Loading...
HomeMy WebLinkAboutSWP3002070.2NOTES: 1. PAVING DAMAGED DURING CONSTRUCTION SHALL BE REPLACED. RESTORE PAVING AND SUBGRADE TO ORIGINAL CONDITION. 0 X DURATION OF PROJECT SYM REVISI❑N BY PPROVEI DATE I SYM REVISIONS PER BOEING REVIEW COMMENTS OF JD/JH MJB 04 JUN 92 01 JUN 92 AND HART CROWSER FINAL REVIEW REVISIONS PER CITY OF RENTON REVIEW COMMENTS JD/JH MJB 21 AUG 92 OF 1 AUG 92 REVISIONS PER CITY OF RENTON REVIEW COMMENTS JD/JH MJB 14 OCT 92 OF OCT 92 �5wp,,--yo-2070 REVISI❑N BY 1 PPR❑VED DATE offz�5--gUllyo FACILITIES DEPARTMENT ) REMAIN) RM LINE m CHECKED FOR COMPL, TO CITY STANDARDS r1s-�='==-Date ' 0 -. 2 3- q 2 Date Date ❑ AUBURN, WA. 98002 ❑ EVERETT, WA, 98201 ❑ KENT, WA. 98031 ❑ PORTLAND, 0R. 97220 ■ RENTON, WA. 98055 ❑ SEATTLE, WA, 98124 2. AFTER REMOVAL OF EXISTING LINER AND FILL, LEVEL SUBGRADE AND PROOF ROLL TO DENSE NON -YIELDING CONDITION PRIOR TO INSTALLING CRUSHED ROCK RINGWALL AND CRUSHED ROCK SURFACE COVER INSIDE DIKE CONTAINMENT WALLS. FINISHED GRADE: 24 FEET. 3. CONTRACTOR MUST PRESERVE ACCESS FOR OWNER'S USE OF DIESEL TANK AND CONCRETE FUEL CONTAINMENT AREAS AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO COORDINATE INTERFERENCE AND POSSIBLE INTERRUPTIONS WITH OWNER'S REPRESENTATIVE. 4. STAGING FOR TANK CONTRUCTION AND DEMOLITION MAY BE ALLOWED WEST OF DIKE CONTAINMENT AREA. EXACT AREA AND DURATION OF USE TO BE NEGOTIATED BY CONTRACTOR WITH OWNER'S REPRESENTATIVE. 5. PROVIDE ECOLOGY BLOCKS OR JERSEY BARRIERS (2 FOOT MAX. SPACING) TO PROTECT TEMPORARY PIPING FROM TRAFFIC ALONG ENTIRE LENGTH OF PIPING RUN. SUBMIT PLATE AND BLOCKING PLAN FOR VEHICLE CROSSING OVER TEMPORARY PIPING WHERE NEEDED. 6. DRAINAGE WORK SHALL BE IN ACCORDANCE WITH THE WASHINGTON STATE D.O.T./A.P.W.A. SPECIFICATIONS (1991 EDITION) AND THE STANDARD PLANS. 7. CONTRACTOR TO PLACE TEMPORARY PS 300 SERVICE TANK INSIDE CONTAINMENT EITHER BY LIFTING IT IN WITH APPROPRIATE CRANE OR CUTTING WALL ON WEST SIDE OF CONTAINMENT AND TRANSPORTING IT IN ON WHEELS. AFTER SPOTTING TANK, A MINIMUM CLEARANCE OF FIVE FEET SHALL BE PROVIDED ON ALL SIDES. CONTRACTOR SHALL CONSTRUCT A SECONDARY CONTAINMENT CELL, USING THE EXISTING WALLS AND SAND BAGS, OR OTHER APPROVED DEVICES, AROUND THE TANK, PROVIDING A MINIMUM STORAGE VOLUME OF 26,250 GALLONS. PRIMARY TANK SHELL PRIMARY TANK BOTTOM SECONDARY TANK SHELL � [� SECONDARY TANK BOTTOM, PROVIDE CORROSRECOMMENDED PTECTION RACTIICEPAPI 65 EL. 24.0 -Oo ° o\ �0 O� � °c� o0 0 \Of� O�OO � O oO O \O° 1 \00 o VaA, V 1 - d CONCRETE RINGWALL FOUNDATION NOTE 00. ° 15" Q v ° o ,--- 4' wi 00� Qs O oo00o° 00 o c& 3' 3'� CONTRACTOR SHALL SUBMIT RINGWALL DESIGN DETAILS FOR PROPOSED NEW TANK. SUBMISSION SHALL ASSURE FACTOR OF SAFETY WITH RESPECT TO BEARING CAPACITY UNDER TANK SHELL OF AT LEAST 3.0. t , o /0 0 oe 9�30'D / V3/4" MINUS PER SPECIFICATION FOUNDATION MATERIAL CLASS A PER WSDOT/APWA 9-03.17 SECTION - TANK FOUNDATION B NOT TO SCALE r7 I (- BEDDING ( APWA 199 SAWCUT TYP. CTED STRUCTURAL )R TRENCH LL SECTION - TYPICAL PIPE TRENCH NOT TO SCALE RECOMMENDED FOR APPROVAL BY.4- 0 ft F4 c tr w4-rr& ACCEPTABILITY DRAWN THIS DESIGN AND/OR CHECK PECIFICATI❑N IS APPROVED APPROVED BY I DEPT, DATE N=N PPR❑VED ConT7c C�E+q�� /va 4r -,6&, 1 4vco/a6t_6 &)�/) 7/2el RECOMMENDED FOR APPROVAL BY� 17a•�- PLq ry Rev ow. /0-23- 9,z DATE SUBTITLE EJG 5/7/92 SITE PLAN AND SECTIONS JAH 5/7/92 Y TITLE JAH 5 92 FUEL STORAGE REPLACEMENT SLG 5 92 FOR ARE-129 RENTON FACILITY BLDG 4-89 RENTON C�4D: /-)-..>6)asO v C -k'' 2a70aJ 2 Aw w: l5� 5/19/92 LAST REVISI❑N SYM DATE SHEET 2 C 2 ❑F 5 JOB NO, C❑MP,N❑, 305355 �FU-DWG#' DWG. NO. 304-089-1002