Loading...
HomeMy WebLinkAboutSWP2702240.2463 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 Material to b( 31 114" plate galv 30 fabrication pE 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 0 11 J�10 �Q W VI M 9 Z_ 'T 8 O 7 'Swig 1 JOW Ob - f- Z Cw J 4 DESIGNED BY o = ~3 ENTERED BY v ' t-- w = o CHECKED BY NNS `2 PROJ. ENGR. 1 DIST. ADM. D.B. MLLBY G. WEBBER J. JOHNSON R.Q. ANDERSON 12" SMOOTH COUPLING BAND FOR CONCRETE PIPE 3" PLATE DETAIL NOTES: 1. Payment for pipe anchors which shall include all pipe stakes and hardware shall be considered as incidental and shall be included in the per linear foot cost of pipe. 2. The smooth coupling band shall be used in combination with concrete pipe. 3. Concrete pipe without bell and spigot shall not be installed on grades in excess of 20%. 4. The first anchor shall be installed on the first section of the lower end of the pipe and remaining anchors evenly spaced throughout the installation. 5. If the pipe being installed has a manhole or catch basin on the lower end of the pipe, the first pipe anchor may be eliminated. 6. When C.M.P. is used, the anchors maybe attached to the coupling bands used to join the pipe as long as the specified spacing is not exceeded. 7. All pipe anchors shall be securely installed before backfilling around the pipe. ling band 4 couplin Flatten to point REM�ON ISTATEI FED. AI D PROJ . NO. 10 WASH JOB NUMBER 91WO97 CONTRACT NO. I-IR-405-3(783) r :)e) ANCHOR SPACING SCHEDULE Pipe Maximum Anchor Spacing 4:1 Slope * 3:1 Slope 2:1 Slope Dia• Conc.-C.M.P. Conc. C.M.P. Conc. C.M.P. 8" 125" 250' 95" 190' 65' 135' 12" 55' 130' 40' 100' 30' 70' 18" 25' 65 20 50' 15' 35' For grades 10% to 20% For grades 20% to 30% - For grades 30% to 40% For grades 40% to 55% ate (see Detail) Use spacing for 4:1 slope Use spacing for 4:1 slope Use spacing for 3:1 slope Use spacing for 2:1 slope The number of pipe anchors per run of pipe shall be determined by the following formula: Number of Anchors - Length of Pipe Spacing from Schedule 1. Fractions 0.3 or larger shall be rounded to the next higher number. 2. Fractions below 0.3 shall be dropped except the minimum number of anchors shall be one (1) when more than one section of pipe is used. al to be ASTM A 36 galvanized fabrication per ASTM A 153 1 �/z" x 6' pipe stakes each side of culvert ANCHOR ASSEMBLY - CORRUGATED METAL PIPE HIGHWAY DIYISIDN TrWvshington State Af Department of Transportation Z GA2:[ 110002791 W097D.DGN;1 FOR "AS CONSTRUCTED PLANS" ONLY SR 405 SOUTH RENTON TO SUNSET BLVD.-HOV DRAINAGE DETAILS DP-21 SHEET 1:5Z OF IP54 SHEETS DATE I DATE REVISION M li -�2�0/ SR