HomeMy WebLinkAboutTED4002165.9SECTION 18, TWP 23 N, RGE 5 E, W.M.
ft.
1
O
V
t 30 Vr `
°
BANK
THROUGH
VAULT `
OVERH
TYR �)
pit
. PETS 'R' 1 1
PREOlOU
°
1 �+
PL
I
I
30 30
MON. 4
WELL
-1
O
MONITOR
WELL
--RAINIER AVE. SOUTH
IIIIIIIIIII�
!ham
APPROVED
E
PL
r SEE SHEET C-20 OF 35 FOR
EROSION CONTROL NOTES.
I EXPIRED
N
5w
CONSTRUCTION SEQUENCE:
I
64
■ •
' 1. ARRANGE AND ATTEND PRE —
CONSTRUCTION MEETING WITH CITY
/
OF RENTON PUBLIC WORKS
ENGINEER.
r r 2. FLAG CLEARING/WORKING LIMITS.
I 3. INSTALL ROCK CONSTRUCTION
r ENTRANCES.
r
4. ERECT FILTER FABRIC FENCE
■
AROUND ALL CATCH BASINS AND
s•
r
r SWALE.
r
5. CLEAR THE SITE. DEMOLISH AND
REMOVE EXISTING BUILDINGS AND
r
r
I
UTILITY STRUCTURES NOTED FOR
REMOVAL.
o =
�
I
�
GRAVEL
6. REMOVE, GRIND AND STOCKPILE
SWA„
i
r
EXISTING ASPHALT PAVEMENT ON
RA►sEo ASP". s.
I SITE.
r
7. ROUGH GRADE PER ROADWAY
I
' AND GRADING PLAN.
8. INSTALL STORM DRAINAGE PIPES
r
AND CATCH BASINS.
9. INSTALL OTHER UTILITIESI
TER FABRIC FENCE
SANITARY SEWERS, WATER PIPES,
_ET FILTER (TYPICAL
r
ETC.
ALL CB'S), SEE DETAIL
r
,
EET C-31 OF 360
10. FINAL GRADE AND PAVING.
°°
VAULT
r so.
r 11. CONSTRUCT BIOSWALE AND
If
PLACE ON LINE.
JSTRUCTION
�
:TAIL
' 12. HYDROSEED, MULCH, AND PLANT
3(0
r
1
LANDSCAPING.
r
13. REMOVE THE REMAINING TEMPORARY
Aso
EROSION/SEDIMENTATION CONTROL
s 12"
, ONLY AFTER THE SITE HAS BEEN
_
STABILIZED AND CITY OR RENTON
INSPECTOR HAS APPROVED THE REMOVAL.
14. FLUSH AND CLEAN STORM DRAINAGE
SYSTEM. DO NOT FLUSH SEDIMENT OFF
THE SITE.
CITY OF RENTON
Leonard, Boudinot &
Skodje Inc.
OF PUBLIC WORKS
DEPARTMENT
PROFESSIONAL ENGINEERS & LAND SURVEYORS
a'' 603 South First Street; P.O. Box 1228
FRED MEYER
Mount Vernon, WA 98273
Tel: 206-336-5751 Fax: 206-336-3981
RENTON CENTER
TEMPORARY EROSION CONTROL PLAN
DESIGNED: HAF
DATE: 8/8/94
FILE NAME: 94058
2
REVISIONS PER CITY COMMENTS
DEL
HAF
8/12/94
DRAWN: SBK
SCALE: 1 "=60'
FlELD BOOK: PAGE
1
REVISIONS PER CITY COMMENTS
DEL
HAF
7 14 94
CHECKED: HAF
APPROVED:
DIRECTOR OF PUBLIC WORKS
SHEET.C-21 OF: 36
N0.
REVISION
BY TAPPR,
DATE
F'�b_l 1�.7