Loading...
HomeMy WebLinkAboutSWP2702831.3NOTE: 71, J Z a O 0 to U U Ld n ~ LaJ w J w JQ ryN cL oLLJ n Z Q LLl Z z= V)O <� U z THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON THESE PLANS ARE BASED ON FIELD SURVEY DATA PROVIDED BY ENTRANCO. THIS WAS THE INFORMATION AVAILABLE AT THE TIME OF PLAN PREPARATION. ACTUAL CONDITIONS MAY BE DIFFERENT. THE CONTRACTOR MAY ENCOUNTER VARIATIONS BETWEEN ACTUAL CONDITIONS AND THOSE SHOWN. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONTRACTOR SHALL LIMIT VEGETATION REMOVAL AND SLOPE DISTURBANCE. CONTRACTOR SHALL NOT REMOVE TREES WITHIN THE CLEARING LIMITS, UNLESS ABSOLUTELY NECESSARY. ONLY GRUBBING OF UNDERBRUSH WILL BE ALLOWED. �E: 1 F Ell SOLID Cf,.. IN T)r TO BE REMOVED REMOVE EXISTING I -BEAM -- j' AND SUPPORT STRUCTURE Lo tAj, V) PROPOSED 20' BY 20' TEMPORARY CONSTRUCTION EASEMENT ............... to3'.�20...... ............................. .........;........ ........ :. .. ... ; .. ; .. ; ; ; .. ; ... ; ; .. ; .... ........ NO VEHICLE ACCESS EXISTING GROUND POND' Q. 00 " �.-- E B 41w ii i i I'�X �.. STA. :0+00 310,�3, ui o 2S0....::::::.. : IE 301.10, 20" HDPE SW REMOVE EXISTING CB r CONNECT TO EXIST. CB MINIMUM RADIUS OF DEFLECTION FOR 20" OD HDPE PIPE REMOVE EXISTING PIPE ......IS.30, PER MANUFACTURER'S RECOMMENDATIONS..................................................................... --. ........................................................................................... m n STA.- 1 +37 w 16"� PETROLEUM PIPELINE �'' a TOP: OF PIP = 260.....;...... . Q�Q QF, D STA.' 1 +47 ... ......... V ......... :......... ;......... :......... ;.... .....;...;.........;.........;.........;...�� :... :. .;......20„0 PETROLEUM• ; `, PIPE 'INE............................................ TOP' PIPE OF - .280.8 ,,,woo U w < �. w MAINTAIN MIN. V: CLEARANCE + lt Q w w d BETWEEN STORM 'DRAIN AND : > Z o PETROLEUM PIPLINE � :::: F� '+ : .......................... x -........................... ............z4a a Z o a LLJ rri 20.... ::::::::(r�:.::::::::::::::::::::::::::::::.:::::::..:.::.... ................. ............:......:::::::::::::::::::::::::.:::::::::::::::::::::::::::::::::::: afro, 1Y . Je 26941 � a UTILITY ONE CALL FSs'ONAL Slt%O� 1—800-424-5555 OLYMPIC PIPELINE cvP1RRR CALL 46HOURs BEFORE YOU DIG r ML d C�7 9 m b d O It z� �m o Y � � O � m O n � m