HomeMy WebLinkAboutWWP2702235.1BACKFILL MATERIAL
(SEE NOTE 5)
CONCRETE CLASS C
(SEE NOTE 8)
FOUNDATION LEVEL
BACKFILL MATERIAL
(SEE NOTE 5)
BEDDING MATERIAL
FOR RIGID PIPE
(SEE NOTE 6)
FOUNDATION LEVEL
BEDDING MA1
FOR FLEXIBL
(SEE NOTE
FOUNDATION
W (SEE NOTE 4)
(CLASS B, C, D, DESIGN)
BEDDING FOR RIGID PIPE
(CLASS F DESIGN)
BEDDING FOR FLEXIBLE PIPE
24"x 24" COMM. CLS. CONCRETE
BLOCK POURED AROUND
CONNECTION TO MAIN
-. ' • 7
. '>
ter•'
:y _ .♦•
. 4 ' •.
"
N
LIMITS OF PIPE ZONE
C
LIMITS OF PIPE ZONE
LIMITS OF PIPE ZONE
NOTES: CITY OF RENTON STANDARD PLAN B077
1. PROVIDE UNIFORM SUPPORT UNDER BARREL.
2. HAND TAMP UNDER HAUNCHES.
3- COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY OVER PIPE_
HAND TAMP ONLY.
4. SEE "EXCAVATION AND PREPARATION OF TRENCH" IN THE SANITARY SEWERS SECTION
OF THE STANDARD SPECIFICTATIONS FOR TRENCH WIDTH "W" AND TRENCHING OPTIONS.
THE PIPE ZONE WILL BE THE ACTAUL TRENCH WIDTH, EXCEPT FOR CLASS A
BEDDING. THE MINIMUM CONCRETE WIDTH SHALL BE 1-1/2 I.D_ + 18"_
5. TRENCH BACKFILL SHALL CONFORM TO "BACKFILLING SEWER TRENCHES" IN THE
SANITARY SEWERS SECTION OF THE STANDARD SPECIFICATIONS, EXCEPT THAT ROCKS
OR LUMPS LARGER THAN 1 " PER FOOT OF PIPE DIAMETER SHALL NOT BE USED IN THE
BACKFILL MATERIAL.
6. SEE "BEDDING MATERIAL FOR RIGID PIPE" IN THE AGGREGATES SECTION OF THE
STANDARD SPECIFICATIONS FOR THE MATERIAL SPECIFICATIONS.
7. SEE "BEDDING MATERIAL FOR FLEXIBLE PIPE" IN THE AGGREGATES SECTION OF
STANDARD SPECIFICATION FOR THE MATERIAL SPECIFICATIONS.
8. PIPE MUST BE ANCHORED IN SUCH A MANER AS TO ENSURE FLOW LINE IS
MAINTAINED.
BEDDING CLASS DESIGN
DIMENSION
CLASS A
CLASS B
CLASS C
CLASS D
CLASS F
A
4" MIN.
1/4 1. D.
12" MAX.
*
*
ZERO
B
1 /4 0_D.
1 /2 O_D_
1 /8 O.D.
ZERO
O.D.
C
3/4 O_D_
1 /2 0_D.
1 /8 O.D.
O.D.
-
* A = 4" MIN. 27" I.D. AND UNDER
6" MIN. OVER 27" I.D.
i IPIPE BEDDING FOR SANITARY S
$ 9) N.T.S.
BELOW STREET GRADE
6" ON 6" Y BRANCH
NOTE:
DO NOT USE WITHOUT WRITTEN
APPROVAL OF THE WASTEWATER
UTILITY -
NOTE:
TO RAISE TO GRADE USE STANDARD 6" SEWER PIPE
LONG 6" 1/8 BEND
STANDARD 6" ON 8" TEE
- SEWER MAIN
SIDE SEWER RISER
ONNECTION TO SEWER MAIN
N.T.S.
CITY OF RENTON STANDARD PLAN 8076
3/4" SQUARES SPACED - 3/4"
AS INDICATED - HT_ 1 /8"
RAISE-1 /2" -
WIDE BORDER
CAST IRON RING AND COVER
PIPE MATERIAL AS SPECIFIED
BY THE ENGINEER 41
12" 0
FIBER
PACKIA
45- (1 /8)
CONCRETE
CLASS 3000
PLUG TO BE SEALED
IN SAME MANNER AS
MAIN SEWER JOINTS_
0-1
2 �" OR 8" CLEANOUT
8 9 N.T.S.
WARNER ENGINEERING
5122 Olympic Dr. NW Office (206) 858-8577
Suite B204 Fax (206) 858-8579
Gig Harbor, WA 98335
S?23S
EXPIRES 9/21 iq ( ` NO.
r0MAM190
SEWER NOTE & SPECIFICATIONS
1. ALL WORK MATERIALS SHALL BE IN CONFORMANCE WITH THE
STANDARDS AND SPECIFICATIONS OF THE CITY OF RENTON AND THE
LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS.
2. THE HOURS OF WORK IN THE STREET RIGHT—OF—WAY SHALL BE
LIMITED TO 8:30 AM TO 3:30 PM ON WEEKDAYS UNLESS OTHERWISE
APPROVED IN WRITING BY THE TRANSPORTATION DIVISION AT 277-6222.
ALL STREET CLOSURES, PARTIAL OR FULL, SHALL BE APPROVED BY THE
TRANSPORTATION DIVISION 24 HOURS IN ADVANCE. THE POLICE
DEPARTMENT, FIRE DEPARTMENT, AND 911 SHALL BE NOTIFIED 24 HOURS
IN ADVANCE.
3. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH "STANDARD
SPECIFICATIONS FOR MUNICIPAL PUBLIC WORKS CONSTRUCTION" PREPARED
BY WASHINGTON STATE CHAPTER AMERICAN PUBLIC WORKS ASSOCIATION,
LATEST EDITION (APWA) AND CITY OF RENTON STANDARD SPECIFICATIONS.
4. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE
AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE
TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE.
5. A PRECONSTRUCTION CONFERENCE AND A 24 HOUR NOTICE SHALL BE
REQUIRED PRIOR TO STARTING NEW CONSTRUCTION. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS
PRIOR TO STARTING CONSTRUCTION. (INSPECTION WILL BE
ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY OF RENTON.) IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE CITY
INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION.
6. CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND
SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND
OTHERS ON THE CONSTRUCTION SITE.
7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN
STREET USE AND ANY OTHER RELATED PERMITS PRIOR TO ANY
CONSTRUCTION.
8. PLANS APPROVED BY THE CITY OF RENTON, DEVELOPMENT SERVICES
DIVISION, SHALL TAKE PRECEDENCE OVER ALL OTHER PLANS.
9. A COPY OF THESE APPROVED PLANS UST BE ON THE JOB SITE
WHENEVER CONSTRUCTION IS IN PROGRESS.
10. THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH AN
AS —BUILT DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN
STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR
LICENSED PROFESSIONAL SURVEYOR.
11 _ BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE
IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 6 INCHES, MAXIMUM DEPTH
OF 8 INCHES, THOROUGHLY TAMPING EACH LAYER TO 95 PERCENT OF
MAXIMUM DENSITY. THESE COMPACTED LAYERS MUST EXTEND FOR ONE
PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE
TRENCH. MATERIALS TO COMPLETE THE FILL OVER PIPE SHALL BE THE
SAME AS DESCRIBED.
12. OPEN CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING
TRAVELED ROADWAY SHALL BE BACKFILLED WITH CRUSHED ROCK AND
MECHANICALLY COMPACTED. CUTS INTO THE EXISTING ASPHALT SHALL BE
NEATLINE CUT WITH SAW IN A CONTINUOUS LINE. A TEMPORARY MIX
PATCH MUST BE PLACED IMMEDIATELY AFTER BACKFILL AND COMPACTION.
A PERMANENT HOT MIX PATCH SHALL BE PLACED WITHIN 10 DAYS AND
SHALL BE PER CITY OF RENTON CURRENT STANDARDS.
13. DATUM SHALL BE CITY OF RENTON, USGS..
14. ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR
OTHERWISE STABILIZED TO THE SATISFACTION OF THE DEPARTMENT FOR
THE PREVENTION OF ON -SITE EROSION AFTER THE COMPLETION OF
CONSTRUCTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY
PREPARED FOUNDATION IN ACCORDANCE WITH SECTION 7-02.3(1) OF THE
CURRENT STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF
THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL AS WELL
AS PLACEMENT AND COMPACTION OF REQUIRED BEDDING MATERIAL TO
UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
SUPPORTED ON A UNIFORMLY DENSE UNYIELDING BASE. PIPE BEDDING
SHALL BE PEA GRAVEL 6" ABOVE AND BELOW THE PIPE_
16. SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC)
RUBBER GASKETED ASTM D 3034, SDR 35, OR DUCTILE IRON CLASS 50-
17. IN UNIMPROVED AREAS, MANHOLE TO EXTEND MINIMUM 6 INCH AND
MAXIMUM 18 INCH ABOVE FINISHED GRADE. IN PAVED AREA, COVER MUST
SLOPE IN ALL DIRECTIONS TO MATCH PAVING.
CITY OF RENTON
DEPARTiMff OF PUBLIC MORES
APPROVED SOUND MITSUBISHI SUBARU
0 USED CARS
�SANITARY SEWER DETAILS AND NOTES
DmGNED: C-E.L. DATE: 01 /25/96 FILE wue SEWDET
DRAWN: C M M, A' KAF
CHECKED: _ _ V _ Sc&E: N . T. S . FIELD BOOK_ PAGE:
BY APPR. DATE APPROVED: SHEET: 9 OF: 12
ortscroa OF aueuc womG