Loading...
HomeMy WebLinkAboutTED4002165.16SECTION 18, TWP 23 N, RGE 5 Ej W.M. 2 E X V' R STRUT ORES RES CL PI STA 2 146.��, 5*55,28, 6/0 06. I---- A U+ 4U U+du 1+2U 1+60 2+00 2+40 2+80 3+20 3+60 4+00----- 4+40 4+80 5+20 PER C / 7-Y DE74-11- CONCRETE BARRIER C114NA1,CL1ZX71'01V 51104141 7/-//5 5ATCr1V07-,4PPR4146-p - /CURB & GUTTER 81 CITY OF R E N T O N 1 22' flAIA L. C114AIAIE: L 1Z4 710AI D4E!51GX1 APPr-3�0 11,4Z- 5114L L- gft Leonard, Boudinot & Skodie Inc. 4" CONCRETE 7 15' 6C VNDER 0' 503101774Z 777-14C WHEELCHAIR RAMP SCHEDULE PROFESSIONAL ENGINEERS & LAND SURVEYORS DEPARTMENT OF PUBLIC WORKS J14", - 7 Z?1111-510AI 603 South First Street; P.O. Box 1228 FRED MEYER M ATCH EXIST ASPHALT ------- 771?4N.5POR74 -10AI SX-5725M5 STA. 0+20, 38' LT. Mount Vernon, WA 98273 E) Tel: 206-336-5751 Fax: 206-336-3981 RENTON CENTER ROAD SLOPE STA. 0+68, 22' RT. 000 m----4" CLASS "B" HARDIE AVENUE PLAN & PROFILE 000 APPROVED 0 STA. 0+88, 59' LT. 0 00 0 0 ASPHALT (TWO LIFTS) 0 S elEVIS10KIS Ft�ecfrl-�CLVM -rrL 91-30jq� DESIGNED: DEL DATE: 8/8/94 FILE NAME: 94058 0 -P CITY DEZ-41L 00 00 0' 0 6" GRAVEL .9 0 0 00) 0 00 0 0 O�?� 0 HARDIE AVE SW ROADWAY SECTION RIGHT SIDE BASE COO 0 6" CRUSHED SURFACING i 2 PLAN ORIENTATION DICTATED BY CITY DEL DEL 8/2 DRAWN: DEL/SBK STA. 1+75 TO STA. +IS [B OAT7 -/! 1,10 2/94 HOR. 1"=20' ,L,�9 I"- - -?, SCALE: FIELD BOOK: PAGE: TOP COURSE f 1 REVISED PER CITY COMMENTS SBK DEL 7/14/94 CHECKED: HAF VER. 1"=2' '12" GRAVEL BASE N.T.S. NO. REVISION BY APPR. DATE APPROVED: SHEET.C-330F: 36 DIRECTOR OF PUBLIC WORKS