HomeMy WebLinkAboutSWP2702172.62" ACP OVERLAY ACP TRENCH PAT 6" S. 2n d ST. 2" OTHER STREET A nI /C'^rr Klr-rC -)\ 1. TRENCH LIMITS SHALL BE PER 7-04.3(1)A OF THE SPECIAL PROVISIONS. 0.5' CRUSHED SURFACING TOP COURSE (INCIDENTAL TO ACP TRENCH PATCH) NATIVE MATERIAL OR BANK RUN GRAVEL IF NATIVE MATERIAL IS UNSUITABLE PER SPECIAL PROVISION 2-09.3(1)E BEDDING MATERIAL PER SPECIAL PROVISION 7-04.3(1)(B) (INCIDENTAL TO PIPE) GRAVEL BACKFILL FOR FOUNDATIONS IF REQUIRED PER 2-09.3(1)C 2. ACP OVERLAY TO EXTEND 1.0' BEYOND ACP TRENCH PATCH UNLESS WITHIN STREET OVERLAY LIMITS PER DETAIL 2 ON SHEET 6. TRENCH SECTION N TS TREE NOTES: 1. WORK SHALL BE COMPLETED IN ACCORDANCE W/ SECTION 8-02 OF THE SPECIFICATIONS AND THIS DETAIL. 2. FILL PLANTER WITH MULCH TO LEVEL OF SIDEWALK AFTER INSTALLING TREE 3. AT THE END OF ONE YEAR GUARANTEE PERIOD, REMOVE MULCH AND STAKES TO DEPTH NECESSARY TO REINSTALL BRICKWORK WITHIN PLANTER SURROUNDING THE TREE. BRICKS SHALL BE SET FLUSH WITH THE SIDEWALK. 12" MIN. N OTES 1. A minimum 6—inch vertical separation shall be provided at utility crossings, unless noted otherwise on the plans or as allowed by the Engineer. Utility crossing locations and elevations shall be determined by the contractor in advance of any construction activities. 2. The Contractor shall confirm using smoke, dye, or other testing methods whether pipes noted on the plans as abandoned are in fact not being used. Pipes confirmed as abandoned shall be plugged as noted. Pipes found to be active shall be connected to new structures at no additional cost. All such testing shall be incidental to the other contract pay items. 3. All removed items of recoverable value shall be carefully salvaged and delivered to the Owner in good condition and as directed by the Engineer. Materials and items deemed of no value by the Engineer shall be removed by the Contractor and become the Contractor's property to be disposed of in accordance with the contract. 4. All work within the City of Seattle's Cedar River pipeline right—of—way located parallel to and adjacent to S. 2nd Street shall be done in accordance with the conditions and requirements of the City of Seattle. Any costs incurred shall be incidental and included within the bid prices in the contract. A minimum of 48 hours notice shall be given to the Seattle Water Department prior to the performance of any work within the pipeline right—of—way. i /2" DIA. SOFT DARK GREEN RUBBER HOSE. OVERLAP HOSE F0 FORM A FIGURE EIGHT. TREE TRUNK MUST NOT BE IN CONTACT N/ WOOD BAR OR 12 GA. WIRE. 2"x2%10' WOOD STAKE. PLACE ON CURB SIDE OF TREE. WRAP & TWIST 12 GA. WIRE ENDS AROUND 1 "x4" BOARD. BOARD & STAKE FINISH SHALL BE SMOOTH W/ NO SHARP OR PROTRUDING BURRS &/OR SPLINTERS. LAl�) I IINU JUIL ur,L/I.I ../ �/ — . " ,, . , ,, . — 36" GREATER & 1 /3 EXISTING SOIL. THOROUGHLY WATER SETTLE. THAN DIA. OF ROOTBALL DECIDUOUS TREE PLANTING DETAIL N TS GRADE 2" ACP OVERLAY. 2" DEPTH OF GRIND OR SAWCUT AND REMOVE EXISTING PAVEMENT PRIOR TO OVERLAY EXIST PAVEMENT SURFACE �--EDGE OF CURB & GUTTER (TYP BOTH SIDES) FULL STREET OVERLAY W/ GRINDING LAKE AVE STA 50+20 TO 50+64 EXIST PAVEMENT SURFACE EDGE OF PAVEMENT EDGE OF CURB & GUTTER 2" ACP OVERLAY. 2" DEPTH OF GRIND OR SAWCUT AND REMOVE EXISTING PAVEMENT PRIOR TO OVERLAY HALF STREET OVERLAY W/ GRINDING LAKE AVE STA 50+64 TO 58+80 2" ACP OVERLAY, EXCEPT EDGES OF NEW MAT SHALL BE "FEATHERED" TO 1" MAX. DEPTH AT CURB LINE. AT CONNECTING STREETS EXISTING PAVEMENT SHALL BE PLANED PER STANDARD PLAN AS MARKED OUT BY ENGINEER IN FIELD EXIST PAVEMENT SURFACE FULL STREET OVERLAY (MINIMUM GRINDING) TOBIN STREET STA 99+50 TO 108+00 STREET OVERLAY LIMITS N TS EDGE OF PAVEMENT EDGE OF CURB &GUTTER (TYP BOTH SIDES) o- 2i#1zoc ,ITY OF RENTON `I'MENT 'BLIC WORKS S. BIN bT. - LAKE AVE. STORM SYSTEM IMPROVEMENT PROJECT DESK' ) SW DATE: 7/9/96 FILE NAME: 6575DET DF N SCALE FIELD BOOK: 629 SHEET: 6 OF: 6 CHECKED: NO. REVISION BY I APPR. DATE APPROVED: rr =' �o �z q <x > �' 5'w,P-27- 2I72 x SCANNED fVIAO 3 0 2000