INDEX OF DRAWINGS
SHEET_ NO.
1
2
4
CITY OF RENTON, WASHINGTON
HIGH AVENUE SOUTH
STORMWATER OUTFACE IMPROVEMENTS
SW 1/4 SEC 17 TWN 23N RGE 5E W.M.
DESCRIPTION
VICINITY MAP &TITLE SHEET
PLAN AND PROFILE SHEET
TYPICAL DETAILS
TYPICAL DETAILS
CONSTRUCTION NOTES
1) Contractor is responsible for providing stormwater bypass system for High Avenue South drainage
during construction when existing 12" is taken out of service for construction of new HDPE pipe.
Bypass must be approved by the Engineer.
2) Contractor shall take precautions at edge of the slope to prevent further landsliding.
3) Suggested Construction sequence:
1. Install erosion control features
2. Construct Outlet Structure
3. Move sprinklers, yard lights, and shrubs at top of slope
4. Fuse HDPE pipe and install along approximate alignment
5. Construct trenches and dispose of existing pipe and structure
6. Install new Type 2 48—inch CB
7. Connect HDPE pipe and place CDF
B. Finalize pipe alignment and install lateral pipe anchors
STORMWATER DRAINAGE NOTES
9. Restore Landscape
11
A copy of these approved plans must be on the job site whenever construction is in progress.
10.
Construct cedar picket fence
2)
Datum shall be U.S.G.S. unless otherwise approved by City of Renton. Reference benchmark and
elevation are noted on the plans.
3)
Structures shall not be permitted within 10 feet of the spring line of any storm drainage pipe, or 15 feet
from the top of any channel bank.
EROSION CONTROL NOTES
4)
All catch basin grates shall be depressed 0.10 feet below pavement level.
5)
All building downspouts footing drains be to the drainage
1)
All limits of clearing and areas of vegetation preservation as prescribed on the plan shall be clearly
and shall connected storm system, unless
flagged in the field and observed during construction.
approved by the Development Services Division. An accurately dimensioned Certified as —built drawing
of this drainage system shall be submitted to the City of Renton upon completion.
6)
In to 6 inch 18 inch finished
2)
All required sedimentation/erosion control facilities must be constructed and in operation prior to land
unimproved areas, manhole extend minimum and maximum above grade.
clearing and/or other construction to insure that sediment laden water does not enter the natural
In paved area, cover must slope in all directions to match paving.
drainage system. All erosion and sediment facilities shall be maintained in a satisfactory condition
7)
All construction shall be in accordance with the 1994 edition of the "Standard Specifications for Road,
until such time that clearing and/or construction is completed and potential for on —site erosion has
Bridge and Municipal Construction" prepared by W.S.D.O.T., and the American Public Works Association (APWA),
passed. The implementation, maintenance, replacement and additions to erosion/sedimentation
as amended by the City of Renton and the special provisions for this project.
control systems shall be the responsibility of the contractor.
8)
The Contractor shall be responsible for providing adequate safeguard, safety devices, protective equipment,
3)
The erosion and sedimentation control systems depicted on these plan sheets are intended to be minimum
flaggers, and any other needed actions to protect the life, health, and safety of the public, and to
requirements to meet anticipated site conditions. As construction progresses and unexpected or
protect property in connection with the performance of work covered by the contract. Any work within
seasonal conditions dictate, the contractor shall anticipate that more erosion and sedimentation control
the traveled right—of—way that may interrupt normal traffic flow shall require an approved traffic control
facilities will be necessary to insure complete siltation control on the proposed site. During the course
plan by the Transportation Division. All sections of the W.S.D.O.T. Standard Specifications 1-07-23,
of construction, it shall be the obligation and responsibility of the contractor to address any new
Traffic Control, shoal apply.
conditions that may be created by his activities and to provide additional facilities, over and above
LEGEND
minimum requirements, as may be needed to protect adjacent properties and water quality of the
receiving drainage system.
NEW CATCH BASIN / CONTROL STRUCTURE
SANITARY SEWER MANHOLE
4)
During the time period of November 1 through March 31, all project disturbed soil areas greater than
5,000 square feet, that are to be left unworked for more than twelve (12) hours, shall be covered by
WATER LINE W
mulch, sodding, or plastic covering.
STORMDRAIN LINE
5)
In any area which has been stripped of vegetation and where no further work is anticipated for a period
SD
of 30 days or more, all disturbed areas must be immediately stabilized with mulching, grass planting or
SANITARY SEWER LINE
other approved erosion control treatment applicable to the time of year in question. Grass seeding
SS
alone will be acceptable only during the months of April through September inclusive. Seeding may
POLE POLE
proceed, however, whenever it is in the interest of the contractor, but must be augmented with
mulching, netting, or other treatment approved by the City of Renton, outside the specified time period.
GUY ANCHOR E—
YARD LIGHT
6)
Issuance of the Building or Construction Permit by the City of Renton does not relieve the contractor of the
t' ' I 1 ;1 1; t' d 1' b'I't 4.4 'th
con Nurng ego o rga non an /or ra r I y connec e wr storm water drsposrtron. Further, the Crty of
Renton does not accept any obligation for
the proper functioning and maintenance of the system
providea during construction.
7) The Contractor shall be responsible for providing
adequate safeguard, safety devices, protective
equipment, flaggers, and any other needed
actions to protect the life, health, and safety of the public,
and to protect property in connection with
the performance of work covered by the contract. Any work
EN T R
A N
C 0
within the traveled right—of—way that may
interrupt normal traffic flow shall require an approved traffic
control plan by the Transportation Division.
All sections of the Renton Standard Section
ENGINEERS - SCIENTISTS
- PLANNERS
- SURVEYORS
1-07.23, Traffic Control shall apply.
WASHINGTON
ARIZONA
IDAHO
8) Special drainage measures will be required
if the project location is within the aquifer protection area.
5 wio- -??71
N
� N M W, � NA � ME,
=
Z
_
Z
0
w
Z NE 18TH ST
BLVD
z
o
a
C
a
NE 12TH ST
NE Pp�tK
CA�p
Z-
-y
oU' `yJOQ
Z 900 = NE 10TH
SE
1ST
Z N 8TH
ST =
a
RENTON = Z
=
x "F NE 10- ST Z
' �`
MUNICIPA
N W oz
IRPORT
_
0 Z =<
`
vm
Y
N 6TH ST
_
O
<
a
7
N 4TH
ST
Z 40
NE 4TH ST
" 3RD ST
<o
p '�
AIRPORT WAY
5
®
NE
+
3 s�
H m
PROJECT
z
S 2ND ST
RD Q ®S 3RD ST
N (A
LOCATION
S(/O
9�Q (y (n In
ti R9 S a <
2
❑
j
soo
Y Z
ti
gU�.VC�N
yy
goad € rn W
3 W.
W
6TH ST
In
STa
�nS 7M CT
S 77H ST
In
s1 s
o
s�
EDAR
G
WAY
RENTON
GRJ�Y
Z
=
405
eV
RGlyc�,ON
16TH
ST
ass
1 fi7
Ly
y
ry
2
k4Y
PUGET
e9 S
o
0
y AN j
A
�16STE¢� w� SHEETS 1 THRU 4 OF
NAL `��,�►��� THESE PLANS SHALL
BE DEEMED APPROVED
BY THE SIGNATURE AND
EXPMs 8� 9G SEAL ON THIS SHEET.
NO. I REVISION BY I APPR.
/ 2--/% 6,�
RECOMMENDED
VOR APPROVAL
y--- -- -
CITY OF RENTON
DEPARTMENT OF PUBLIC WORKS
HIGH AVENUE SOUTH
STORMWATER OUTFALL IMPROVEMENTS
DESIGNED: BWJ DATE: 7110196 FILE NAME: HATITLE.DWG
DRAWN: KAK
CHECKED: JWM SCALE: N.T.S. FIELD BOOK: PAGE:
DATE APPROVED: SHEET: 1 OF: 4
DIRECTOR OF PUBLIC WORKS