THE EXISTING TOPOGRAPHIC AND PHYSICAL FEATURES SHOWN ON
THESE PLANS ARE BASED ON FIELD SURVEY DATA PROVIDED BY
ENTRANCO.
THIS WAS THE INFORMATION AVAILABLE AT THE TIME OF PLAN
PREPARATION. ACTUAL CONDITIONS MAY BE DIFFERENT. THE
CONTRACTOR MAY ENCOUNTER VARIATIONS BETWEEN ACTUAL
CONDITIONS AND THOSE SHOWN.
THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF
ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND
AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL
DAMAGES WHICH MIGHT BE OCCASIONED BY THE
CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND
PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
CONTRACTOR SHALL LIMIT VEGETATION REMOVAL AND SLOPE
DISTURBANCE. CONTRACTOR SHALL NOT REMOVE TREES WITHIN
THE CLEARING LIMITS, UNLESS ABSOLUTELY NECESSARY. ONLY
GRUBBING OF UNDERBRUSH WILL BE ALLOWED.
�E: 1 F Ell
SOLID Cf,.. IN T)r
TO BE REMOVED
REMOVE EXISTING I -BEAM
-- j' AND SUPPORT STRUCTURE
Lo
tAj,
V)
PROPOSED 20' BY 20'
TEMPORARY CONSTRUCTION EASEMENT
...............
to3'.�20...... ............................. .........;........ ........ :. .. ... ; .. ; .. ; ; ; .. ; ... ; ; .. ; .... ........
NO VEHICLE ACCESS EXISTING GROUND
POND'
Q. 00 " �.-- E B 41w
ii i i I'�X �.. STA. :0+00 310,�3,
ui
o
2S0....::::::.. :
IE 301.10, 20" HDPE SW
REMOVE EXISTING CB r CONNECT TO EXIST. CB
MINIMUM RADIUS OF DEFLECTION FOR 20" OD HDPE PIPE
REMOVE EXISTING PIPE
......IS.30, PER MANUFACTURER'S RECOMMENDATIONS..................................................................... --. ...........................................................................................
m
n
STA.- 1 +37
w 16"� PETROLEUM PIPELINE
�'' a TOP: OF PIP =
260.....;...... .
Q�Q
QF, D STA.' 1 +47 ... .........
V
......... :......... ;......... :......... ;.... .....;...;.........;.........;.........;...�� :... :. .;......20„0 PETROLEUM• ;
`,
PIPE 'INE............................................
TOP' PIPE
OF - .280.8
,,,woo U w <
�.
w MAINTAIN MIN. V: CLEARANCE
+
lt
Q w w d BETWEEN STORM 'DRAIN AND :
> Z o PETROLEUM PIPLINE
�
::::
F� '+
: ..........................
x -...........................
............z4a
a
Z
o
a
LLJ
rri
20.... ::::::::(r�:.::::::::::::::::::::::::::::::.:::::::..:.::.... ................. ............:......:::::::::::::::::::::::::.::::::::::::::::::::::::::::::::::::
afro, 1Y . Je
26941
� a
UTILITY ONE CALL FSs'ONAL Slt%O�
1—800-424-5555
OLYMPIC PIPELINE cvP1RRR
CALL 46HOURs