIMENSIONS AND DETAILS. EXISTING OIL/WATER --------- INV NORTH 29.70 (NEW) SEPARATOR D LIMITS OF NEW 8" THICK CONCRETE SLAB ON GRADE. REINF. 8" I.P. (SD) W/ #4 ® 12"o.c. EA. WAY @ MID -DEPTH OF SLAB. REF. 2/C3 FOR CONSTRUCTION DETAILS. TANK INSTALLATION SPILL CONTAINMENT AREA P LAN D A C O N C R ETE BALLAST PLAN FACE OF EXISTING BUILDING. SCALE 1"-10' N C2 C2 SCALE 1"-10' N D TEMPORARY ABOVE GRADE FUEL OIL STORAGE TANK. REF. MECH. D SLOPE NEW PAVING IN AREA OF EXIST. BOILER BLOWDOWN VAULT. 30-W-4 GALVANIZED GRATING w/ D CONSTRUCTION JOINTS OR COTRACTION JOINT. REF. 2/C3 3 1/2% 3/8" BEARING BARS EMERGENCY FLAP VALVE- D THROUGH JOINT BETWEEN OLD & NEW CONSTRUCTION REF. 2/C3. BOLT &CAULK TO SUMP VAULT 2 1/4" MAX. GAP D THROUGH JOINT (4 EXIST. BLDG. WALL REF. 2/C3 NEW 8" THICK REINF. CONC. c2 c SLAB ON GRADE CHAIN w/ EMERGENCY CLOSURE HOOK 1/4" 2 ® 6" L 4 x 3 x 3/8" STAGG. 1 /4" 2 ® 6" R S to N z #4 x 2'-6 ABOVE & F T BELOW PIPE #4 ® 12" o.c. -- EA. EAY Q D sN ID vi ® CENTER OF WALL OR BASE / '%.s t, 7"eor V, 4v,2• ft7BLDG. 10-58 \ 6"0 DUCTILE IRON PIPE ������ ��/ // ///�\�� L 2 1 /2 x 2 N 1 /2 x 3/8" BLDG. 10-56 BLDG 3N 10-57 BLDG. 10-55 1N 1 2"� x 3" WELD STUDS _ `n Lo 3 lo 2 EA. SIDE OF FRAME Lo 1 77 �\8- F_ of o � s CHECKED FOR COMPLIANCE � 7 `- �' HOOK TYP ® 6"r. NOTE: ALL ANGLE TO BE GALVANIZED, RECOMMENDED TO MY STMWDS m � J m m s m 0D 10 6" ALL REINF. f.FOR ®CORNERS AND APPROVAL rqq / 10-52 Rat£' BMITER UTT WELD �'11 >> 3'-0n i—` 5ut"" UTI. t T ! `- PROJECT LOCATION °� ' SUMP SECTION 2 D ETA I L@ SUMP ANGLE F- R A M E RECOMMEN DED ��� KEY PLAN N C2 C2 3/4" = 1'-0" C2�C2 1 1 /2" = 1'-Y' FOR APPROVAL NO SCALE BY, PLAN F rvvw:::q14-12. c REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE' El AUBURN, WA. 98002 ••�� rj 00 ACCEPTABILITY DRAWN BY AL 11 9 SUBTITLE TANK INSTALLATION / SYMBOL B DATE 5/26/92 A III _ PLAN CHECK REVISIONS DJK 5/26/92 DJK 11 9 ❑ BELLEVUE, WA. 98007 �. �'���'� �s • � THIS DESIGN AND/OR SPECIFICATION IS APPROVED SPILL CONTAINMENT PLAN LAST REVISION SHEET BOE/A/O ❑ EV E R ETT, WA. 98201 . ` 0-2 of 2 5 B REVISED CONTAINMENT ELEVATION DJK 7/17/92 APPROVED BY DEPT. DATE TITLE TANK SYSTEM 4-04 FACILITIES DEPARTMENT ❑ KENT, WA. 98031 - - ❑ ■ PORTLAND, OR. RENTON, WA. 97220 98055 '•. ' = BUILDING 10-52 JOB NO. 30259-000 COMP NO. - ROVED ❑ S EATTLE, WA. 98124 �•� A11L ��� •..• DWG N0. - - 110 052 1028 %SWP -IC: - 2C 4 c r) ,' µ .2 V 9 (e o - Pt by 6 7