Loading...
HomeMy WebLinkAboutSWP2702817.274 3 2 A U Eo NOTES: 1. GRADE SHALLOW DRAINAGE SWALE TO ENSURE CONTINUOUS (3% MAX) SLOPE TO TOP OF CATCH BASIN. 2. THIS AREA CONTAINS 18 NDB RADIALS, 60' IN LENGTH APPROXIMATELY 1' BELOW GROUND SURFACE. THIS AREA SHALL NOT BE DISTURBED DURING RE —GRADING ACTIVITIES. 3. EXISTING TAXIWAY PAVING TO BE REMOVED. REGRADE AREA AS SHOWN. 4. REMOVE EXISTING CATCH BASIN AND ASSOCIATED, 450 SLOPED ASPHALT PATCH. INSTALL 12" CONCRETE CONNECTOR PIPE TO JOIN EXISTING PIPE ENDS, THEN BACKFILL TO MATCH SURROUNDING GRADE. 5. ADD COLLAR TO ADJUST TOP OF EXISTING CATCH BASIN TO MATCH SURROUNDING GRADE. REMOVE I 0 I I =� I SCALE:: 1 " = 30' REVISIONS SYMBOL ZONE DESCRIPTION DATE By MODIFIED PER AS -BUILT INFORMATION 7/2001 JLM IF SHEET IS LESS THAN 32" X 21" IT IS A REDUCED PRINT, REDUCE SCALE ACCORDINGLY U.S. ARMY ENGINEER DISTRICT, SEATTLE CORPS OF ENGINEERS SEATTLE, WASHINGTON LOWER CEDAR RIVER FLOOD CONTROL LEVEES AND FLOODWALLS LEFT BANK AIRPORT DRAINAGE IMPROVEMENTS it I s !�D I GRAFTING 4 3 2 RENTON WASHINGTON SIZE �NVITATi_`; N0. FILE No _ DATE_ PLATE D B-99-0017 E-19-1-70 98DEC03 C-19 DSGN. PWN BRB SHEET 27 SCANNED SEP 13 211e2