Loading...
HomeMy WebLinkAboutSWP2702711.12T T cv N r 3 38 S Am s`0 EXPIRES: 8/20/2007 fey 8z �8borz8, Ina C❑NSULTING ENGINEERS 701 DEXTER AVENUE NORTH SUITE 200 SEATTLE, WASHINGTON 98109 (206) 284-0860 NO. REVISION n A1= m SURVEYED: DESIGNED: B.B. DRAWN: P.M. CHECKED: S.C. APPROVED: B.B. AS SHOWN ONE INCH I AT FULL SCALE-11 IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVE) 19M HORIZONTAL_• NAD 1983/1991 DATUM - CITY OF RENTON Planning/Building/Public Works Dept. WORK AREA GENERAL NOTES 1. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE CITY FOR REVIEW AND APPROVAL. AT LEAST ONE LANE OF S RENTON VILLAGE PL SHALL BE KEPT OPEN FOR TRAFFIC DURING CONSTRUCTION HOURS. BOTH LANES SHALL BE OPEN TO TRAFFIC AFTER CONSTRUCTION HOURS. 2. - 3. THE CITY MAY REQUIRE THE CONTRACTOR TO ADJUST THE TRAFFIC CONTROL PLAN, WORK AREA, AND PARKING LIMITS AS NEEDED TO MAINTAIN BUSINESS ACCESS AND PARKING. 4. AREAS OF PARKING LOT NOT BEING USED BY THE CONTRACTOR SHALL BE RETURNED TO PARKING USE FOR THE BUSINESSES. 5. THE CONTRACTOR SHALL NOTIFY THE CITY AND PROPERTY OWNER AT LEAST 7 DAYS IN ADVANCE OF USING A WORK AREA AND BLOCKING OFF PARKING. 6. THE CONTRACTOR IS RESPONSIBLE FOR PLACING NO PARKING SIGNS AND TEMPORARY FENCING FOR ALL WORK AREAS. NO PARKING SIGNS SHALL BE PLACED AT LEAST 2 DAYS IN ADVANCE OF CLOSING A PARKING AREA. WORK AREA NOTES AND LIMITS A. CONTRACTOR STAGING AND STORAGE AREA. MAXIMUM AREA THAT MAY BE USED DURING THE PROJECT. B. AREA MAY BE TEMPORARILY CLOSED DURING CONSTRUCTION. AREA SHALL BE REOPENED TO TRAFFIC AND PARKING AFTER CULVERT CONSTRUCTION PASSES IT. C. PLACE TEMPORARY PATCH OR STEEL SHEETING ON AREAS TO REOPEN TO TRAFFIC AND PARKING. D. CONTRACTOR SHALL KEEP AT LEAST ONE LANE OF STREET OPEN TO TRAFFIC DURING CONSTRUCTION. E. PLACE SIGN "CONSTRUCTION AHEAD" "LOCAL TRAFFIC ONLY" "EXPECT DELAYS" F. THIS AREA MAY BE TEMPORARILY CLOSED AND USED FOR STAGING AND STORAGE FOR CULVERT CONSTRUCTION BETWEEN STATION 15+00 AND THE 144" CATCH BASIN. THE AREA MAY BE USED FOR TEMPORARY STAGING AND STORAGE FOR THE SEWER ENCASEMENT AND WATER LINE RELOCATION. THE AREA WILL BE REOPENED FOR PUBLIC PARKING AFTER EACH OF THOSE WORK ITEMS ARE COMPLETE. G. AREA MAY BE CLOSED TO TRAFFIC AND PARKING DURING CONSTRUCTION. AFTER CULVERT CONSTRUCTION PASSES THE AREA PLACE A TEMPORARY PATCH AND REOPEN IT FOR TRAFFIC. D-271112 RECOMMENDED FOR APPROVAL By:- z:> — L- Datel-- 41- y-o Byl---------------- Datel-------- Byl---------------- Datel-------- Byl---------------- Datel-------- DI-1217,1 RENTON VILLAGE STORM SYSTEM PROJECT WORK AREA AND LIMITS 1�1�2 DAW- 4/6/07 FIELDBOOK: PAGE DRAWING W. SHEET: 12 OF12